[1. Call to Order.]
[00:00:04]
ALL RIGHT. GOOD EVENING EVERYBODY.
WELCOME TO THE CITY OF SOUTHLAKE CITY HALL.
APPRECIATE YOU BEING WITH US TONIGHT.
SORRY. WE'RE STARTING A FEW MINUTES LATE.
OUR WORK SESSION RAN A COUPLE MINUTES LONG.
MY NAME IS DAN KUBIAK, CHAIRMAN OF THE PLANNING ZONING COMMISSION MEETING.
[4. Chairman Comments. ]
THIS IS OUR SEPTEMBER 5TH, 2024 MEETING.MAYBE JUST A REALLY QUICK SUMMARY IN TERMS OF HOW THESE WORK FOR ANYBODY WHO MIGHT BE.
I SEE SOME REGULAR FACES AND I SEE SOME NEW FACES.
WE'LL HEAR A STAFF PRESENTATION ON EACH ITEM.
AND THEN TYPICALLY THE APPLICANT WILL PROBABLY COME UP ON EACH ITEM AND WE'LL PROBABLY HAVE EITHER HOPEFULLY A VERY BRIEF PRESENTATION OR SOME, SOME Q&A FROM THE COMMISSIONERS, AND THEN WE'LL OPEN A PUBLIC HEARING FOR EACH ITEM.
AND THAT'S WHERE YOU CAN COME UP TO THE PODIUM AND ADDRESS US.
YOU'LL GET UP TO THREE MINUTES, WHICH WILL HAVE SOME KIND OF GREEN YELLOW RED LIGHTS UP THERE, JUST IN CONSIDERATION OF THE OTHER SPEAKERS AND ITEMS ON THE AGENDA, YOU CAN USUALLY FIND, YOU CAN SAY KIND OF WHAT YOU WANT TO SAY WITHIN THREE MINUTES, I'D SAY.
IT'S YOUR MICROPHONE, BUT TO THE EXTENT YOU CAN MAKE THE COMMENTS AS PERTINENT TO THE ITEMS THAT WE'RE REVIEWING THIS EVENING, THAT'S THE MOST HELPFUL FEEDBACK, BECAUSE THERE'S A LOT OF ITEMS THAT ARE KIND OF BEYOND OUR PURVEY.
SO THAT'S A LITTLE BIT OF HOW THE MEETINGS WORK.
[3. Administrative Comments. ]
AT YOUR LAST MEETING, WE ANNOUNCED THE CORRIDOR PLANNING COMMITTEE MEETING THAT WAS PLANNED FOR SEPTEMBER 25TH.WE HAVE CANCELED THAT MEETING DUE TO CONFLICT WITH THE CARROLL HIGH SCHOOL HOMECOMING PARADE, AND WE'RE LOOKING FOR AN OCTOBER DATE TO RESCHEDULE THAT.
AS SOON AS WE'RE ABLE TO DO THAT.
SO WE'LL ALL EXCITEDLY KEEP AN EYE OUT FOR THAT.
I'VE MADE THE CHAIRMAN'S COMMENTS ON THE AGENDA.
SO MAYBE WE'LL JUST HANDLE THE MINUTES REAL QUICK, AND THEN I'LL TALK ABOUT AGENDA ORDER.
[5. Consider: Approval of the minutes for the Planning and Zoning Commission meeting held on August 22, 2024.]
WE'VE ALL BEEN GIVEN A COPY OF THOSE MINUTES.ANY QUESTIONS OR COMMENTS ON THOSE ITEMS, OR CAN WE ENTERTAIN A MOTION? LOOKS LIKE WE CAN PROBABLY TAKE A MOTION ON IT.
OKAY. WE HAVE A MOTION. DO WE HAVE A SECOND? SECOND. ALL RIGHT.
PASSES 6 TO 0, WITH ONE ABSTENTION.
SO WITH THAT, THE ITEMS ON THE AGENDA THIS EVENING, WE'RE GOING TO TAKE ITEM NUMBER EIGHT FIRST WHICH IS THE ZONING CHANGE CONCEPT PLAN FOR NORTH WHITES CHAPEL WHICH I BELIEVE THAT APPLICANT HAS PROBABLY THE YOUNGEST PERSON IN THE ROOM.
SO WE'RE GOING TO TRY AND DO THEM A FAVOR AND MOVE THEM ALONG AS QUICKLY AS POSSIBLE.
JUST SO WE HAVE PLENTY OF TIME FOR, FOR ANY PRESENTATIONS OR DISCUSSIONS.
APOLOGIES FOR THAT. AGAIN. THAT'LL BE EIGHT, SIX, NINE THEN SEVEN.
SO, WITH THAT WE'LL GO AHEAD AND KICK OFF THE STAFF PRESENTATION ON ITEM NUMBER EIGHT.
[8. Consider: ZA24-0043, Zoning Change and Concept Plan for 2561 N. White Chapel Blvd., on property described as Lot 2, Block 1, Woodall Addition, Southlake, Tarrant County, Texas. Current Zoning: "AG" Agricultural District. Proposed Zoning: "SF-1A" Single Family Residential District. SPIN Neighborhood #1. PUBLIC HEARING]
YES. GOOD EVENING. THE APPLICANTS ARE REQUESTING APPROVAL OF A ZONING CHANGE AND A CONCEPT PLAN ON PROPERTY DESCRIBED AS LOT TWO, BLOCK ONE, WOODALL ADDITION, AND THE PURPOSE OF THIS IS TO SEEK APPROVAL FOR THE ZONING CHANGE FOR THE PURPOSE OF BUILDING A NEW HOUSE.AND THE LOCATION IS 2561 NORTH WHITECHAPEL BOULEVARD.
HERE IS AN AERIAL VIEW SHOWING THE LOCATION OF THE LOT.
THE FUTURE LAND USE IS LOW DENSITY RESIDENTIAL AND THE CURRENT ZONING IS AG AGRICULTURAL DISTRICT.
AND WE JUST AS A SURVEY, IT SHOWS A LITTLE BIT MORE CLEARLY THE TWO LOTS.
AGAIN, THE ZONING CHANGE IS JUST FOR THIS LOT HERE.
LOT TWO, THEY'RE REQUESTING THE SF1A ZONING.
AND HERE IS NORTH WHITECHAPEL.
AND IT ONLY APPLIES TO THIS LOT HERE.
[00:05:01]
BE HAPPY TO ANSWER ANY QUESTIONS? SO, THERE'LL BE ONE RESIDENTIAL STRUCTURE ON THIS LOT, CORRECT? ACTUALLY I'M NOT. WAS THERE? THAT'S I THINK THAT'S THE.I DON'T THINK THERE WAS A HOUSE ON THIS LOT.
I THINK THAT'S PLANNED TO BUILD A NEW RESIDENTIAL HOME ON THE LOT.
YES. YES. THEY'RE PLANNING TO BUILD A NEW HOUSE.
JUST WANTED TO CONFIRM. I'M NOT SURE IF THERE WAS ONE THERE.
NO, I DIDN'T PHRASE THAT WELL.
ANY OTHER QUESTIONS FOR STAFF ON THIS ONE? JUST FOR CLARITY.
SO THE DRIVEWAY EASEMENT IS IN PLACE, AND SO THERE'S NO CONFLICT ABOUT THAT AT ALL.
ANY OTHER QUESTIONS FOR STAFF? ALL RIGHT. THANK YOU.
DO WE HAVE THE APPLICANT ON THIS ITEM? DO YOU MIND COMING FORWARD REAL QUICK? MAYBE JUST STATE YOUR NAME AND ADDRESS.
WE'LL SEE IF THERE'S ANY QUESTIONS.
YOU CAME ALL THE WAY DOWN HERE, SO AT LEAST WE'LL PUT IT ON THE RECORD.
I'M ASSUMING THAT'S THE REST OF YOUR FAMILY BACK THERE.
SO, DO YOU MIND STATING YOUR NAME AND ADDRESS FOR.
AND ADDRESS. AND WHAT HOME ADDRESS? THIS ADDRESS OR MY ACTUAL PHYSICAL HOME ADDRESS NOW? PHYSICAL. YOUR PHYSICAL HOME. 2333 KIRBY STREET, DALLAS, TEXAS.
ANY QUESTIONS FOR THIS APPLICANT? ANYONE. I JUST HAVE A QUICK QUESTION.
I'M NOT SEEING IT ON HERE. HOW LARGE IS THIS LOT? SQUARE FEET, 1.71.75 ACRES.
OKAY. THANKS. ANY OTHER QUESTIONS? COMMENTS? ALL RIGHT.
I THINK WE'RE GOOD. I JUST WANT TO PUT ON THE RECORD YOU SHOWED UP.
THAT'S USUALLY I CAN'T PLAY IF YOU DON'T SHOW UP USUALLY HERE.
ITEM NUMBER EIGHT ON THE AGENDA THIS EVENING DOES REQUIRE A PUBLIC HEARING.
I'LL GO AHEAD AND OPEN THAT PUBLIC HEARING.
IF ANYONE WOULD LIKE TO COME FORWARD AND COMMENT ON THIS ITEM.
AND SEEING NO ONE, WE WILL GO AHEAD AND CLOSE THE PUBLIC HEARING ON ITEM NUMBER EIGHT.
ANY OTHER QUESTIONS OR COMMENTS BEFORE WE ENTERTAIN A MOTION? ALL RIGHT. MR. CHAIRMAN, I MAKE A MOTION THAT WE APPROVE ITEM NUMBER EIGHT ON OUR AGENDA.
ZA 24-0043, SUBJECT TO OUR STAFF REPORT DATED AUGUST 30TH, 2024 AND ALSO SUBJECT TO THE CONCEPT PLAN REVIEW SUMMARY NUMBER TWO DATED AUGUST 30TH, 2024.
OKAY, WE HAVE A MOTION. DO WE HAVE A SECOND? SECOND. ALL RIGHT.
CONGRATULATIONS. PASSED SEVEN ZERO.
RECOMMENDATION TO CITY COUNCIL AND OF COURSE, THE NEXT CITY COUNCIL MEETING DENNIS WILL BE ON.
17. SORRY. WE'LL AMEND THE RECORD.
SEPTEMBER 17TH WILL BE THE NEXT CITY COUNCIL MEETING, ASSUMING THIS ITEM MAKES THE AGENDA.
SO NOW WE WILL JUMP BACK TO ITEM NUMBER SIX ON OUR AGENDA.
[6. Consider: ZA24-0041, Specific Use Permit for a Private School for Carrus Care Southlake, on property described as Lot 11, LBG Hall No. 686 Addition, an addition to the City of Southlake, Tarrant County, Texas, and located at 600 W. Southlake Blvd., Suite 120, Southlake, Texas. Current Zoning: "S-P-1" Detailed Site Plan District. SPIN Neighborhood #6 PUBLIC HEARING ]
A SPECIFIC USE PERMIT FOR A PRIVATE SCHOOL.YES. THIS IS A SPECIFIC USE PERMIT REQUEST FOR A PRIVATE SCHOOL.
THIS IS AN AERIAL VIEW OF THE PROPERTY.
THE CORNER OF 1709 AND SHADY OAKS.
THIS IS A SITE PLAN AND TRAFFIC PLAN EXHIBIT THAT THEY PROVIDED.
YOU CAN SEE HERE THIS IS THE ENTRANCE.
HOW THEY WANT THE TRAFFIC FLOW TO GO AROUND AND EXIT UP HERE.
THERE'S ALSO AN ENTRANCE HERE AND THEY GO AROUND AND EXIT UP HERE AGAIN.
AND YOU CAN SEE IN THIS LITTLE CORNER UP HERE YOU CAN SEE WHERE SUITE 120 IS IN THIS BUILDING.
IT'S JUST THIS CORNER RIGHT HERE.
JUST SOME NARRATIVE HIGHLIGHTS.
CARRUS IS A BEHAVIORAL HOSPITAL.
SO THIS SCHOOL IS A PRIVATE SCHOOL TO FACILITATE, FACILITATE SOME SCHOOLING FOR CHILDREN WHO HAVE BEEN WHO HAVE BEEN IN THE INPATIENT BEHAVIORAL HEALTH HOSPITAL.
THIS IS AN OPTION FOR CONTINUING CARE.
THE PATIENTS ARE THERE FROM ROUGHLY 9 A.M.
TO 5 P.M., AND THERE'S THREE CLASSROOMS WITH A MAXIMUM OF 12 STUDENTS PER CLASSROOM.
EACH CLASSROOM HAS A THERAPIST AND AN AIDE.
THERE'S ALSO A FULL TIME NURSE, A PART TIME PSYCHIATRIST, A RECEPTIONIST, AND AN INTAKE MANAGER.
WE HAVE RECEIVED NO SURROUNDING PROPERTY OWNER RESPONSES.
I'D BE HAPPY TO ANSWER ANY QUESTIONS.
SO, IT'S BASICALLY GOING TO BE LIKE AN ADMINISTRATIVE OFFICE AND THEN CLASSROOMS. YEAH. YES.
IT'S WELL IT'S PRIMARILY I'D SAY CLASSROOMS.
[00:10:02]
JUST CLASSROOMS. YEAH.OKAY. BUT THERE IS AN OFFICE COMPONENT TO IT.
