SALT LAKE CITY COUNCIL MEETING FOR FEBRUARY 3RD, 2026.MY NAME IS SEAN MCCASKILL, AND AS MAYOR, I CALL THE MEETING TO ORDER.
WE'RE GOING TO START OUR WORK SESSION AS WE ALWAYS DO BY INVITING PASTOR CLAYTON REED, WHO IS OUR OFFICIAL CITY CHAPLAIN FROM SALT LAKE BAPTIST CHURCH, TO LEAD US IN PRAYER.
AND THEN IF YOU'RE ABLE TO REMAIN STANDING FOR THE PLEDGE OF ALLEGIANCE AND THE PLEDGE TO TEXAS.
LORD, WE GIVE THANKS FOR OUR TIME TOGETHER TONIGHT.
AS WE CONSIDER TONIGHT'S AGENDA, THERE'S ISSUES AND DISCUSSIONS THAT NEED TO HAPPEN, AND NONE OF US HAS THE ABILITY TO SEE VERY FAR INTO THE FUTURE.
SO I PRAY THAT YOU WOULD GIVE THE GROUP AND PEOPLE IN FRONT OF ME AND THE ONES BEHIND ME WISDOM AS THEY WORK OUT WHAT IT SHOULD BE.
HELP THEM TO SEE, MAKE GOOD DECISIONS, AND WE JUST PRAY BLESSING OVER THEIR THOUGHTS, THEIR CONSIDERATIONS, THEIR DELIBERATIONS.
BUT MORE THAN THAT, WE PRAY THAT YOU WOULD SEND PEACE INTO THIS ROOM AND TO THE HEARTS OF THE PEOPLE THAT SERVE HERE.
LORD, THIS WORLD IS A STRONG AND HARD PLACE AT TIMES, AND THERE ARE A LOT OF PEOPLE IN THIS ROOM WHO WORK LONG HOURS, AND I JUST PRAY THAT YOU WOULD FILL THEM WITH HOPE ABOUT THEIR FUTURE.
AND I PRAY THAT YOU WOULD ENCOURAGE THE DOWNTRODDEN, THE DOWNHEARTED AMONG US.
WE LIVE IN A GREAT CITY, AND WE JUST PRAY, LORD, THAT YOU WOULD FILL OUR CITY WITH JOY, WITH PEACE, WITH HOPE.
AND LORD, AS WE ENCOURAGE EACH OTHER AND WORK TOGETHER, I JUST PRAY THAT YOUR KINGDOM WOULD BE ADVANCED IN MEANINGFUL AND HELPFUL WAYS THROUGH THE LIVES OF THE PEOPLE IN THIS ROOM, THROUGH ALL OF OUR LIVES.
LORD, WE THANK YOU MOST OF ALL THAT WE ARE FREE, AND WE HAVE THE ABILITY TO LOVE AND TO HELP EACH OTHER, AND I PRAY THAT YOU WOULD GIVE US PEACE AND STRENGTH TO DO THAT.
LORD, WE ALSO THANK YOU FOR JESUS CHRIST AND THE HOPE THAT WE HAVE BECAUSE OF HIM, AND I PRAY BLESSINGS ON THIS MEETING AND THE PEOPLE IN THIS ROOM.
I, PASTOR EATON, PLEDGE ALLEGIANCE.
I PLEDGE ALLEGIANCE TO THE FLAG OF THE UNITED STATES OF AMERICA AND TO THE REPUBLIC FOR WHICH IT STANDS, ONE NATION, UNDER GOD, INDIVISIBLE, WITH LIBERTY AND JUSTICE FOR ALL.
ON THE TEXAS FLAG, I PLEDGE ALLEGIANCE TO THE TEXAS, ONE STATE, UNDER GOD, ONE AND INDIVISIBLE COMMUNITY.