OKAY. WE CAN ASK THE APPLICANT, BUT I GUESS WAS THERE ANY TIME PERIOD REQUESTED ON THIS SUP.
NO, BUT TYPICALLY IN THE PAST, THESE HAVE BEEN TIED TO THE LEASE.
WE'LL ASK THEM, ANY OTHER QUESTIONS.
ALL RIGHT. THANK YOU VERY MUCH.
IS THE APPLICANT HERE THIS EVENING? DO YOU MIND? SAME.
SAME DRILL. IF YOU DON'T MIND.
JUST SAY YOUR NAME AND ADDRESS FOR THE RECORD.
IT CAN BE PERSONAL OR BUSINESS ADDRESS.
AND THEN WE'LL JUST PROBABLY HAVE A FEW QUICK QUESTIONS IF THAT'S OKAY.
NATASHA KING AND I'M REPRESENTING CARRAS AND THEN HOME ADDRESSES 2340 WHITE OAK IN LITTLE ELM, TEXAS 75068. THANK YOU VERY MUCH.
DO YOU KNOW THE LENGTH OF YOUR LEASE TERM IN THIS BUILDING? BECAUSE THAT'S TYPICALLY WHAT WE'LL TIE THE TIMING BACK TO FOR THIS SPECIAL USE.
I BELIEVE IT'S I BELIEVE IT'S FIVE.
IT'S EITHER THREE YEARS OR FIVE YEARS.
OKAY. MAYBE WE'LL WORK WITH ON THE MOTION WITH STAFF.
I GUESS MAYBE WE'LL JUST WE'LL JUST MAKE A MOTION THAT WE'LL TIE IT TO THE PRIMARY TERM OF THE LEASE, WHICH MAY BE EITHER 3 OR 5 YEARS TO BE DETERMINED BEFORE CITY COUNCIL. YEAH, CERTAINLY.
AND IN SOME CASES WHERE THEY'VE HAD OPTIONS TO EXTEND IT, IT'S INCLUDED ANY.
INCLUDING ANY CONTRACTUAL LEASE EXTENSIONS.
OKAY. YES, THAT'S SOUND GOOD, COUNSELOR.
OKAY. ANY OTHER QUESTIONS FOR THE APPLICANT? WHAT ARE THE AGES OF THE STUDENTS? IN OUR OUTPATIENT LOCATIONS? WE TAKE FROM 8 TO 17, SO THEY'RE DIVIDED BY AGES.
SO, ONE CLASSROOM MAY BE 8 TO 11.
AND THEN WE HAVE THREE DIFFERENT TYPES.
SO WE HAVE A FAITH BASED CLASSROOM, A MENTAL HEALTH CLASSROOM AND THEN A PD CLASSROOM.
AND DEPENDING ON THEIR DEVELOPMENTAL STAGE THAT 12 YEAR OLD CAN SWING.
AND THEN FOR THE STUDENTS HOW LONG WOULD THEY BE IN THE CLASS.
LIKE WHAT DOES THE DAY LOOK LIKE? SO THEY HAVE THERAPY.
WE DON'T PROVIDE IT. THEY BRING THEIR OWN LUNCH.
AND THEN THEY MAY HAVE INDIVIDUAL THERAPY.
THEY MAY HAVE A FAMILY SESSION.
OKAY. BUT EVERY DAY THEY HAVE THE THERAPY.
THEY HAVE THE SCHOOLWORK, OF COURSE LUNCH BREAKS.
OKAY, SO ARE THEY THERE THE ENTIRE DAY? LIKE, WHAT WOULD THE TYPICAL STUDENT'S LENGTH OF TIME BE AT THE LOCATION? ABOUT NINE TO MAYBE THREE ISH.
WE'RE OPEN UNTIL FIVE, BUT THE KIDS AREN'T THERE UNTIL FIVE.
OKAY. AND THEN SO DURING THE DAY WHEN THEY'RE THERE FROM, SAY, 9 TO 3, OR IS THERE AN OPPORTUNITY FOR THEM TO HAVE A BREAK? I MEAN, AND WHAT I'M GETTING AT IS WE'RE OBVIOUSLY RIGHT TO CLOSE TO 1709.
IS THERE AN OPPORTUNITY FOR THEM TO BE OUT AND MULLING AROUND IN THE PARKING LOT, OR GETTING CLOSE TO 1709, OR HOW DOES THAT WORK? THEY'RE NOT ALLOWED TO GO OUTSIDE UNTIL THEIR PARENTS COME PICK THEM UP.
SO THEY'RE NOT OUT? YEAH, THEY'RE NOT OUT.
YES. WE ARE IN MULTIPLE OTHER LOCATIONS.
AND THEN OUR INPATIENTS IN SHERMAN.
OKAY. ANY OTHER? WELL, MY QUESTION TO THE STAFF WAS, I MEAN, DO YOU HAVE ADMINISTRATIVE OFFICES HERE? CORRECT. SO THE STAFF THAT WAS LISTED IN THERE, THE INTAKE MANAGER, THE NURSE, THE THERAPIST HAVE AN OFFICE? YES. WHEN THE PSYCHIATRIST IS THERE, THEY HAVE AN OFFICE.
YEAH. AND WHERE IS YOUR HEADQUARTERS? FOR THE WHOLE GROUP. FOR ALL YOUR LOCATIONS.
WE'RE OUT OF SHERMAN, WHERE THE INPATIENT HOSPITAL IS.
THANKS. AND I UNDERSTAND YOU'RE NOT WITH THE LANDLORD.
I'M NOT SURE IF THE LANDLORD IS HERE, BUT I'M CURIOUS IF THEY HAD ANY CONCERNS.
CLEARLY THEY DON'T. BUT BANK OK JUST FROM A CIRCULATION STANDPOINT.
AND THE DRIVE THROUGH AND ALL THAT STUFF, I ASSUME THAT'S BEEN ADDRESSED AND THOUGHT THROUGH.
YES. AND IT'S WORKING AT OUR OTHER LOCATIONS AS WELL.
I HAD A QUESTION ABOUT HOW MANY PARKING SPACES ON A DAILY BASIS WOULD PROBABLY BE USED.
RIGHT. SO THAT'S BY APPOINTMENT.
SO JUST FOR THE STAFF, THE KIDS DON'T DRIVE.
[00:15:08]
GOOD. OKAY.ANY OTHER? I JUST HAVE A QUESTION.
SO YOU MENTIONED IT WAS 9 A.M..
DO THEY USUALLY GET DROPPED OFF EARLIER? I'M JUST KIND OF TRYING TO FIGURE OUT WITH, LIKE, THE DURHAM TRAFFIC AND EVERYTHING, HOW THAT'S KIND OF CROWDED SO THEY CAN.
THEY CAN DROP OFF BETWEEN LIKE 830 AND NINE.
THEY'RE ALL ARRIVING AT 9 A.M..
ALL RIGHT. I THINK WE'VE GOT ALL OUR QUESTIONS ANSWERED FOR NOW.
IF WE THINK OF SOMETHING ELSE, WE'LL CALL YOU BACK.
ITEM NUMBER SIX ON OUR AGENDA THIS EVENING DOES CALL FOR PUBLIC HEARINGS.
SO I'LL GO AHEAD AND OPEN THAT UP TO ANYONE WHO WOULD LIKE TO COME FORWARD AND COMMENT ON THIS ITEM.
AND SEEING NO ONE, I'LL GO AHEAD AND CLOSE THE PUBLIC HEARING.
OTHER THAN THE TIMING, I GUESS, AMENDMENT ON THE SUB.
ANY OTHER COMMENTS? QUESTIONS? GOOD.
OKAY, MR. CHAIRMAN, I MAKE A MOTION.
WE APPROVE ITEM NUMBER SIX ON OUR AGENDA.
ZA 24 0041, SUBJECT TO THE STAFF REPORT DATED AUGUST 30TH, 2024.
ALSO SUBJECT TO THE SPECIFIC USE PERMIT REVIEW SUMMARY NUMBER TWO DATED AUGUST 30TH, 2024, AND NOTING THAT THE RECOMMENDATION BE THAT THE SUP IS FOR A LENGTH OF TERM TIED TO THE PRIMARY LEASE AND ANY EXTENSIONS EXERCISED BY THIS TENANT, AND WOULD ALSO ASK THAT THE TENANT GET THE TERM OF THE LEASE PRIOR TO CITY COUNCIL MEETING.
SOUND GOOD? STAFF ARE GETTING A NOD.
WE HAVE A MOTION. DO WE HAVE A SECOND? SECOND. ALL RIGHT, LET'S VOTE, PLEASE.
CONGRATULATIONS AND GOOD LUCK.
IF YOU MAKE THE NEXT CITY COUNCIL AGENDA, WHICH IS ON SEPTEMBER 17TH.
[9. Consider: ZA24-0054, Zoning Change and Site Plan for 1310-1360 N. White Chapel Blvd., on property described as Lots 13R1 - 13R5, T.M. Hood No. 706 Addition, Southlake, Tarrant County, Texas. Current Zoning: "S-P-1" Detailed Site Plan District. Proposed Zoning: "S-P-1" Detailed Site Plan District. SPIN Neighborhood #5. PUBLIC HEARING ]
BOULEVARD. YES.THERE'S NO ACTUAL PHYSICAL CHANGES TO THE SITE.
THIS IS AN AERIAL VIEW OF THE PROPERTY.
THE FUTURE LAND USE IS OFFICE COMMERCIAL AND THE CURRENT ZONING IS SP1 DETAILED SITE PLAN DISTRICT.
AND THIS IS THEIR EXHIBIT OF THEIR BUILDING JUST SHOWING HOW THEY HAVE THE BUILDING LAID OUT.
AND THEY'VE ALSO PROVIDED A TYPICAL SCHEDULE.
WE HAVE RECEIVED NO SURROUNDING PROPERTY OWNER RESPONSES.
I'LL BE HAPPY TO ANSWER ANY QUESTIONS.
ANY QUESTIONS FOR STAFF? ALL RIGHT. I THINK WE'RE GOOD.
WE HAVE THE APPLICANT HERE THIS EVENING FOR THIS ITEM.
ALL RIGHT. DO YOU MIND COMING UP.
AND THEN WE'LL. MR. CHAIRMAN, COMMISSIONERS, MY NAME IS ROBERT PRESLEY.
WE RESIDE AT 1345 LAKESIDE DRIVE HERE IN SOUTHLAKE.
WE'VE BEEN RESIDENTS HERE SINCE ABOUT 1992, YEAR 92 OR 93.
WE WILL NOTE THAT FOR THE RECORD, I HAD TO WAIT.
HAD TO WAIT FOR IT. HE'S GOT YOU.
IS THERE ANY QUESTIONS, WE'D BE HAPPY TO ANSWER THEM.
ANY QUESTIONS? I GUESS I WAS GOING TO ASK KIND OF ABOUT HOURS AND NUMBER OF KIDS, WHICH IT SOUNDED LIKE STAFF KIND OF ADDRESSED.
BUT IT'S A VERY FLUID SITUATION.
IT'S VERY DIFFICULT TO SAY WHAT OUR HOURS WOULD BE.
THERE ARE TIMES WHEN A PARENT MIGHT CALL, OR IN FACT, THE STUDENT MIGHT CALL US AND SAY, GOSH, I HAVE THIS TEST TODAY AND I DON'T GET IT. WE COULD ACTUALLY HAVE ONE OF OUR TUTORS IN THERE AT 6:00 IN THE MORNING TO WORK WITH THEM PRIOR TO THE TEST.
THAT WOULD BE A FREAK KIND OF ARRANGEMENT.
IT WOULDN'T HAPPEN THAT OFTEN, BUT WE COULD HAVE.
THEY'LL TAKE ONE, MAYBE TWO CHILDREN IN THEIR OFFICES.
THE BIG PART OF OUR BUSINESS HAPPENS, OF COURSE, WHEN SCHOOL GETS OUT.
[00:20:03]
THAT'S WHEN THE GROUP SESSIONS BEGIN.THAT BEING THAT KEEPING IT DOWN BELOW THAT 40 NUMBER.
IF WE WERE EVER TO DISCOVER, BECAUSE WE TEACH IN THREE DIFFERENT MANNERS, WE DELIVER IN PERSON.
WE DELIVER VIA THE INTERNET OR ZOOM, AND THERE ARE ALSO RECORDINGS AVAILABLE OF EVERYTHING THAT TRANSPIRES IN OUR CLASSROOMS SO THAT THE STUDENTS CAN GRAB THAT FOR REINFORCEMENT, SHALL WE SAY, COME TEST DAY.
SO IN THE EVENT THAT WE DISCOVER WE HAVE A CLASSROOM THAT GOES PRIMARILY TO THE ONLINE SIDE, AT THAT POINT, WE MIGHT DISCUSS THE POSSIBILITY OF BRINGING ON A OF OPENING UP A THIRD CLASSROOM DURING THAT TIME SLOT.
EVERYTHING'S SLOTTED OFF IN HOURS.
DOES THAT SATISFY THE QUESTION? YEAH. AND AS FAR AS DENNIS WRITING, I MEAN, I WANT TO BE CAREFUL ABOUT ANYTHING WE WRITE INTO A ZONING IN TERMS OF JUST CAPACITY OR CLASSROOMS, JUST TO YOUR POINT, TO ALLOW FLEXIBILITY IN THE FUTURE.
I MEAN, I KNOW YOU MENTIONED 2 OR 2 CLASSROOMS, MAYBE THREE.
I MEAN, I JUST WANT TO BE CAREFUL WE DON'T BOX IT IN TOO TIGHT.
SURE. THEY'RE GOING TO BE BOUND BY WHAT THEIR OCCUPANCY OF THE BUILDING ITSELF IS AND THE NUMBER OF EGRESS POINTS THAT THEY HAVE.
AND SO WE CAN USE OUR ORDINANCES TO JUST ADDRESS THAT WITHOUT DOING ANYTHING SPECIAL IN THE ZONING.
PERFECT. OKAY. THAT'S KIND OF WHAT I THOUGHT.
ANY OTHER QUESTIONS FOR THE APPLICANT.
SO YEAH, ABSOLUTELY. IF ONE GOES TO THE SOUTHLAKE WEBSITE, THERE IS NOTHING THERE TO POINT OUT TO THE NECESSITIES OF SOME OF THESE ACTIONS. NO, NO, CERTAINLY IT WAS AN OVERSIGHT ON OUR PART.
APPRECIATE YOU COMING OUT TONIGHT.
YES, SIR. ITEM NUMBER NINE ON OUR AGENDA DOES REQUIRE A PUBLIC HEARING TONIGHT.
AND SEEING NO ONE, I WILL CLOSE THE PUBLIC HEARING AND ASSUME YOU'RE ALL HERE FOR ITEM NUMBER SEVEN.
SO WITH THAT, ANY OTHER QUESTIONS OR COMMENTS ON THIS ONE? I JUST WISH THEY'D HAD THIS WHEN I WAS IN SCHOOL.
WHEN WAS THAT? WELL, I CAME OVER ON THE ARK.
YOU KNOW, THIS IS OUR AWARD-WINNING COMMISSIONER HERE.
YEAH. SINCE THE BEGINNING THEY WERE INVENTED.
ANY OTHER COMMENTS WE WANT TO PUT ON THE RECORD BEFORE WE ENTERTAIN A MOTION.
I THINK WE'RE GOOD. MR. CHAIRMAN, I MAKE A MOTION THAT WE APPROVE.
ITEM NUMBER NINE ON THE AGENDA.
ZA 24-0054, SUBJECT TO OUR STAFF REPORT DATED AUGUST 30TH, 2024.
MOTION. DO WE HAVE A SECOND? SECOND. ALL RIGHT, LET'S VOTE, PLEASE.
AND AGAIN, IF YOU MAKE THE AGENDA, THE NEXT CITY COUNCIL MEETING, SEPTEMBER 17TH.
[7. Consider: ZA24-0042, Zoning Change and Development Plan for Carillon Pare Plaza District, on property described as Tracts 3A4, 3A4A, 3A5, 3A, 3A3, 3A1B, and a portion of Tracts 1E, 1D, and 3A1, Larkin H. Chivers Survey, Abstract No. 300, and generally located at the northeast corner of E. S.H. 114 and N. White Chapel Blvd., west of Rivera Dr., and approximately 600 ft. south of E. Kirkwood Blvd., City of Southlake, Tarrant County, Texas. Current Zoning: "ECZ" Employment Center Zoning District. Requested Zoning: "ECZ" Employment Center Zoning District. SPIN Neighborhood #3. PUBLIC HEARING]
COMMISSION. THIS IS A REQUEST TO AMEND THE ZONING FOR THE CARILLON PARK PORTION OF CARILLON.THIS IS AN OVERALL AREA OF THE CARILLON PARK DEVELOPMENT.
LAND USE DESIGNATION ON THIS IS MIXED USE.
[00:25:02]
ADOPTED UNDER THE CURRENT ZONING IS EMPLOYMENT CENTER.AND PROPOSED DEVELOPMENT PLAN WITH THE APPROXIMATE TOTAL SQUARE FOOTAGE IS.
THE ORIGINAL PLAN IS PROPOSED FOR APPROXIMATELY 653,000FT² OF MIXED RETAIL, OFFICE, HOTEL AND SIMILAR USES, INCLUDING 50 RESIDENTIAL LOTS, AND THE PROPOSED AMENDMENT IS APPROXIMATELY 720,000FT² OF VARIOUS MIX OF NONRESIDENTIAL USES, INCLUDING THE LOFT COMPONENT.
THIS IS A ITEMIZED LIST OF PROPOSED CHANGES BEING REQUESTED.
THE FIRST OF WHICH IS TO CHANGE THIS OUTDOOR BELL TOWER PLAZA AREA FROM A PUBLIC PARK AREA TO A PRIVATE OPEN SPACE AREA.
THE SECOND OF WHICH WOULD BE TO ALLOW FOR DEVELOPMENT OF THE PAD SITE, ORIGINALLY IDENTIFIED FOR PUBLIC LIBRARY AND PERFORMING ARTS TO ALLOW IT FOR RETAIL, RESTAURANT, OFFICE AND PRIVATE CLUB DEVELOPMENT.
SHOULD THE LIBRARY PERFORMING ARTS NOT BE CONSTRUCTED IN THAT LOCATION, AND THEN ALSO TO DEVELOP THE WHAT WAS ORIGINALLY PLANNED AS A TWO BUILDING UNIT ON THE WEST SIDE OF THE PROPERTY, ADJACENT TO WHITECHAPEL, INTO A SINGLE BUILDING SITE WITH SOME UNDER-BUILDING PARKING.
THIS AREA WOULD BE IMPROVED AND DEDICATED AS PUBLIC PARK AREA, APPROXIMATELY JUST UNDER THREE ACRES. AND THEN ON CHANGE NUMBER FIVE, THIS LOOP ROAD HERE IS CURRENTLY INCLUDED AS, AS PHASE ONE INFRASTRUCTURE THAT IS REQUIRED TO BE COMPLETED AND IS PLANNED TO BE PLATTED AND DEDICATED AS A PUBLIC ROAD.
THIS IS A REQUEST TO CHANGE THAT TO A PRIVATE ACCESS DRIVE.
CHANGE NUMBER SIX WOULD BE ADDITION OF A DRIVEWAY ON THE SOUTHEAST CORNER OF THE PROPERTY ACCESSING THE 114 FRONTAGE ROAD, SUBJECT TO TXDOT PERMIT APPROVAL.
AS YOU MAY KNOW, TXDOT IS UNDERWAY WITH A REVERSAL PROJECT, AND THAT WOULD OPEN THIS AREA UP FOR ADDITIONAL ACCESSIBILITY INTO THE PROPERTY.
THE OTHER IS TO CHANGE THE MINIMUM FLOOR AREA REGULATIONS FOR THE 50 RESIDENTIAL LOTS.
AND THIS NORTHERN BUILDING CURRENTLY, IT'S SET AT 2300 SQUARE FOOT MINIMUM.
AND THEY'RE REQUESTING THAT THAT BE A 2300 SQUARE FOOT AVERAGE WITH A MINIMUM OF 2000FT².
THIS IS JUST A PROPOSED LAND USE MIX FROM THEIR ZONING BOOKLET.
AND THE PARK OPEN SPACE PLAN WITH IMAGES. JUST IF YOU DON'T MIND. NO.
NO COMMENTS HELP FROM THE GALLERY.
OKAY. THE ONLY SPEAKING THAT HAPPENS AT THE MEETING IS RIGHT AT THE PODIUM.
OKAY. TO DATE, WE'VE RECEIVED ONE LETTER IN SUPPORT OF THE ITEM.
THEY WERE FROM OUTSIDE THE NOTIFICATION AREA, WHICH YOU'VE BEEN PROVIDED THIS THIS EVENING.
AND WITH THAT, I'M HAPPY TO ANSWER ANY QUESTIONS.
THE APPLICANT HAS THEIR PRESENTATION AS WELL, WHICH THEY CAN GET IN FURTHER DETAIL WITH YOU.
DENNIS. I GUESS A COUPLE OF QUESTIONS REAL QUICK.
[00:30:02]
THE WHITE'S CHAPEL IMPROVEMENTS.AND MAYBE I DON'T KNOW IF THERE'S ANYTHING YOU CAN COMMENT ON WITH THAT.
I MEAN, I KNOW TIMING IS ALWAYS FLUID WITH CONSTRUCTION.
IT IS INCLUDED IN THE STAFF REPORT.
THE APPLICANTS NOT SPECIFICALLY REQUESTING TO CHANGE THOSE OTHER THAN THE PARK DEDICATION PRIMARILY, BUT THE TIMING, THE TIMING ISSUES THAT WERE PUT IN PLACE WITH THE ORIGINAL ZONING WAS THAT THE BEFORE ANY RELEASE OF THE 79 RESIDENTIAL LOTS, THEY HAD TO COMPLETE WHAT WAS IDENTIFIED IN PHASE ONE, WHICH WAS THE STREETS AND INFRASTRUCTURE FOR THE RESIDENTIAL AS WELL AS A PORTION OF THE COMMERCIAL. AND THEN A STIPULATION WAS PUT IN PLACE FOR ANY CERTIFICATE OF OCCUPANCY BEING ISSUED FOR ANY OF THE NONRESIDENTIAL COMPONENTS WOULD NOT BE RELEASED UNTIL COMPLETION OF THE PARK IMPROVEMENTS AND COMPLETION OF WHITECHAPEL. THAT'S IT.
THERE'S FURTHER DETAIL IDENTIFIED IN THE MOTION ITSELF THAT HELPS HIGH LEVEL.
AND THEN YOU MENTIONED THE RAMP REVERSAL PROJECT.
WAS THERE ANY TIMING ON THAT? DO YOU KNOW OF ROUGHLY.
I MEAN, IT'S A PROBABLY A FEW YEARS OUT.
YES. OKAY. OTHER QUESTIONS FOR STAFF.
APPRECIATE IT. THANK YOU DENNIS.
YOU KNOW, IN OTHER WAYS AS WELL, BESIDES THE SCREEN.
AND THESE MEETINGS ARE ALSO HELD ONLINE SO YOU CAN WATCH THE FOOTAGE.
SO THERE'S LOTS OF WAYS TO TO GET THE INFORMATION JUST AS AN FYI.
YES. OKAY. THANK YOU. THANK YOU.
I GUESS WE'LL CALL THE APPLICANT UP THIS EVENING.
AND AGAIN, I GUESS I'D SAY THE SAME THING AT THE BEGINNING.
AND NOW IS I MEAN, THIS OBVIOUSLY, THIS APPLICATION HAS A LOT OF MOVING PIECES, AND, YOU KNOW, A LOT OF IT'S KIND OF DONE AND GONE BEYOND THE PURVIEW OF THIS GROUP.
BECAUSE THAT'S WHAT WE'LL BE EITHER RECOMMENDING OR NOT.
SO I KNOW THERE'S LOTS OF PROBABLY LOTS OF TOPICS ON THIS, BUT AS FAR AS WHAT THIS GROUP WILL BE FOCUSED ON TONIGHT, IT'LL BE THESE SEVEN ITEMS. SO I'D SAY THE SAME THING TO YOU.
WHAT'S NOT NECESSARILY KIND OF REPRESENT THE ENTIRE THING.
LET'S JUST FOCUS ON THE ITEMS THAT YOU'RE ASKING FOR MODIFICATIONS ON.
DOES THAT SOUND GOOD? ABSOLUTELY.
MY NAME AND ADDRESS FOR THE RECORD.
YEAH. JOHN TERRELL, 1710 HUNTER'S CREEK HERE IN SOUTHLAKE.
THIS IS A LOOK AT THE PROPOSED CONCEPT PLAN.
THESE ARE SOME OF THE RENDERINGS THAT THE BUILDERS ARE GOING TO TAKE AND START CONSTRUCTION.
THE PHASE ONE, AS DENNIS MENTIONED, IS WHAT'S SHOWN IN PURPLE.
ALL THOSE STREETS, THE MASQUERADING IN BOTH THE COMMERCIAL AND ON THE RESIDENTIAL SIDE.
SO WE'RE VERY EXCITED ABOUT THE COMPLETION OF PHASE ONE AND SEEING ALL THE WORK THAT'S OUT THERE.
THIS IS LOOKING KIND OF IN A SOUTHEASTERLY DIRECTION FROM THE CORNER OF KIRKWOOD AND WHITE'S CHAPEL.
SO, YOU CAN SEE THE CONSTRUCTION OF WHAT'S TAKEN PLACE ON WHITE'S CHAPEL, AS WELL AS ALL THE INTERIOR ROADS AND UTILITIES AND MASS GRADING, LOOKING IN A SOUTHWEST DIRECTION AT THE SITE.
THIS IS A GOOD SHOT RIGHT THERE AT THE HARD CORNER OF 114 AND WHITE'S CHAPEL AT THE NORTH EAST CORNER, SHOWING ADDITIONALLY THE PHASE ONE COMMERCIAL IMPROVEMENTS OF THE ROAD THAT WAS PUT IN PLACE AT THE ENTRANCE OVER ON WHITE'S CHAPEL AND THE ENTRANCE EXIT ON THE 114 CORRIDOR.
[00:35:05]
WE DID HAVE TO PUT IN A TEMPORARY DETENTION POND.AND AS WE KIND OF TALK ABOUT LATER, ONE OF THE ISSUES IS ABOUT DETENTION.