NEXT IS WORK SESSION ITEM NUMBER THREE, METROPORT MEALS ON WHEELS AND THE PARTY
[3. Metroport Meals on Wheels – Party in the Pasture 2026]
IN THE PASTOR 2026.AND FOR THIS ITEM, I WILL TURN IT OVER TO DEPUTY MAYOR PRO TEM KATHY COWLEY, WHO WILL INTRODUCE SOME FOLKS FROM METROPORT MEALS ON WHEELS.
TO TALK ABOUT PARTY IN THE PASTOR 2026.
AS I'M SURE YOU ALL ARE AWARE, WE HAVE ARRANGEMENTS AND AGREEMENTS WITH SOME WONDERFUL GROUPS AND NON-PROFITS ACROSS OUR CITY AND OUR AREA.
AND METROPORT MEALS ON WHEELS IS ONE OF THOSE.
I'VE BEEN BLESSED TO BE ON THE BOARD FOR SEVERAL YEARS NOW.
I STARTED OUT AS DELIVERING MEALS BEFORE THAT WHEN MY GIRLS WERE IN NATIONAL CHEER LEAGUE, AND THAT'S HOW I MET MARY, AND CAME TO KNOW AND LOVE THE ORGANIZATION.
AND SO, WE WANT TO LIFT THESE ORGANIZATIONS UP, SO YOU'LL HEAR FROM MORE THIS YEAR.
BUT FOR TONIGHT, WE WANT TO RECOGNIZE METROPORT MEALS ON WHEELS AND THE PARTY IN THE PASTOR.
MARY KING HAS BEEN OUR EXECUTIVE DIRECTOR FOR SOME TIME, AND WE LOVE HER AND CHERISH HER.
AND I THINK JOHN PAYNE WAS GOING TO COME, OUR FORMER BOARD CHAIR, BUT HE HASN'T MADE IT YET.
MAYOR AND COUNCIL MEMBERS, THANK YOU SO MUCH FOR THE OPPORTUNITY TO BE HERE.
AND MORE THAN THAT, THANK YOU FOR THE MANY, MANY YEARS OF PARTNERSHIP WE'VE HAD IN SERVICE TO THE SENIORS OF SOUND LAKE.
WE'VE BEEN DELIVERING MEALS FOR QUITE SOME TIME HERE, AND IT IS A JOY ALSO TO BE AT THE SENIOR CENTER EVERY MONDAY.
WE INVITE YOU TO JOIN US ANY TIME YOU HAVE A FREE MINUTE AND WOULD LIKE TO HAVE A FUN LUNCH.
OKAY. OUR MISSION IS TO BE A GRASSROOTS VOLUNTEER ADVOCATE FOR THE ELDERLY AND THOSE IN NEED THROUGH HOME-DELIVERED MEALS, SENIOR CENTER LUNCHEONS, AND OTHER ACTIVITY PROGRAMS AND SUPPORT SERVICES.
NEIGHBORS HELPING NEIGHBORS TO ALLEVIATE ISOLATION, HUNGER, AND LONELINESS
[00:05:02]
IN OUR COMMUNITIES, AND TO FOSTER THE DIGNITY, WORTH, AND INDEPENDENCE OF EACH INDIVIDUAL WE SERVE IS OUR VISION AND SOMETHING WE STRIVE TO DO ON AN ONGOING BASIS.WE WERE FOUNDED IN 1980, AND SINCE 1980 WE HAVE HAD QUITE A LOT OF ACTIVITY.
A LITTLE BIT OF MY SLIDE HAS VAPORIZED, BUT WE, FOR THE FIRST 12 YEARS, OUR VOLUNTEERS COOKED MEALS IN THEIR OWN HOME AND DELIVERED TO OUR PARTICIPANTS.
IN 2012, I'M SORRY, IN 1992 WE FORMED A PARTNERSHIP WITH THE MARRIOTT SALAMA HOTEL, AND THEY BECAME THE FIRST OF OUR RESTAURANT PARTNERS, AND OUR CULTURE IS REALLY BUILT ON DEVELOPING FOOD PARTNERSHIPS WITH FOOD PROFESSIONALS IN THE COMMUNITY SO THAT THE MEALS ARE PREPARED LOCALLY, LOCAL VOLUNTEERS DELIVER THE MEALS, AND THE COMMUNITY AS A WHOLE IS MORE AWARE OF WHAT'S GOING ON AND WHAT SENIOR NEEDS IN THE COMMUNITY ARE.