AND WE HAVE THE ABILITY, WE BELIEVE TO GET THE DETENTION ACROSS WHAT WAS ALWAYS PROJECTED AND IDENTIFIED TO GET THE STORMWATER FROM THE 42 ACRE SITE ACROSS TO THE PONDS THAT WERE BUILT AS A RETENTION, REGIONAL RETENTION, DETENTION ACROSS THIS TEN ACRE SITE. AND WE'RE WORKING WITH THAT LANDOWNER NOW, WE BELIEVE WILL BE SUCCESSFUL GOING THERE.
THIS IS ANOTHER JUST SHOT OF THE ENTIRE PROJECT YOU CAN SEE WITH THE TREES ARE LOCATED.
AND THAT WAS 16 OF THE 42 ACRES.
I'M NOT GOING TO RUN THROUGH THE SAME LIST THAT DENNIS JUST DID.
I'M JUST GOING TO JUMP INTO EACH ONE.
YOU CAN SEE THE APPROVED CONCEPT PLAN ON THE LEFT.
AND WHAT WE'RE REQUESTING OVER ON THE RIGHT FOR THE CONCEPT PLAN.
LOOKS LIKE A LITTLE FOOTBALL SHAPE.
PLUS THE AREA ON THE EAST SIDE.
SO YOU'D HAVE ABOUT 2.9 ACRES AT ACTUAL PUBLIC PARK DEDICATION.
AND THEN BECAUSE OF SOME OF THE ISSUES REGARDING MAINTENANCE AND MANAGEMENT OF THE AREA AROUND THE FOUNTAIN. WE'RE ASKING TO CHANGE IT, LEAVING IT EXACTLY THE SAME IN TERMS OF THE LOOK, THE FEEL, THE OPERATIONS AS WOULD HAVE BEEN AS A PUBLIC PARK. BUT BECAUSE WE DON'T WANT TO ENTER INTO SOME KIND OF MANAGEMENT AGREEMENT WITH THE CITY ON THE OPERATIONAL HOURS OF WHO'S GOING TO MANAGE THE OPERATIONS OF THE FOUNTAIN, WHEN IT'S GOING TO PLAY LIKE BELLAGIO DOES AT CERTAIN, YOU KNOW, HALF HOUR INCREMENTS AND WHO'S GOING TO COME OUT.
IT'S STILL GIVING THE PUBLIC THE EXACT SAME THING WE'VE TALKED ABOUT ALL ALONG, JUST AS COMPARISON, THAT PUBLIC PORTION OR MOVING TO OPEN SPACE IS ABOUT 3.9 ACRES. FOR A COMPARISON, RUSTIN PARK IS ROUGHLY 2.8 ACRES, WHICH IS ALL THE FRONT PARK AREA IN FRONT ALL THE WAY UP TO 1709 IN FRONT OF TOWN HALL. SO YOU CAN SEE IT'S A GOOD SIZE AREA.
THEN THE AREA THAT'S IN BLUE OR OUTLINED IN BLUE, THE PUBLIC BUILDING OR PARK OR OPEN SPACE.
WE KNOW THE CITY HASN'T MADE A FINAL DECISION ABOUT WHAT'S GOING TO HAPPEN WITH THE LIBRARY.
THAT'S STILL BEING CONTEMPLATED.
IF THE CITY WE WOULD LIKE TO LEAVE THIS KIND OF OPEN, THAT IF THE CITY DECIDED THAT IT WOULD LIKE TO DO THE LIBRARY THERE, THAT WE'VE GOT SOME TIME FRAME THAT ALLOWS THAT TO STILL BE USED AS A LIBRARY.
WE ARE NOW LOOKING AT PUTTING IN THE ROAD ON THE EAST SIDE OF THAT FACILITY ANYWAY, SO THAT COST COMES OFF OF THE CITY THAT WAS ORIGINALLY MAYBE A YEAR, YEAR AND A HALF AGO CONTEMPLATED.
SO THE COSTS OF I THINK WOULD BE INCREDIBLY COMPETITIVE WITH ANY OTHER LOCATION AND CERTAINLY PRODUCE MUCH MORE ECONOMIC IMPACT FOR THE CITY BEING BUILT IN CAROLINE PARK, AND I JUST CAN'T REITERATE ENOUGH THAT CHANGING THIS TO OPEN SPACE DOES NOT CHANGE THE USE, THE PURPOSE, THE DESIGN, ALL THE FEATURES INSIDE THAT AREA THAT WAS PARK, AND WE WILL STILL MAINTAIN THAT AND BUILD THAT WATER FEATURE.
SOME OF WHAT THAT DOES IS IT REMOVES THE CITY'S OBLIGATION TO REIMBURSE FOR 50% OF A $4.5 MILLION WATER FOUNTAIN. WE'RE GOING TO TAKE ON THAT WHOLE THING.
BUT THAT'S A SEPARATE INCENTIVE DISCUSSION THAT WE WON'T GET INTO HERE.
IT DOES REDUCE THE CITY'S REIMBURSEMENTS, THE COST TO MAINTAIN AND STAFF HOURS TO MANAGE A PARK.
IT DOES CREATE ADDITIONAL SALES TAXES BECAUSE MOVING FROM THE PARK, WHICH WOULD BE TAX EXEMPT.
MOVING IT TO OPEN SPACE DOES BECOME TAXABLE PROPERTY AS WELL AS A REDUCTION IN CITY COSTS.
THE DEVELOPER WILL STILL BUILD THE ROAD AND UTILITIES AND ACCESS TO THE NEW FACILITY, REGARDLESS OF WHETHER IT BECOMES A LIBRARY OR A COMMERCIAL BUILDING IN THAT BLUE AREA. NO REQUIREMENT FOR A SEPARATE PARK MANAGEMENT AGREEMENT ALLOWS US TO BETTER PROGRAM ALL THE ACTIVITIES THROUGHOUT THAT ENTIRE OPEN SPACE AREA, AS WELL
[00:40:09]
AS MANAGE THOSE 12 KIOSKS AS WAS ALWAYS CONTEMPLATED.AND IT DOES ALLOW FLEXIBILITY OF FUTURE MODIFICATIONS, WHICH WAS ANOTHER SIGNIFICANT CONCERN FOR US, AS THE DEVELOPMENT TEAM IS THAT ONCE DEDICATED AS A PUBLIC PARK, IF YOU NEED TO TWEAK A BUILDING AND MOVE IT IN AND REARRANGE, THERE'S MAJOR HOOPS TO JUMP AND HURDLES TO JUMP OVER TO MODIFY A ALREADY DEDICATED PUBLIC PARK.
SO THAT THAT CREATES US OR ALLOWS US THE ABILITY THAT IF THE BUILDING SLIGHTLY CHANGES, WE'VE STILL GOT THE SAME ACREAGE, BUT IT'S NOT CONFIGURED THE SAME. WE DON'T HAVE TO DO SOME KIND OF PUBLIC REFERENDUM TO CHANGE THE PARK.
AND JUST BECAUSE BIG PICTURE YOU KNOW, I MEAN, YOU KNOW, THE HISTORY OF THIS, I GUESS.
SURE. YOU KNOW, WE HEARD THIS, I GUESS, YOU KNOW, PLUS OR MINUS A YEAR AGO, AND WE MADE A RECOMMENDATION TO COUNCIL AND COUNCIL DENIED IT SEVEN ZERO.
I GUESS WHAT HAS CHANGED HERE, EITHER IN THE REQUEST AND OR CONVERSATIONS WITH COUNCIL.
SO THERE HAVE BEEN MANY ADDITIONAL CONVERSATIONS WITH COUNCIL.
YOU KNOW, NOT NOT TO GO INTO A WHOLE LOT OF ISSUES, BUT IN THE LAST MEETING THAT LAST OCTOBER THE SIGNIFICANT REASON THAT THERE WERE ISSUES WAS A PERCEIVED AGREEMENT THAT THE DEVELOPER HAD WITH THE HOSPITAL SAINT JUDE HOSPITAL AND MADE AN ANNOUNCEMENT.
IT WAS THOUGHT THAT WE MADE AN ANNOUNCEMENT FOR A GROUNDBREAKING PRIOR TO ANY KIND OF APPROVALS.
YES. AND SO WE'RE BASICALLY BRINGING BACK VERY SIMILAR.
WE DIDN'T HAVE WE DIDN'T AT THAT TIME TALK ABOUT THE OPEN SPACE OR THE PARK CHANGE TO OPEN SPACE.
THAT WAS NOT IN LAST YEAR'S APPROVAL REQUEST.
IS THAT RIGHT? THE ONLY THING THAT DID COME IN WAS THIS THE BUILDING ABOUT THE LIBRARY.
I MEAN, ON THE LAST TWO SLIDES THAT WE'RE TALKING ABOUT RIGHT NOW, WE DID TALK ABOUT THE LIBRARY.
AND IF THE LIBRARY DIDN'T OCCUR TO ALLOW US TO DO ABOUT A 25,000 SQUARE FOOT BUILDING.
AND THAT'S STILL SOMETHING THAT I THINK THE COUNCIL IS WILLING TO LISTEN TO.
AND WE'VE GOT SOME NUMBERS THAT SHOW WHAT KIND OF TAX GENERATION CAN OCCUR.
AND I DON'T THINK THE CITY HAS MADE A DECISION ABOUT THE LIBRARY.
SO, WE WANT TO LEAVE THAT OPEN.
OKAY. I DON'T THE OPEN SPACE VERSUS PARK SPACE IS A BRAND NEW THING.
THIS ITEM DID COME UP AT THE CORRIDOR MEETING THOUGH.
ITEM NUMBER ONE, THE PROPOSED REVISION.
YEAH, YEAH. OKAY. THAT WAS PART OF THE CORRIDOR MEETING DISCUSSION.
YEAH. OKAY. THAT'S WHERE I REMEMBER IT FROM.
SO AND I THINK THERE'S STILL SOME WILLINGNESS AND, AND, AND IT'S AN IMPORTANT ISSUE BECAUSE I DON'T THINK IT WAS EVER CONTEMPLATED THROUGH THE PAST SEVEN YEARS OF PRESENTATIONS THAT EVEN IF IT WAS A PARK THAT THE CITY, IT WAS NEVER CONTEMPLATED THAT THE CITY WAS GOING TO MANAGE THE OPERATIONS OF THE FOUNTAIN AND THE ACTIVITIES IN THE PARK THAT THAT WAS GOING TO BE DEVELOPER DRIVEN TO CORRESPOND WITH ALL OF THE TENANTS ACTIVITIES, ETC..
OKAY. ANY OTHER? WELL, MAYBE WE'LL JUST GO ITEM BY ITEM.
ANY OTHER QUESTIONS ON THIS ITEM BEFORE WE GO TO ITEM NUMBER TWO.
OKAY. WE CAN ALWAYS COME BACK.
OKAY. WHY DON'T YOU GO AHEAD IN THE INTEREST OF TIME.
BUT IF THEY CHOOSE NOT TO DO THE LIBRARY WITHIN SOME CERTAIN AGREED TO TIME THAT WE WOULD BE GIVEN THE OPPORTUNITY TO BUILD A 25,000 SQUARE FOOT COMMERCIAL TYPE BUILDING WOULD STILL BE ARCHITECTURALLY SIGNIFICANT.
AS A MATTER OF FACT, IT'S SHOWN IN OUR RENDERINGS BECAUSE THAT WAS THE PLAN EARLIER ON.
[00:45:04]
IT WOULD BECOME TAX GENERATING FOR RETAIL, RESTAURANT, OFFICE AND PRIVATE CLUB.AND IT WAS, YOU KNOW, ORIGINALLY IN THE PROPOSED PARK WHEN WE LAST MADE THIS PRESENTATION, THE THERE WAS SOME DISCUSSION BETWEEN VARIOUS COUNCIL MEMBERS, AND THERE'S KIND OF DIFFERING OPINIONS AS TO WHETHER OR NOT THIS WILL BE A LIBRARY, WHETHER IT COULD BE A PERFORMING ARTS, WHETHER IT WOULD BE A TAX GENERATING COMMERCIAL, AND WHETHER IT MIGHT INCLUDE SOME KIND OF MILITARY MONUMENT OR STRUCTURE OUT THERE.
MEMORIAL AND TRIBUTE TO THE MILITARY.
WE WANT TO, YOU KNOW, CERTAINLY INCLUDE THE LIBRARY PERFORMING ARTS AS A PERMITTED USE FOR SURE.
PRESERVE OPTIONS FOR THE USE TO BE LOCATED IN CARILLON PARK SHOULD THE FINANCIAL CONDITIONS CHANGE FOR THE CITY, WHICH THAT WAS THE MAIN PURPOSE, OR THE REASON FOR THE DISCUSSION THAT THE CITY GAVE WHEN THEY KIND OF PULLED BACK ON THE LIBRARY AND DEVELOPER BELIEVES THAT CAN BUILD LESS EXPENSIVELY AND PROVIDE MORE ECONOMIC IMPACT FOR CARILLON PARK. IF IT DOES.
DO EITHER OF THE LIBRARY OR A PRIVATE COMMERCIAL BUILDING? AND SHOULD THE CITY AND DEVELOPER AGREE TO THE TERMS TO CONSTRUCT A LIBRARY, THEN THAT AREA IN BLUE WOULD BE DEDICATED BACK AS PUBLIC PARK BECAUSE IT WOULD BE PART OF THE PUBLIC FACILITY.
AND THEN THAT WOULD BE DEDICATED AS PUBLIC PARK.
IF NOT, IT WOULD JUST REMAIN PRIVATE SECTOR AND THEN TAXABLE VALUE ON THAT LAND.
WE'RE READY TO MOVE INTO THE COMMERCIAL SIDE OF PHASE TWO, WHICH IS GOING TO REQUIRE A SIGNIFICANTLY MORE ENGINEERING AND ARCHITECTURAL DRAWINGS THAT ARE PROBABLY GOING TO COST A MILLION AND A HALF TO $2 MILLION TO DO PHASE ONE ON THE COMMERCIAL.
AND THEN THAT WILL THEN ALLOW US TO GIVE DIRECTION IMMEDIATELY UPON, IF WE DO GET APPROVAL TO THE ENGINEERS TO GET GOING ON THIS, SO THAT WE COULD POTENTIALLY START GOING VERTICAL.
THIS ONE WE REALLY DON'T EVEN HAVE TO BRING FOR APPROVAL.
JUST TO LET YOU KNOW THAT WE'RE GOING TO BE TRYING TO COMBINE THOSE TWO BUILDINGS INTO ONE.
THAT WILL COME BACK WITH A SITE PLAN REVIEW AT SOME POINT IN THE FUTURE.
THERE WAS AN INDICATION AT THE CORRIDOR COMMITTEE AND SOME OF OUR PRIOR MEETINGS THAT IF WE WEREN'T ABLE TO GET THE EASEMENT ACROSS THE TEN ACRE TRACT TO DRAIN THE STORMWATER IN THAT DIRECTION, THAT WE WOULD BUILD A LARGE POND IN THE MIDDLE OF THAT EASTERN PARK.
SO WE'VE MADE A DETERMINATION.
THOSE ARE TOO VALUABLE TO THE OVERALL PROJECT AND THAT IF WE CANNOT FOR SOME REASON, GET THE DRAINAGE RIGHTS ACROSS THE TEN ACRES, THAT WE WILL DO UNDERGROUND DETENTION UNDER THE BUILDINGS, THE OFFICE BUILDINGS WHERE THE NUMBER FOUR IS LOCATED, SO WE WILL STILL TAKE CARE OF THE REQUIRED DETENTION.
IT JUST WOULDN'T. WE DON'T WANT TO BUILD A GIANT POND AND WIPE OUT ALL THE TREES THERE.
AFTER A LOT OF DISCUSSIONS WITH THE DIFFERENT RESTAURANTS LIKE KIRBY'S, NOT KIRBY'S ALBANESE AND OTHERS, THEY NEED A LOT OF DEDICATED VALET PARKING AND A VALET SERVICE AREA THAT IS NOT CONDUCIVE TO PUBLIC ROADWAY.
AND SO OUR REQUEST IS TO TAKE THAT.
THERE'S NO MAINTENANCE ON THE CITY.
AND THEN IF YOU LOOK AT THIS RIGHT HERE, THIS IS A VALET SPEED RAMP THAT ALLOWS PEOPLE TO DROP OFF RIGHT HERE AND VERY QUICKLY GET YOUR CARS INTO THE FIRST LEVEL, PARKING INTO THIS GARAGE THAT WILL BE DEDICATED FOR VALET TO HELP SERVE ALL THESE, THESE FOUR RESTAURANTS AT THIS LOCATION AND ANYTHING ELSE THAT'S OUT HERE FROM PUBLIC.
IT JUST HAS IT IMPROVES ALL THE OPERATIONS FROM THE RESTAURANTS AND THE RETAIL USES, AND IT ALLOWS US TO ALSO SEGREGATE SOME OF THE PARKING, YOU KNOW, JUST LIKE ANY OF THE HIGHER END RESTAURANTS AND LOCATIONS IN DALLAS OR FORT WORTH, WHERE THEY'RE OUT PARKING THEIR MASERATIS OR WHATEVER OUT FRONT TO SHOW THAT
[00:50:05]
THIS IS THE HIGHEST END DINING.BUT THEN ON A MOBILITY SIDE, IT REALLY DOES MAKE THINGS BETTER.
IF FOLKS AREN'T JAMMED UP IN HERE COMPETING WITH VALET PARKING, AND THAT WOULD BE BUILT AS PART OF THE PHASE ONE A, WHICH IS ALL THE NEXT MULTIPLE BUILDINGS, THE PARK AND THAT ROADWAY.
I THINK WE'VE PRESENTED NUMEROUS TIMES ON WHAT'S HAPPENING.
ARE WE ASKING QUESTIONS? SURE.
OH, YEAH. SO JUST ON BACK ON NUMBER FIVE.
IT'S A CONCERN, MAYBE A SUGGESTION, BUT MY CONCERN IS THE DRIVER THAT DOESN'T COME HERE VERY OFTEN, AND THEY'RE TRYING TO FIGURE OUT HOW TO GET AROUND, AND THEN THEY TURN AND THEY'RE LIKE, OH, WAIT, I'M IN A PRIVATE DRIVE.
THAT WOULD BE SIGNED VERY WELL.
IT WOULD LOOK MORE LIKE A PRIVATE DRIVE THAN A ROADWAY.
SO WHEN YOU'RE ENTERING THERE, IT'S ALMOST LIKE YOU'RE PART OF THOSE RESTAURANTS AND FEEL LIKE YOU'RE NOW ON A NEW PAVEMENT AREA THAT IS THE PRIVATE VALET AREA. YOU'RE GOING TO SEE ALL THE VALET SERVICES THERE.
SO WE'LL PAY A LOT OF ATTENTION, BECAUSE THE LAST THING WE WOULD WANT TO DO, AS BOTH THE DEVELOPER AND THE RESTAURANT TOURS, IS YOU DON'T WANT TO CREATE AN ISSUE WITH EVERYBODY GETTING CONFUSED ABOUT HOW THEY'RE SUPPOSED TO BE PARKING, BUT GOOD POINT.
JOHN, I HAD A QUESTION THAT'S KIND OF COMBINED BETWEEN 5 AND 1, AND IT'S RELATED TO THE SITE PLAN.
IT'S BASICALLY GOING STRAIGHT WHEN YOU'RE COMING OFF OF WHITES CHAPEL.
BUT BECAUSE YOU'RE TRYING TO TAKE THE OPEN OR THE OR THE PARK PRIVATE TO ALLOW FOR THIS RAMP, IT ALSO KIND OF TURNS THAT INTO A RECTANGLE.
I'M WORRIED ABOUT SORT OF THE ARTICULATION OF THE BUILDING AND NOT HAVING THAT KIND OF CLOSED IN EUROPEAN FEEL THAT THIS WAS LOOKING LIKE IT WON'T CHANGE ANY OF THE ARTICULATION OF THE BUILDING. I MEAN THIS BECAUSE IT'S RIGHT.
IT'S KIND OF A LIKE THE PREVIOUS SITE PLAN IS KIND OF CONCAVED AROUND.
OH, YOU MEAN THE PRIOR PLAN HERE WITH THAT? WELL, THERE WASN'T WITH THAT CONCAVE.
ONE OF THE MAIN REASONS IS WITH THAT YOU DID NOT HAVE ENOUGH PARKING TO PARK THE WHOLE PROJECT, BECAUSE THAT TOOK AWAY FROM THIS PART OF THE PARKING GARAGE, BECAUSE THAT'S FIVE LETTERS. AND SO YOU WERE GETTING A CONCAVE DEAL THAT CUT INTO THE PARKING GARAGE.
THERE WAS NO WAY TO MAKE THAT HAPPEN.
THAT'S GOING TO BE THE LEVEL THAT'S AT GRADE WITH THIS PARK.
BUT YOU'RE NOT YOU'RE NOT ENTERING RIGHT THERE, ARE YOU? YOU'RE TURNING THERE'S STILL AN ENTRANCE HERE.
SO THIS THIS ENTRANCE DIDN'T CHANGE.
THAT'S THE PUBLIC ENTRANCE INTO HERE.
AND THEN THIS IS VALET ONLY, RIGHT.
SO I'LL FOLLOW YOU THERE. THIS WILL STILL BE THE MAIN ENTRANCE INTO THE GARAGE.
THEY'LL COME IN. THEY CAN PARK ANYWHERE IN HERE.
AND WE WILL HAVE MULTIPLE ENTRANCES FROM THIS THAT LOOK AND FEEL NOT LIKE YOU'RE IN THE GARAGE, BUT YOU'RE ACTUALLY IN A RETAIL AREA THAT GOES ALL THE WAY INTO YOUR PARKING SPACES THROUGH ABOUT THREE DIFFERENT CORRIDORS RIGHT HERE.
GOT IT. AND THEN THAT WILL ALLOW YOU TO THE MULTIPLE ELEVATORS AND THE ELEVATORS WILL BE SEPARATED BETWEEN THE GENERAL PUBLIC AND THE LOFT OWNERS.
SO THERE'S PRIVATE ELEVATORS FOR THOSE WHO ARE IN THE OWNERS OF THE LOFTS.
GOT IT. OKAY. THANKS FOR WALKING ME THROUGH THAT.
YEAH, I THINK I DON'T KNOW THAT I NEED TO REALLY GO OVER THIS ONE.
THIS ONE'S A PRETTY EASY NO BRAINER IN TERMS OF TRYING TO GET US ANOTHER ACCESS POINT THAT WAS PREVIOUSLY PROHIBITED BECAUSE OF THE WEAVING ISSUES WITH THE WITH THE RAMP, BUT WITH THE RAMP REVERSAL WOULD ALLOW US TO DO THAT.
AND THAT'S JUST SOMETHING THAT WE ALSO KNOW THAT REQUIRES TXDOT APPROVAL.
WE JUST WANT TO KNOW THAT THE CITY IS GOOD WITH IT AS WELL.
THEN HERE, WHAT DENNIS DID WAS EXACTLY WHAT I HAD PROVIDED TO HIM.
[00:55:02]
WE HAVE MADE A MODIFICATION.SO IN THIS, WE'RE ASKING YOU HAVE THE ABILITY TO DO WHATEVER ON THIS, BUT WE'RE ASKING FOR 1600 SQUARE FEET, BECAUSE ONE OF THE THINGS THAT IT DOESN'T DO FROM AN OUTSIDE VIEW, THIS DOES NOT CHANGE THE LOOK, THE OPERATIONS, BECAUSE IT'S NOT GOING TO BE MORE THAN 115,000FT².
SO WE ARE LIMITED TO THE TOTAL SQUARE FOOTAGE AND WE'RE ALSO LIMITED TO 50 UNITS.
SO INSIDE, IF WE HAVE THE FLEXIBILITY TO GET SOMEBODY WHO NEEDS A LITTLE SMALLER SPACE, REMEMBER THAT IF WE'RE STILL GOING TO AVERAGE 2300, THAT MEANS THAT WE'VE GOT TO HAVE SOMETHING THAT OFFSETS 600FT THE OTHER WAY.
SO WE HAVE TO HAVE A 2900 SQUARE FOOTER TO OFFSET THE 1600.
THERE ARE A NUMBER OF FOLKS WHO ARE LOOKING FOR A SMALLER UNIT.
REMEMBER, THESE UNITS ARE GOING TO BE 700, 900, $1,000 A FOOT.
SO THIS IS NOT SOME KIND OF, YOU KNOW, SMALL APARTMENT TYPE COMPLEX.
THIS IS A VERY, VERY HIGH END CONDOMINIUMS. AND THEN THIS WHAT I'M ASKING RIGHT NOW FOLLOWS THE PARK VIEW, WHICH IS, YOU KNOW, RIGHT NEXT TO HERE IN TOWN SQUARE.
AND IF YOU LOOK AT THAT, THEY DID 36 LOFTS, FIVE STORIES.
THEIR SQUARE FOOTAGE RANGE IS FROM 1557 TO 37, 37, AND THEY RANGE FROM 1.1 TO 2.9 MILLION.
THEY'VE GOT ALL THE HIGH END CUSTOM FEATURES.
ROOFTOP TERRACE. WE'RE LOOKING AT THE ROOFTOP CLUB, SOMETHING LIKE PARK HOUSE, WHICH WE TALKED ABOUT PREVIOUSLY, AND IN HIGHLAND PARK VILLAGE, THEY HAVE VERY HIGH MONTHLY HOA FEES TO HELP PAY FOR THE UPKEEP.
AND THEN CURRENTLY RIGHT NOW, YOU'VE GOT A 1700 SQUARE FOOT UNIT FOR SALE AT $758 A SQUARE FOOT FOR $1.3 MILLION. SO THIS IS NOT GOING TO DECREASE VALUE.
PREVIOUSLY WE BROUGHT 1600 LAST YEAR.
AND BUT WE DIDN'T SETTLE ON ANYTHING AND WE'RE JUST BRINGING IT BACK.
YES, BECAUSE WE ASKED FOR 1600.