FAST FORWARDING 2013, WE PASSED THE 1 MILLION MEAL MILESTONE.
IN 2025, THAT HAD GROWN TO 2.5 MILLION MEALS.
WE HAVE SIGNATURE FUNDRAISERS, PARTY IN THE PASTURE IS ONE, AND I WILL CLOSE WITH THAT.
WE APPRECIATE OUR RELATIONSHIP WITH THE CITY, THAT ENABLED US TO HAVE HEELS FOR HOT MEALS, OUR FIRST LADIES' LUNCHEON, THAT IS GOING TO BE AN ONGOING EVENT HERE AT, WELL, IN SOUTHLAKE AT THE MARK THIS YEAR, AND WE ARE SO EXCITED TO BE MAKING PLANS FOR THAT FOR NEXT YEAR.
RIGHT NOW WE ARE SERVING MEALS, HOME-DELIVERED MEALS, TO ABOUT 275 PEOPLE A DAY, AND WE HAVE 12 SENIOR CENTER SITES.
THE SOUTHLAKE SENIOR CENTER SITES WAS ONE OF OUR FIRST, AND IT IS ONE, WE LOVE THEM ALL, BUT MONDAYS ARE ALWAYS VERY SPECIAL.
WE HAVE ABOUT EIGHT PEOPLE RIGHT NOW WHO ARE RECEIVING MEALS IN SOUTHLAKE LAST YEAR.
OVER THE COURSE OF THE YEAR, WE HAD OVER, WE HAD 20 SENIORS WHO WERE RECEIVING HOME-DELIVERED MEALS AT SOME POINT DURING THE YEAR.
SO, THE NEED IS CONTINUING AND ONGOING.
OKAY, AGAIN, OVER TWO AND A HALF MILLION MEALS SINCE WE STARTED.
ONE OF THE UNIQUENESSES ABOUT OUR PROGRAM, AND UNLIKE MOST OF OUR COLLEAGUES IN THE MEALS ON WHEELS COMMUNITY, WE CHOOSE NOT TO TAKE FEDERAL FUNDS.
SO, ALL OF THE FUNDING FOR THE MEALS THAT HAPPEN IS GENERATED LOCALLY FROM INDIVIDUALS, FROM THE EVENTS THAT WE HAVE, FROM COMMUNITY SUPPORT AND SUPPORT OF MANY OF THE CITIES THAT WE SERVE.
WE ARE ABLE, BECAUSE WE DON'T TAKE FEDERAL FUNDS, TO LOOK AT NEED ON A LOCAL BASIS.
AND OUR DEFINITION REALLY IS CENTERED AROUND HUNGER AND ISOLATION, NOT INCOME OR AGE.
THAT BEING SAID, 86% OF OUR PEOPLE LAST YEAR NEEDED FINANCIAL ASSISTANCE TO MEET THE COST OF THEIR FOOD.
OUR AVERAGE COST WAS $6.78 JUST FOR THE FOOD THAT WE DELIVERED.
THE AVERAGE PAYMENT WE RECEIVED FROM HOME DELIVERY RECIPIENTS WAS $1.28.
LAST YEAR, WE DELIVERED ALMOST 53,000 HOME-DELIVERED MEALS.
AND THOSE INCLUDE PERSONAL VISITS AND SUBTLE WELFARE CHECKS.
OVER THE COURSE OF THE YEAR, WE PROBABLY HAD ABOUT 15 SITUATIONS THAT WE ENCOUNTERED AS WE DELIVERED MEALS ACROSS OUR SERVICE AREA THAT RESULTED IN A 911 EMERGENCY CALL.
WE HAD ANOTHER 700 MISSING IN ACTION ATTEMPTED DELIVERIES WHERE THE PARTICIPANT WAS EITHER NOT ANSWERING THE DOOR OR NOT AT HOME, AND THAT ALL RESULTED IN PERSONAL PHONE CALLS TO THEIR EMERGENCY CONTACTS AND FOLLOW-UP TO MAKE SURE THAT THE PARTICIPANT WAS INDEED SAFE.
WE SERVED OVER 76,000 MEALS IN SENIOR CENTERS, AND WE PROVIDED OVER 28,000 SHELF-STABLE MEALS TO OUR
[00:10:04]
HOME-DELIVERY PARTICIPANTS.INCLUDED IN THOSE SHELF-STABLE MEALS WAS A SPECIAL PACK OF WINTER MEALS, WHICH MANY PEOPLE HAVE SAID, GEE, WITH THE WEATHER LAST WEEK, HOW DID YOU TAKE CARE OF THE SENIORS? THE WINTER MEALS WENT OUT IN NOVEMBER WITH A NOTE TO PLEASE SAVE UNTIL THERE WAS ICE AND SNOW ON THE GROUND, BUT THE WINTER MEAL BAGS HAD ABOUT FOUR DAYS' WORTH OF FOOD SO THAT THE PARTICIPANTS HAD SOMETHING IN THEIR HANDS THAT THEY COULD EAT WITHOUT HAVING TO LEAVE THE HOUSE OR DEPEND ON SOMEONE ELSE TO BRING IT TO THEM.
WE PROVIDED ALMOST 2,500 NUTRITIONAL SUPPLEMENT MEALS.
AGAIN, THESE WERE TO HOME-BOUND PARTICIPANTS, AND OUR RELATIONSHIP WITH THE TEEN COURT, IT SOUNDS LIKE, IS ONE OF THE, JUST A KEY COMPONENT OF THAT PROGRAM BECAUSE THAT IS ONE OF THE DONATIONS THAT THE TEEN COURT FOLKS CAN MAKE TO BUY DOWN A PORTION OF THEIR HOURS.
IT IS SOMETHING THAT WE SUBMIT AND REQUEST APPROVAL FOR, AND TEEN COURT HAS BEEN VERY SUPPORTIVE OF THAT.
IN ADDITION, WE PROVIDED OVER 08,700 MEALS AND OVER THREE TONS OF FOOD TO LOCAL FOOD PANTRIES AND COMMUNITY ASSISTANCE PROGRAMS THROUGH CHURCHES, COMMUNITIES, WHAT HAVE YOU, ACCESS THAT'S DONATED TO US THAT THE MOST EFFICIENT USE IS TO PASS THROUGH TO THEM SO THAT THEY CAN GET IT IN PEOPLE'S HANDS QUICKLY.
WE PROVIDE PET FOOD ASSISTANCE.
WE COLLABORATE WITH DON'T FORGET TO FEED ME.
THAT ORGANIZATION PROVIDES BOTH DOG FOOD AND CAT FOOD, WHICH WE BAG UP IN FOUR-POUND BAGS AND DELIVER MONTHLY TO THE FOLKS THAT HAVE PETS AND NEED ASSISTANCE WITH THE FOOD.
OUR STOCKING TREE PROVIDED OVER 1,000 PERSONAL GIFTS FOR OUR HOME DELIVERY SENIORS OVER THE HOLIDAYS AND WAS JUST A WONDERFUL, ENERGIZING AND EXCITING PROGRAM TO DEAL WITH, BUT TO SEE THE HAPPINESS ON A BASIS AND TO HEAR COMMENTS THAT, GEE, IF IT HADN'T BEEN FOR YOU ALL, I WOULDN'T HAVE HAD A CHRISTMAS, MADE EVERY BIT OF IT WORTHWHILE.
OUR HOME DELIVERY PARTICIPANTS RANGED LAST YEAR FROM AGE 30 TO 105, 79% WERE OVER AGE 70, 68% WERE WOMEN, 70% WERE SINGLE, AND 100% WERE ALONE FOR EXTENDED PERIODS.