WE'D LIKE TO AT LEAST BE ABLE TO GO BACK AND MAKE THE CASE, KNOWING THAT IF THE CITY DECIDES TO GO TO 2000, AND IF THEY GIVE US A 2300 SQUARE FOOT AND 2000 MINIMUM, WE'RE OKAY WITH THAT.
BUT WE WOULD LIKE TO MAKE THE CASE THAT THIS WAS ACCEPTABLE, AND IT AND IT ALLOWS US A BETTER MARKETING OPPORTUNITY, ESPECIALLY WITH COMPETITION IN THIS PARTICULAR RANGE.
AND RIGHT NOW THE MINIMUM IS 2300.
OKAY. ANY QUESTIONS ON THIS ITEM OR ANY OF THE OTHER SIX ITEMS? OKAY. OKAY.
ALL RIGHT. THAT'S PRETTY MUCH IT.
THIS IS THE RENDERINGS YOU CAN SEE KIND OF OVER ON THE FAR RIGHT OF THE SCREEN.
THAT'S WHERE WE HAD PLANNED FOR THE LIBRARY BUILDING.
THIS IS THE LOOK, THE FEEL OF THE PARK THAT WON'T CHANGE IF IT'S OPEN SPACE.
ALL THE PRODUCTION AND SO FORTH WOULD BE MANAGED BY THE THE DEVELOPER AND THE HOA GOING FORWARD.
AND COMMISSIONER REYNOLDS, I THINK THIS KIND OF SHOWS, IF YOU GO BACK, THIS KIND OF SHOWS YOU A LITTLE OF THE BUILDING ARTICULATION, WHICH I THINK WAS WHAT DID YOU NEED ME TO GO BACK? IF YOU GO BACK TO ONE MORE THERE.
AND I'M SAYING THAT ARTICULATION IS FROM THE PREVIOUS SITE PLAN.
AND THAT'S IN OUR ZONING BOOKLET.
SO ALL OF THAT IS ALREADY APPROVED.
WE HAVE TO BUILD THAT. YOU CAN KEEP GOING.
OKAY. WE'RE KIND OF RUNNING. THEN THEN THE ONLY OTHER THING I JUST WANT TO SAY IS THAT, YOU KNOW, A LOT OF FOLKS ASK, WELL, WHAT KIND OF ECONOMIC IMPACT IS THIS GOING TO BRING? AND I THINK DENNIS WAS CLOSER.
THE 877 IS IF WE WERE DOING A COUPLE OTHER THINGS, IT'S REALLY CLOSER TO 720,000FT².
[01:00:03]
WE'RE DOING HALF IN PHASE ONE AND HALF IN PHASE TWO IS THE PLAN.YOU'VE GOT $142 MILLION IN VALUE, JUST IN THE 79 RESIDENTIAL HOMES THAT ARE GOING TO BE BUILT.
YOU GOT $375 MILLION IN COMMERCIAL CAPITAL INVESTMENT IN THIS.
THE CITY IS GOING TO GET ABOUT $3 MILLION IN CITY IMPACT FEES.
THEY'LL BE CLOSE TO 1400 NEW EMPLOYEES AND ABOUT 65 MILLION IN ANNUAL TAXABLE SALES.
AND THEN THE PROJECTION IS RIGHT NOW FROM SOME OF THE TRAFFIC STUDIES AND VARIOUS FOLKS, IS THAT IT WOULD BE ABOUT A 1 MILLION PEOPLE COMING TO VISIT THIS IN THE FIRST YEAR OF 100% OPEN.
SO IT'S A SIGNIFICANT DEVELOPMENT.
WE'RE EXCITED AND LOOKING FORWARD TO MOVING ON THIS COMMERCIAL SIDE.
EVERYBODY'S BEEN WAITING ON THE COMMERCIAL SIDE.
ANY OTHER QUESTIONS FOR NOW? I DID HAVE ONE. A COUPLE OF QUICK ONES HERE ON THE UNDERGROUND DETENTION YOU WERE TALKING ABOUT.
COULD THAT WATER BE USED FOR IRRIGATION PURPOSES AFTERWARDS? YOU'D MADE ANY CONSIDERATION FOR THAT? IT IS. IT IS POSSIBLE.
AND WE CAN CERTAINLY TALK TO THE ENGINEERS ABOUT IT.
YEAH. SEEMS LIKE IT'D BE A GOOD USE OF IT.
RIGHT. IF THE CITY APPROVES IT.
EITHER WAY, IF THEY SAY NO TO EITHER, THEN WE'LL HAVE TO FIGURE SOMETHING OUT.
ANY OTHER QUESTIONS? FOR NOW. WE CAN ALWAYS CALL THE APPLICANT BACK UP.
THANK YOU. SIR. I THINK ON THIS ONE MAYBE LET'S TRY TO GO AROUND THE DAIS, MAYBE AHEAD OF THE, THE PUBLIC HEARING JUST TO MAYBE THERE'S A LITTLE BIT OF AN IDEA ON KIND OF WHERE WE'RE STACKING OUT, MAYBE JUST ITEM BY ITEM.
WE CAN HEAR THE PUBLIC COMMENT SESSION AND, YOU KNOW, CHANGE OUR MINDS OR SEE IT DIFFERENTLY.
BUT JUST AT LEAST IN TERMS OF THE SEVEN THAT WE HAVE ON HERE, MAYBE JUST GOING THROUGH YOU KNOW, THE FIRST ONE AND MAYBE STAFF, DO YOU MIND GETTING, PUTTING ON THE, THE OVERHEAD KIND OF THE, THE SEVEN KIND OF BULLET POINTS I GUESS THAT SLIDE THAT PERFECT.
YEAH. THAT MAKES IT A LITTLE EASIER TO GO THROUGH IT.
PERFECT. YOU KNOW, THE FIRST ONE AGAIN, I GUESS I KIND OF HEAR WHAT THE APPLICANT IS SAYING, BUT YOU KNOW, AT THE END OF THE DAY, WE'RE APPOINTEES OF THE ELECTED CITY COUNCIL, AND WE'RE KIND OF AN EXTENSION OF THEIR ARMS HERE.
FEELS LIKE IT'S CHANGING THE DEAL.
SO I GUESS PERSONALLY I STRUGGLE WITH IT, BUT I DON'T KNOW HOW OTHER FOLKS MIGHT FEEL ON THIS ONE.
I DON'T I DON'T REALLY SEE THAT.
THEN I DON'T I DON'T REALLY SEE WHERE THAT'S A STUMBLING BLOCK.
AND SO YOU START CHANGING DIFFERENT PIECES.
AND THAT'S NOT SOMETHING WE USUALLY WEIGH IN ON.
IF YOU'RE TAKING BACK SPACE AND WHAT'S THE MOOD AT THE TIME OF THE SITUATION? WHO'S THE OWNER OF THE PROJECT AT THAT TIME? YEAH, I STRUGGLE WITH THIS ONE.
AND I STRUGGLE WITH IT ALSO BECAUSE WHEN I THINK ABOUT WHAT KILLS DOWNTOWNS OR TOWN SQUARES OR THINGS LIKE THAT IS WHEN YOU START HAVING AND I'M NOT SAYING THAT YOU'RE GOING TO DO THIS, BUT THERE ARE GOING TO BE SUBSEQUENT OWNERS, RIGHT, OF THIS PROJECT.
AND MAYBE THEY'RE NOT APPROVED FOR TOWN SQUARE, BUT THEY ARE APPROVED FOR HERE OR, YOU KNOW, DIFFERENT, DIFFERENT EVENTS THAT HAPPEN THAT I THINK THE MORE YOU PULL AWAY FROM OUR TOWN SQUARE AND YOU PULL TO OFF-SITE LOCATIONS, THAT KIND OF PENALIZES WHAT OUR WHAT OUR TOWN SQUARE IS.
[01:05:01]
MAYBE, MAYBE SAID ANOTHER WAY, IT SEEMS TO BE, OR AT LEAST IT WAS INITIALLY THE CITY'S INTENTION TO HAVE SOME INVOLVEMENT IN THAT ASPECT, MAYBE FOR THOSE REASONS. SO, ANY OTHER COMMENTS ON THIS ONE BEFORE WE GO TO THE NEXT ONES? ITEM TWO I GUESS PERSONALLY I DON'T REALLY HAVE A PROBLEM WITH THE FLEXIBILITY THERE TO THE EXTENT THAT THE CITY, I GUESS, DECIDES NOT TO MOVE FORWARD WITH SOMETHING, IT SEEMS REASONABLE TO GIVE THE APPLICANT TO GIVE SOME FLEXIBILITY TO MOVE FORWARD WITH SOMETHING ELSE.YEAH. AND I THINK HE EXPRESSED THE FACT THAT, YOU KNOW, THERE'LL BE A TERM SET.
SO IT'S NOT GOING TO BE LIKE THEY HAVE TO MAKE A DECISION TOMORROW.
I'M ASSUMING HE'S TALKING ABOUT IN THE NEXT TWO YEARS.
SO THAT'S WHAT WE'RE TRYING TO GO THROUGH AND JUST DIGEST THE APPETITE HERE.
NOT REALLY ANY ISSUES WITH THAT ONE.
UNLESS ANYONE HAS ANY THING THEY WANT TO TALK ABOUT THERE.
ITEM NUMBER FOUR SAME CONCEPT TO THE EXTENT IT'S UNDERNEATH THE BUILDING.
ANY COMMENTS ON THAT ONE? FIVE. SAME THING.
ISN'T THERE A CITY AGREEMENT WHERE IT CAN STAY PUBLIC? AND THEN THEY HAVE THE RIGHT TO, TO USE IT IN THAT FASHION AT CERTAIN HOURS OR CERTAIN THINGS.
IS THERE A ALTERNATIVE SOLUTION, RATHER THAN JUST DEDICATING IT TO PRIVATE.
THAT STILL WOULD FACILITATE THE KIND OF THE VALET TAKEOVER, SO TO SPEAK.
YEAH. I'M NOT SURE THAT I UNDERSTAND YOUR YOU KNOW, MAYBE SOME SORT OF AGREEMENT WITH THE CITY THAT IT REMAINS PUBLIC, BUT YET THERE'S.
I DON'T KNOW, SOME SORT OF AGREEMENT THAT ALLOWS THE CITY A LITTLE MORE CONTROL, JUST, YOU KNOW THE ZONING COULD PUT IN PLACE, YOU KNOW OPERATIONAL STANDARDS FOR VALET PARKING ITSELF.
TOWN SQUARE HAS A SEPARATE I BELIEVE, ORDINANCE OR RESOLUTION THAT DEALS WITH VALET PARKING WHEN THOSE BOOTHS HAVE TO BE PUT IN PLACE IN PUBLIC RIGHT OF WAY.
SO, IT WOULD EITHER NEED TO BE TIED INTO THE ZONING TO CLEARLY IDENTIFY HOW THAT WOULD OPERATE OR UNDER SOME OTHER SEPARATE. YEAH, MAYBE IT'S A PUBLIC STREET, BUT IT'S WHERE THOSE VALET KIOSKS AND, YOU KNOW, TRAFFIC IN THE PUBLIC RIGHT OF WAY.
YEAH. DURING CERTAIN HOURS OR SOMETHING LIKE THAT.
I DON'T KNOW, THAT COULD BE ONE THAT I MEAN, WE CAN COME BACK TO IT, BUT MAYBE THERE COULD BE SUPPORT FOR BUT CAVEATED WITH MAYBE EXPLORING TO SEE IF THAT'S AN ALTERNATIVE OPTION WHEN IT GETS TO THE COUNCIL LEVEL, IF THEY MAYBE FIND AN IDEA AND VIEW IT DIFFERENTLY.
WELL, I THINK THERE COULD BE, BECAUSE MY QUESTION WAS HOW DO YOU DELINEATE IT IF YOU'RE GOING TO USE IT IN A DIFFERENT WAY? AND SO ONE SUGGESTION WAS MAYBE A DIFFERENT KIND OF MATERIAL.
AND I'VE, IN MY MIND I WAS THINKING MAYBE LIKE BRICK OR SOME KIND OF PAVERS, BUT I WOULD THINK THAT THAT MAKING IT A CITY ROAD WOULD DO THAT BECAUSE THEY WOULD, IT WOULD HAVE TO BE SOME KIND OF DESIGN CRITERIA.
THAT'S UP TO A CITY ROAD THAT WOULDN'T ALLOW THAT CREATIVITY AND FLEXIBILITY TO DO THAT.
OKAY. WELL, MAYBE WE'LL COME BACK TO THAT ONE AFTER THE PUBLIC HEARING.
SAME COMMENT. I DIDN'T REALLY HAVE ANY STRUGGLES WITH THAT ONE.
AND THEN ITEM SEVEN AGAIN, I FEEL LIKE THE CONSISTENT COMMENTARY I'VE HEARD FROM COUNCIL IS THEIR PREFERENCE NOT TO REOPEN THAT ONE, BUT I DON'T KNOW IF ANYONE HAS ANY OTHER THOUGHTS.
WE'LL OPEN THE PUBLIC HEARING IN A SECOND.
THEN WE CAN ALWAYS RE DELIBERATE.
SO NOW WE'LL GO AHEAD AND OPEN THE PUBLIC HEARING.
AND AGAIN JUST A QUICK REMINDER ON HOW IT WORKS.
PLEASE COME FORWARD TO THE PODIUM.