EIGHTY-FIVE PERCENT OF THE PEOPLE WE SERVED CONTINUED LIVING INDEPENDENTLY IN THEIR OWN HOMES.
OUR MAJOR SOURCES OF FUNDING, EVENTS AND ENTERPRISES, HEELS FOR HOT MEALS, OUR GOLF TOURNAMENT, AND SADIE'S UPSCALE, WHICH IS A CONSIGNMENT AND RESALE STORE IN ROANOKE.
DONATIONS FROM INDIVIDUALS, CORPORATIONS, CHURCHES, CIVIC ORGANIZATIONS, FOUNDATION GRANTS, AND OUR CITY SCOPE OF SERVICES AGREEMENT, AND AGAIN, WE ARE SO APPRECIATIVE FOR THE AGREEMENT THAT WE HAVE WITH SOUTHLAKE.
MEAL PAYMENTS, IF ABLE, OUR PARTICIPANTS DO PAY FOR A PORTION OF THE COST OF THEIR HOME DELIVERED MEALS.
WE ASK A $7 SUGGESTED DONATION FOR OUR SENIOR CENTER MEALS.
JUST TO GIVE YOU A SCOPE OF OUR AREA, ROUGHLY DFW AIRPORT WEST BOYD AND WISE COUNTY, SOUTH OF CITY OF DENTON AND NORTH OF NORTH LOOP 820.
SENIOR CENTERS, AND EACH CENTER IS DESIGNED TO MEET THE NEEDS OF THE COMMUNITY.
SO I HAVE A COUPLE OF CENTERS, KELLER AND BRIGHTLINE, THAT MEET THREE DAYS A WEEK, AND WE PROVIDE MEALS THREE DAYS A WEEK.
SOUTHLAKE, COLLEYVILLE, ROANOKE, JUSTIN, HASLETT, AND HALTON CITY ARE ONCE A WEEK.
I'M SORRY, COLLEYVILLE IS TWICE A MONTH.
BUT AGAIN, WE WANT TO BE RESPONSIVE TO THE NEEDS OF THE COMMUNITY AND NOT JUST DO A RUBBER STAMP PROGRAM THAT MEETS OUR NEEDS, BUT DOESN'T NECESSARILY MEET YOURS.
DIGNITY, RESPECT, CONCERN, AND CONTACT.
WE DELIVER FOOD, WE DELIVER FRIENDSHIP, AND SO MUCH MORE.
WE ALWAYS WANT TO BE MORE THAN JUST A MEAL.
PARTY IN THE PASTURE IS OUR MAJOR FUNDRAISER.
IT IS ON SATURDAY, FEBRUARY 28TH, AT CIRCLE T RANCH.
[00:15:01]
I KNOW SEVERAL OF YOU HAVE PURCHASED TICKETS.WE HAVE SPONSORSHIPS FROM SOME OF YOU.
WE ARE VERY GRATEFUL FOR THAT.
PLEASE COME CELEBRATE WITH US.
IT IS NOT LIKE YOUR TRADITIONAL BALLROOM GALA.
IT IS A FUN, FUN PARTY WITH LOTS OF WAYS TO SUPPORT METROPORT MEALS ON WHEELS AND THE SENIORS THAT WE SERVE.
SO, Y'ALL COME, AND THANK YOU.
I THINK ONE OF THE THINGS I WANT TO CONVEY AS I WAS LISTENING TO ALL OF THAT INCREDIBLE DATA THAT YOU SHARED IS THAT AS A BOARD MEMBER, IN OUR MONTHLY BOARD MEETINGS, MARY WILL OFTEN SHARE PARTICIPANT STORIES.
AND THOSE ARE JUST SO HEARTWARMING.
PEOPLE WILL WRITE IN, CONTACT MARY, AND LET HER KNOW THEIR SITUATION AND HOW METROPORT MEALS ON WHEELS HAS REACHED OUT AND HELPED THEM, THEIR FAMILIES, THEIR LOVED ONES, AND I DON'T HAVE ANY OF THOSE THAT I COULD READ, BUT IT'S JUST SO HEARTWARMING.
AND AS A DRIVER MYSELF, ONE OF THE THINGS THAT REALLY DREW ME TO METROPORT MEALS ON WHEELS IS WHAT MARY SPOKE ABOUT EARLIER.
AND THAT'S THAT BECAUSE WE DON'T RECEIVE FEDERAL FUNDING, WE ARE NOT SUBJECT TO THE FEDERAL CRITERIA FOR ACCEPTING PARTICIPANTS.
AND SO, I DROVE MEALS REGULARLY TO A FAMILY THAT HAD A SEVERE SPECIAL NEEDS CHILD, AND MOM COULDN'T LEAVE THE HOUSE.
AND SO, IT'S A, I'M NOT HARSH AT ALL, BUT IT'S A WONDERFUL ORGANIZATION.
AND REALLY, THE AMOUNT OF COMMUNITIES THAT ARE SERVED IS INCREDIBLE, SO THANK YOU, MARY.
WE LOOK FORWARD TO PARTYING IN THE PASTURE BACK AT CIRCLE T RANCH.
I KNOW LAST YEAR WE WERE AT THE PEROT HANGAR OUT AT THE ALLIANCE AIRPORT, AND THAT WAS GREAT.
IT WAS EXCITING WHEN A STORM ROLLED IN AND SOME PRIVATE JETS HAD TO BE MOVED INTO THE HANGAR, AND WE WERE ALL STANDING AROUND WITH OUR DRINKS, AND WE HAD TO WATCH THESE PLANES COME IN.
THAT WAS FUN, BUT CIRCLE T RANCH IS A GREAT VENUE, SO WE'RE HAPPY TO BE BACK THERE.
WELL, WE'RE EXCITED TO BE BACK AT THE RANCH, AND WE ARE JUST, WE CAN'T WAIT.
WE'RE AT THE POINT NOW WHERE WE'RE NAILING DOWN ALL THOSE LOOSE ENDS THAT GO WITH AN EVENT OF THAT SIZE.
BUT, AND LIMELIGHT IS OUR MUSICAL ENTERTAINMENT FOR THE NIGHT.
THEY'RE ONE OF THE EMERALD CITY BANDS, SO IT'S PROMISING TO BE A MOST FESTIVE EVENT.
NEXT, WE'LL MOVE ON TO WORK SESSION ITEM NUMBER FOUR, DISCUSSING OUR FISCAL YEAR
[4. FY 2026 Proposed CIP Budget – Strategic Investments and Guiding Principles]
2026 PROPOSED CIP, CAPITAL IMPROVEMENT PROGRAM BUDGET, WHERE WE'RE FOCUSED ON STRATEGIC INVESTMENTS AND GUIDING PRINCIPLES, AND I'LL TURN THIS OVER TO CITY MANAGER ALLISON HARKOWSKI AND OUR CHIEF FINANCIAL OFFICER, SHARON JACKSON.TONIGHT, WE ARE PLEASED TO PRESENT THE PROPOSED CAPITAL BUDGET FOR FISCAL YEAR 2026, AND WE'LL BEGIN TONIGHT WITH AN OVERVIEW OF THE PROGRAM ROOTED IN WHAT YOU SEE HERE ON THE SLIDE.
THE CITY IS RESPONSIBLE FOR A VERY EXTENSIVE AND DIVERSE INFRASTRUCTURE PORTFOLIO, AND WHAT YOU SEE HERE IS JUST A GLIMPSE INTO THAT.
IT INCLUDES MORE THAN 200 MILES OF ROADWAYS, APPROXIMATELY 100 MILES OF STORMWATER INFRASTRUCTURE, AND NEARLY 500 MILES OF WATER AND WASTEWATER PIPELINES.
AND ALL TOGETHER, WHAT YOU SEE HERE REPRESENTS MORE THAN A HALF A BILLION DOLLARS IN GOVERNMENTAL INFRASTRUCTURE ASSETS.