PLEASE ADDRESS ALL YOUR COMMENTARY TO US.
PLEASE KEEP IT TO THREE MINUTES IF YOU CAN, IN CONSIDERATION OF YOUR OTHER SPEAKERS.
AND THEN YOU'LL READ, IT'LL START BLINKING.
[01:10:02]
SO, YOU KNOW, WE ASK THAT YOU PLEASE WRAP IT UP.BUT OTHER THAN THAT, I THINK THAT'S THE LOGISTICS ON IT.
OKAY. JUST STATE YOUR NAME AND ADDRESS FOR THE RECORD.
SO ACROSS THE STREET, RESIDENT OF CAROLINE.
BEEN INVOLVED IN THE CITY FOR A LONG, LONG TIME.
IT WAS HERE AT THE GRAND OPENING OF SOUTHLAKE TOWN SQUARE TO GIVE YOU PERSPECTIVE.
I WAS AT COUNCIL LAST OCTOBER.
I'VE BEEN 30 YEARS IN THE REAL ESTATE INVESTMENT BUSINESS.
JUST I'M GOING TO KEEP THIS SHORT AND SWEET.
I'VE BEEN THROUGH A LOT OF THIS.
DEVELOPING 79 RESIDENTIAL LOTS IS THE EASIEST THING YOU'LL EVER DO ON A FLAT PIECE OF LAND.
THE HARDEST THING YOU'LL EVER DO IS DEVELOPER IS DEVELOP MIXED USE.
HARDEST THING YOU CAN POSSIBLY DO? I DON'T KNOW IF ANY OF YOU HAVE BEEN TO AUSTIN, BUT LIKE DOMAIN ENDEAVOR, THE MOST EXPERIENCED DEVELOPER IN THE STATE OF TEXAS ON MIXED USE.
TOOK THEM 30 YEARS TO DEVELOP IT.
IT'S TAKEN 18 MONTHS TO GET TO WHERE WE ARE TODAY, SO I'D RATHER BET.
TESLA'S FACTORY, THE LARGEST EVER BUILT IN THE STATE OF TEXAS.
OKAY, SO LIKE THIS HAS BEEN A CHALLENGE, AND I'D RATHER BET MY MONEY ON THE CITY OF SOUTHLAKE, WHICH ALL OF OUR TAXPAYERS DO. OKAY.
OKAY. THOSE ARE THINGS THAT I REALLY FEEL STRONGLY ABOUT.
THE PUBLIC VERSUS PRIVATE SPACE ON THE PARK.
I'VE TALKED ABOUT I DON'T I DON'T THINK WE NEED A SECOND ENTRANCE.
OKAY. THERE'S NO TIME FRAME ON TXDOT THAT TAKES YEARS.
US RESIDENTS AT WHITECHAPEL, DOVE AND SOLANA HAS BEEN A NIGHTMARE.
THAT IS THE REASON THE FIRST ENTRANCE.
I AGREE THEY SHOULD ABSOLUTELY HAVE.
BUT UNTIL WE GET TO TXDOT AND THEY APPROVE WHAT THEY'RE TALKING, WHICH IS A LONG PROCESS, I DON'T THINK WE SHOULD AGREE TO A SECOND ENTRANCE BECAUSE THEN YOU'RE GOING TO HAVE THREE. YOU'RE GOING TO HAVE CONSTRUCTION OUT OF TXDOT FOR A LONG, LONG TIME, AND RESIDENTS NEED A BREAK.
I'M JUST FROM A RESIDENTIAL PERSPECTIVE.
THAT'S REALLY ALL I HAVE TO SAY.
WELL TIMED. OKAY. THANK YOU VERY MUCH.
APPRECIATE IT. TIMED IT PERFECTLY.
THE PUBLIC HEARING REMAINS OPEN TO ANYONE ELSE.
YOU'D LIKE TO COME FORWARD AND COMMENT ON THIS ITEM.
ALL RIGHT. THANK YOU. GOOD EVENING, I'M MIKE BURCH.
FORTUNATE TO BE A RESIDENT OF CARILLON SINCE 2013.
AND FRANKLY, MY PROPERTY IS PROBABLY ONE OF THE CLOSEST, ALONG WITH RON'S AND OTHERS IN HERE.
TO THE ACTUAL DEMOLITION, EXCAVATION, CONSTRUCTION, RESIDENTIAL AND COMMERCIAL PLANS.
SO GOING BACK TO 2013, NOT TO WAX NOSTALGIC.
I WOULD HAND FEED THE COWS AND THE CATTLE THERE.
LOOKING OUT MY OFFICE WINDOW AND ONE SIDE OF MY HOUSE, I COULD LOOK OUT AND SEE THE CATTLE.
THE GENTLEMAN THAT GAVE THE PRESENTATION, I'LL HAVE YOU ON MY SALES TEAM ANY TIME.
IF YOU WANT TO SELL MEDICAL DEVICES, I'LL GIVE YOU HALF THE NATION.
YOU'RE GOOD AND BUT PLEASE ADDRESS IT TO US.
THE SENTIMENTS OF THE RESIDENTS IS OVER AND BEYOND THE FANCINESS OF BUILDINGS AND SO FORTH.
WE WANT TO JUST REVERT BACK AND LOOK AT BASICALLY WHAT GOT US HERE.
AND THAT'S THE BEAUTY, THE SECURITY AND THE SAFETY.
[01:15:02]
AND AS RON SAID, VERY WELL, TOO MUCH TRAFFIC, TOO MUCH GOING ON, TOO MUCH PROGRESS AT ONE TIME CAN BE DANGEROUS.BUT I THANK YOU AND I APPRECIATE IT.
ALL RIGHT. NAME AND ADDRESS, PLEASE.
MARY ALFORD, 1812 SAINT PHILIP AVENUE, SOUTHLAKE, TEXAS.
I JUST WANT TO REMIND EVERYBODY THAT WHEN THIS PROJECT WAS ORIGINALLY APPROVED IN 2004, WE HAD A TINY LITTLE PARK SPACE THAT WAS ABOUT FOUR ACRES, AND IT WAS NOT EVEN IN THE MIDDLE OF THE RETAIL DEVELOPMENT.
SO, THIS OPEN SPACE AND PARK SPACE IS MUCH, MUCH BETTER THAN WHAT WAS ORIGINALLY APPROVED IN 2008.
THAT'S BEEN 16 YEARS AGO THAT WE HAVE BEEN THAT PEOPLE IN CARILLON HAVE BEEN WAITING FOR SOMETHING TO FINALLY GET FINALIZED, MAKE A DECISION, AND FINALLY GET SOME THINGS FINALLY FINALIZED.
SO I HAVE NO PROBLEM WITH THE OPEN PARK SPACE, THE HOMES, THE RECENT REVISION OR THE REQUEST FOR A MINIMUM OF 1600.
THERE ARE PEOPLE WHO WANT LARGER HOMES.
AND YOU AND I APPRECIATE WHAT YOU SAID.
I THINK IT WAS THE AUGUST 17TH, 2023 PLANNING AND ZONING MEETING WHERE IT DOESN'T MATTER FROM THE OUTSIDE, PEOPLE AREN'T GOING TO TELL THE DIFFERENCE WHAT'S GOING ON IN THE INSIDE.
THE NUMBER OF UNITS ARE GOING TO BE THE SAME.
SO WHAT DIFFERENCE DOES IT MAKE WHETHER IT'S 1600 OR 2000 300 OR 2900, THE 1600 SQUARE FEET HOMES? THERE'S A MARKET FOR THAT.
MY HUSBAND AND I HAD A 1470 FIVE SQUARE FOOT HOME, THREE BEDROOM, TWO BATH, AND IF I COULD HAVE 1600 SQUARE FEET, I COULD MAKE A BEAUTIFUL HOME FOR US. IT IS STILL MORE THAN WHAT CITY COUNCIL HAS APPROVED FOR THE CONDOS AND SOUTHLAKE TOWN SQUARE. IF IT CAN BE APPROVED FOR THEM, WHY CAN'T IT BE APPROVED FOR US? WE THERE'S A POPULATION OF US AGE 55 AND OLDER.
THAT REPRESENTS ABOUT 32.7% OF SOUTHLAKE.
YOU CAN'T GIVE MORE SPACE UNLESS YOU TAKE IT AWAY FROM SOME SOMEBODY ELSE.
I'M NOT SEEING A PROBLEM WITH ANY OF THESE.
I JUST AS A CARILLON RESIDENT, I'M JUST SUPER TIRED OF CONTINUOUSLY COMING TO MEETINGS AND FOR, YOU KNOW, ARE THE, I JUST DON'T UNDERSTAND WHY WE CAN'T JUST APPROVE SOMETHING IF THERE'S NO ORDINANCE AGAINST IT.
AND IF IT'S MEETING A NEED FOR THE COMMUNITY AND IF IT'S GOING TO GET IT DONE.
I'M JUST VERY I'M READY TO GET IT DONE.
THANK YOU VERY MUCH. PUBLIC HEARING REMAINS OPEN.
WOULD ANYONE ELSE LIKE TO COME FORWARD AND COMMENT ON THIS ITEM? HI. SUSAN STEINBERGER AT 816 ROAN LANE, I'M IN THE CARILLON AREA AS WELL.
I THINK WHAT YOU'RE BEGINNING TO SENSE IS A LOT OF FATIGUE.
WE'VE BEEN DEALING WITH THIS FOR MULTIPLE, MULTIPLE YEARS, ONE DEVELOPER AFTER THE OTHER.
AND THIS PARTICULAR DEVELOPER HAS BEEN UNBELIEVABLY GRACIOUS AT CONTACTING EVERY ONE OF US.
WHAT WOULD YOU LIKE TO SEE HAPPEN? WE'D LIKE YOU TO BE A PART OF THIS.
WE WANT YOU TO BE EXCITED ABOUT IT AND WANT TO OBVIOUSLY VISIT IT YOURSELF.
IT LOOKS LIKE IT'LL BE A SPECTACULAR DEVELOPMENT, BOTH COMMERCIALLY AS WELL AS RESIDENTIAL AND I THINK AS MARI LEE WAS ALSO SAYING, WE'RE REALLY TIRED OF HAVING TO REDO THIS OVER AND OVER AND OVER AGAIN.
SO I DON'T HAVE A PROBLEM WITH ANY ONE OF THOSE EITHER.
I THINK THE FATIGUE IS SETTING IN BECAUSE IT'S LIKE IT'S DONE.
IT'S NOT DONE. IT'S CONSTRUCTION STARTS, IT STOPS, IT STARTS, IT STOPS.
ALL THIS STUFF OVER MULTIPLE YEARS NOW.
AND SO IT'S LIKE IT'S HARD TO UNDERSTAND WHAT THE PROBLEM IS.
LIKE, WHY IS THIS CONTINUING TO BE AN ISSUE? SO, I MEAN, SOUTHLAKE ONLY HAS SO MANY AREAS LEFT, AND IT LOOKED LIKE THIS WAS GOING TO BE A REALLY BEAUTIFUL PIECE THAT WAS GOING TO BE A MAJOR CONTRIBUTION TO THE CITY, AND I BELIEVE IT WILL BE, AND THAT'S WHY I SUPPORT IT.
AND I LIVE IN CARILLON, SO I THINK I CAN SAY THAT.
THANK YOU. THANK YOU VERY MUCH.
[01:20:01]
PUBLIC HEARING DOES REMAIN OPEN TO ANYONE ELSE WHO WANTS TO COME FORWARD AND COMMENT ON THIS ITEM.CHRIS MUNDY 1509 LE MANS LANE, JUST AROUND THE CORNER IN CARILLON.
I'VE LIVED THERE FOR ABOUT A YEAR AND A HALF.
I LOOK AT THESE KINDS OF PROPOSALS.
I THINK IT'S AN ABSOLUTE CRIME THAT A DEVELOPER CAN GET THIS FAR, AND I'M NOT SURE IT'S A DEVELOPER ISSUE OR A CITY ISSUE OR BOTH, BUT THAT THERE'S UNCERTAINTY AT THIS STAGE BECAUSE IT WORRIES ME THAT THE DEVELOPER JUST THROWS THEIR HANDS UP AND YOU'RE LEFT WITH WHAT'S THERE TODAY, WHICH WOULD JUST BE A SHAME.
I LOOK AT THINGS LIKE NUMBER SEVEN, AND I FULLY ADMIT I'M LATE TO THE GAME ON THIS IN TERMS OF FOLLOWING THE NUANCES THROUGH THE THE PROCESS.
BUT, YOU KNOW, THE 1600 SQUARE FOOT, AS IT'S BEEN POINTED OUT, HAS BEEN APPROVED ELSEWHERE.
THERE'S OBVIOUSLY DEMAND FOR IT.
I PERSONALLY THINK VARIABILITY WITHIN A DEVELOPMENT IS A GOOD THING FOR THE DEVELOPMENT.
BUT AS I SAY, OVERALL, I THINK THE PROJECT'S GOT INERTIA AT THIS POINT.
IT WOULD BE GOOD TO MOVE FORWARD.
YOU KNOW, AND AS I SAID, I FEAR MORE THAT SOME OF THESE NUANCES, WHETHER THEY'RE ON THE DEVELOPER SIDE OR ON THE CITY SIDE, IT WOULD JUST IT WOULD BE A SHAME IF IT GOT TO THE POINT WHERE THINGS DIDN'T MOVE FORWARD.
AND AS WE HEARD, THE FATIGUE IS, IS KIND OF THE ISSUE.
I LIVE AT 1709 RIVIERA, RIGHT ACROSS THE STREET FROM ALL THIS.
THE FIRST THING MR. TERRELL MENTIONED WAS THAT THE PHASE ONE IS COMPLETE.
I SEE THE WALLS AROUND THE WHERE THOSE LOT HOUSES ARE GOING TO BE, AND THEY DON'T LOOK FINISHED.
TO ME, IT'S LIKE THE CINDER BLOCK WALLS ARE THERE, BUT THE DECORATIVE BRICKS ARE JUST NOT THERE.
IT'S YOU CAN ASK STAFF QUESTIONS AFTERWARDS.
THIS ISN'T Q AND A. I'M SORRY I SAID YOU CAN ASK STAFF SPECIFIC QUESTIONS AFTERWARDS.
THIS IS JUST PUBLIC COMMENT TIME.
YEAH. NO, BUT THEY'RE HAPPY TO HELP WITH THAT OKAY.
OKAY. NOW THEY CAN HELP WITH THAT OR ANY OF THE OTHER QUESTIONS THAT CAME UP TONIGHT.
THANK YOU. PUBLIC HEARING REMAINS OPEN.
WOULD ANYONE ELSE LIKE TO COME UP AND COMMENT ON THIS ITEM? ALL RIGHT. SEEING NO ONE, WE'LL GO AHEAD AND CLOSE THE PUBLIC HEARING, I GUESS MAYBE A FEW THINGS QUICKLY AGAIN, YOU KNOW, AND IT SOUNDS LIKE THERE'S A LOT OF FOCUS ON THE BROADER DEVELOPMENT, WHICH I THINK WE GET.
BUT THIS EVENING WE'RE HERE SPECIFICALLY TO KIND OF REVIEW THESE SEVEN REQUESTS.
I KNOW THERE'S IT SOUNDS LIKE AT A MINIMUM, THE APPLICANT COULD PROBABLY REACH OUT AGAIN TO SOME OF THE NEIGHBORS ALONG RIVIERA LANE JUST TO SEE IF THERE'S ANYTHING THAT CAN BE DONE TO, I GUESS, HELP WITH, YOU KNOW, SOME OF THE ONGOING DEVELOPMENT THERE.
SO MAYBE THAT'S SOMETHING WE CAN JUST NOTE, JUST CONTINUED OUTREACH TO THE EXTENT IT'S HELPFUL.
ALTHOUGH STAFF I GUESS I DO HAVE ONE QUICK QUESTION.
ON THE ITEM NUMBER SIX, THE ENTRANCE OFF HIGHWAY 114.
IF YOU TURN INTO THAT ENTRANCE, WHICH IS SHOWN ON THE MAP HERE, AND YOU GO STRAIGHT FORWARD.
IS THERE ACCESS UP THAT WAY TOWARDS RIVIERA DRIVE OR IS THAT, IT'S KIND OF HARD TO TELL ON THE MAP.
IS THAT KIND OF A THAT DOES HEAD NODS OF NO FROM THE GALLERY.
THANK YOU FOR NOT SPEAKING OUT LOUD, BUT I'LL LET STAFF ADDRESS IT.
SURE, THE PREVIOUS CONDITIONS WERE THAT THAT IS LIMITED TO EMERGENCY ACCESS ONLY GOING BACK TO RIVIERA UNDER THE CURRENTLY APPROVED DEVELOPMENT PLAN.
OKAY. SO AS OF NOW THE ANSWER IS NO.
THERE'S NO ACCESS UP TOWARDS THE RESIDENTIAL FROM THERE.
IS THAT CORRECT? CORRECT. THAT IS ONLY EMERGENCY ACCESS.
AND WHAT YOU'RE ACTUALLY I THINK SEEING RIGHT THERE.
AND IT'S A DASHED LINE NEXT TO THE SIX.
YES. THAT IS A COMMON ACCESS BACK TO THE FUTURE CORPORATE DISTRICT.
[01:25:06]
THAT'S. YEAH. OKAY.OKAY. THAT WAS THE ONLY QUESTION I HAD.
I GUESS. ANY OTHER QUESTIONS FOR STAFF OR ANYONE BEFORE WE GO THROUGH THIS? OKAY. ON THE FIRST ITEM, I GUESS, I MEAN, I HEAR SOME OF THE SENTIMENT THAT, YOU KNOW, COMMISSIONER SPRINGER SAID, BUT I GUESS I'M WARY TO BE SUPPORTIVE OF THAT ONE UNTIL I SEE COUNCIL MEMBERS SUPPORTIVE OF IT.
BUT I'LL, YOU KNOW, WE CAN SEE WHAT OTHER PEOPLE THINK ON THAT ONE AS WELL.
CAN I JUST MAKE A GENERAL COMMENT? I MEAN, SOME OF THE FEEDBACK.
BUT I THINK IT ALSO THERE'S FATIGUE ON THE CITY SIDE TOO RIGHT.
AND I THINK THAT WHEN YOU LOOK AT ITEMS LIKE THE OPEN SPACE OR THE PRIVATE DRIVE OR YOU LOOK AT EVEN THE POTENTIAL OF THE PUBLIC LIBRARY PERFORMING ARTS BEING CONVERTED TO RETAIL, I MEAN, THAT ADDS 20% MORE RETAIL TO ALREADY HAVING 124,000FT² OF RETAIL CAPACITY.
NONE OF THESE ARE GOING TO MAKE THE PROJECT GO FORWARD OR NOT GO FORWARD.
RIGHT. LIKE, I MEAN, THEY THE ENTITLEMENTS ARE THERE TO BUILD A PROJECT.
AND SO IF THERE'S FRUSTRATION WITH THE CITY THAT IF WE DON'T APPROVE ALL OF THIS, THAT WE'RE INHIBITING DEVELOPMENT, THAT'S JUST NOT, THAT'S NOT TRUE. RIGHT.
YES. NO. THESE ARE JUST REQUESTED REVISIONS.
NOTED. SO MAYBE JUST GOING THROUGH EACH OF THESE ONE AT A TIME.
I GUESS I ALREADY SAID MY THOUGHTS ON ITEM NUMBER ONE.
ANYONE ELSE WANT TO JUST JUMP IN SO WE CAN KIND OF HELP OUR VICE CHAIR CRAFT A MOTION HERE? WELL, I THINK SOMETHING COMMISSIONER REYNOLDS SAID REALLY STUCK WITH ME ON REVISION ONE.
SO BASED ON THAT, I THINK I WOULD I WOULD HAVE A HARD TIME APPROVING THIS ONE.
OKAY. SO THAT'S ONE, TWO, THREE STRUGGLES.
ANY OTHER STRUGGLES OR NOT? WELL, I WAS LOOKING AT IT FROM A DIFFERENT STANDPOINT, WHICH IS THE RESPONSIBILITY AND LIABILITY OF THE CITY.
ESPECIALLY IF THERE'S A WATER FEATURE WHICH GIVES ME A LITTLE PTSD WITH OTHER DEVELOPMENTS IN TOWN.
SO I MEAN, I SEE THAT THERE'S A BENEFIT WITH IT TOO.
I DON'T REALLY FEEL STRONGLY EITHER WAY, QUITE FRANKLY.
ANY ANY OTHER VIEWPOINTS? THIS SOUNDS LIKE IT'S A COIN FLIP NOW, SO.
WELL, I MEAN, I WAS FINE, I THINK WITH ALL OF THESE THE LAST TIME THIS CAME AROUND.
I MEAN, THE REALITY IS WE CAN SIT HERE AND TALK ALL NIGHT.
BUT CITY COUNCIL HAS ALREADY SAID THEY DON'T WANT WHAT, NUMBER ONE AND POSSIBLY NUMBER SEVEN.
SO I MEAN, THEY'RE GOING TO HAVE TO MAKE THE DECISION.
WELL, WE'LL. SO IS THAT INCLUDING SUPPORT OR NOT SUPPORT OF SEVEN OR.
I'M IN. I'M IN FAVOR OF ALL OF THEM.
I MEAN, I THINK THE COMMENT ON NUMBER SIX WAS A GOOD ONE.
SO I KIND OF LIKE THE IDEA OF HOLDING BACK ON SIX, BUT I'M GOOD WITH EVERYTHING ELSE.
OKAY WELL, MAYBE I'LL TICK THROUGH THEM REALLY QUICKLY THEN.
ANY ISSUES ON TWO, THREE, FOUR AND FIVE? OKAY. ON SIX.
BUT I GUESS ONCE IT GETS DONE, I DON'T HAVE AN ISSUE WITH THE CITY FOLLOWING SUIT PERSONALLY.
WELL, YEAH. AND YOU HAVE TO TAKE INTO CONSIDERATION TOO, THE, THE, YOU KNOW, THE ISSUE OF SCALE.
I MEAN, THEY'RE ALREADY OUT THERE POURING CONCRETE AND PAVING, DOING EXCAVATION WORK.
IT'D BE SO MUCH BETTER TO HAVE IT PREPPED AND READY FOR THE ENTRANCE, WHETHER IT CAME THERE OR NOT.
IT'S, YOU KNOW, IT'S A THOROUGHFARE AND IT'LL EVENTUALLY GET USED.
BUT WHETHER TXDOT MAKES THE CURB CUT IS, YOU KNOW, NOT GOING TO AFFECT THAT PART.
OKAY. AND THEN ITEM SEVEN AGAIN I GET THE LOGIC BEHIND IT.
BUT YOU KNOW, WE'VE ALREADY HEARD FROM COUNCIL ONCE PRETTY CLEARLY THAT THEY WEREN'T SUPPORTIVE OF OPENING IT BACK UP, SO I'M WARY OF SUPPORTING THAT ONE AS WELL, GIVEN THE GUIDANCE WE'VE RECEIVED SO FAR, WHICH IS ALL I CAN GO ON.
[01:30:04]
WELL, MY COMMENT ON THAT IS THEY'RE LOCKED IN ON THE SQUARE FOOTAGE.YOU KNOW, YOU'RE PUTTING THREE LOTS ACROSS THE BACK OF SOMEBODY ELSE'S LOT.
IT'S ALL INTERIOR SPACE AND TO ME, I JUST DON'T SEE WHERE THE CONFLICT COMES IN.
THIS IS THIS IS NOT LIKE, YOU KNOW, AN SF 20 LOT VERSUS WHATEVER.
IT'S, YOU KNOW, IT'S WHAT IT IS.
IT'S LIMITED ON THE NUMBER OF UNITS AND THE NUMBER OF SQUARE FOOTAGE.
IT'S JUST HOW YOU ALLOCATE IT.
OKAY. ANY OTHER THOUGHTS ON THAT ONE? I SUPPOSE MAYBE WHAT WE CAN DO IS ENTERTAIN A MOTION, SEE HOW IT GOES AND GO FROM THERE.
MR. CHAIRMAN, I MAKE A MOTION THAT WE APPROVE ITEM NUMBER SEVEN ON OUR AGENDA.
ZA 24-0042, SUBJECT TO OUR STAFF REPORT DATED AUGUST 30TH, 2024 AND SUBJECT TO THE DEVELOPMENT PLAN REVIEW SUMMARY NUMBER TWO, DATED AUGUST 30TH, 2024, SPECIFICALLY NOTING A RECOMMENDATION FOR APPROVAL ON ITEMS TWO THROUGH SEVEN. EXCUSE ME, ITEMS TWO THROUGH SIX RECOMMENDING DENIAL ON ITEMS ONE AND SEVEN, AND ALSO ASKING THE DEVELOPER TO HAVE CONTINUED COMMUNICATION WITH THE RESIDENTS ON RIVIERA LANE AND PERHAPS EXPLORING ALTERNATIVES ON ITEM NUMBER FIVE AND CHANGING THE ROAD FROM PUBLIC TO PRIVATE.
DO WE HAVE A SECOND? I'LL SECOND THE MOTION.
WELL, A LOT TO DELIBERATE THERE.
AND IT SOUNDS LIKE YOU'LL MAKE THE NEXT.
YOU KNOW, AS YOU, IF ANYBODY KNOWS, WE ARE RECOMMENDING BODY.
I THINK YOU'RE THE ONE WHO MADE US THAT WAY.
SO A FEW YEARS BACK SO THIS IS THE NEXT CITY COUNCIL MEETING, SEPTEMBER 17TH, I BELIEVE.
ARE YOU PLANNING ON MAKING THAT ONE? OKAY, I'M SEEING A HEAD NOD.
SO JUST SO THE GALLERY KNOWS THAT'S OUR RECOMMENDATION BEING PASSED ON TO COUNCIL.
THE NEXT MEETING, SEPTEMBER 17TH.
WHICH, AS OF NOW, SOUNDS LIKE THE APPLICANT WILL PLAN ON MAKING THAT ONE.
SO I THINK THAT'S THE LAST ITEM ON OUR AGENDA.
ARE WE GOOD TO GO AHEAD AND ADJOURN STAFF? OKAY. WE'RE GOOD TO ADJOURN. THANK YOU FOR COMING OUT TONIGHT.