THIS SCALE AND COMPLEXITY ARE WHY DISCIPLINED PLANNING THAT IS ROOTED IN STRATEGY IS ESSENTIAL TO OUR CIP.
AND YOU CAN SEE HERE ON THE SLIDE THE PROCESS THAT WE USE INTERNALLY TO GOVERN THE PREPARATION OF THE CIP, AND IT REALLY IS A YEAR-ROUND PROCESS.
IT BEGINS WITH THE DEVELOPMENT OF THE OPERATING BUDGET.
THAT'S ADOPTED HERE IN THE CHAMBERS EACH SEPTEMBER, AND FOLLOWING THAT ADOPTION, OUR TEAM MOVES INTO FINALIZING THE CAPITAL PROJECT PLAN TO MAKE SURE THAT WE ALIGN PROJECTS WITH THE ESTABLISHED FUNDING ALLOCATION.
AND WE WILL BEGIN, AS WE ALWAYS DO, IN VERY FAMILIAR TERRITORY WITH STRATEGY.
IT IS LITERALLY AT THE FABRIC OF EVERYTHING WE DO IN SOUTHLAKE, AND BUILDING THE ANNUAL CAPITAL PROGRAM IS NO EXCEPTION TO THIS, SOMETHING THAT YOU ARE ALL VERY FAMILIAR WITH.
COUNCIL'S ADOPTED STRATEGY IS OUR ANCHOR.
IT ROOTS OUR POLICIES, OUR PRIORITIES, OUR COMPREHENSIVE PLANS.
EVERYTHING IS INCORPORATED, ROOTED WITHIN THIS STRATEGY MAP, AND FROM THERE, GUIDED BY OUR FINANCIAL DEBT AND CIP GUIDING PRINCIPLES.
THESE ELEMENTS ARE GREAT PLANNING TOOLS BECAUSE THEY ARE INTENTIONALLY STABLE OVER TIME, AND THEY PROVIDE A SOLID FOUNDATION FOR CAPITAL PLANNING.
[00:20:05]
WE'VE DISCUSSED THIS BEFORE, BUT WE CONSIDER THE CIP AS BOTH A BUDGET AND ALSO A MULTI-YEAR PLAN, AND OUR WORK, WE VIEW OUR WORK AS ESSENTIALLY A TRANSLATION EXERCISE.WE TAKE THE OUTCOMES THAT YOU SEE ON THE STRATEGY MAP, THOSE LONG-RANGE GOALS THAT HAVE BEEN ESTABLISHED FOR THE CITY, THE DIRECTION IN THE VARIOUS COMPREHENSIVE PLAN ELEMENTS, ANY ADOPTED FINANCIAL POLICIES OR OTHER GUIDING PRINCIPLES, AND WE USE THOSE TO TRANSLATE THEM INTO A SEQUENCED AND AFFORDABLE CAPITAL PROGRAM.
PRIOR COUNCIL DISCUSSIONS, DIRECTIONS ON COMMITMENTS ARE ALSO CARRIED FORWARD, AND THIS ENSURES THAT WE HAVE A THROUGH LINE OF CONTINUITY AND FOLLOW-THROUGH FROM ONE CIP CYCLE TO THE NEXT.
THE PROPOSED CAPITAL IMPROVEMENTS PROGRAM THAT WE WILL SHOW YOU TONIGHT ALIGNS WITH YOUR STRATEGY, YOUR POLICIES, AND THE CIP FRAMEWORK THAT YOU HAVE PREVIOUSLY APPROVED.
THE 2026 PROJECTS YOU WILL SEE TONIGHT ARE DIRECTLY ALIGNED WITH THE CITY COUNCIL PRIORITIES AND ADOPTED PLANNING DOCUMENTS, AND THEY REFLECT THE OUTCOMES COUNCIL HAS CONSISTENTLY EMPHASIZED, PROTECTING PUBLIC SAFETY, MAINTAINING THAT CRITICAL INFRASTRUCTURE, SUPPORTING QUALITY OF LIFE, AND ALSO ENSURING LONG-TERM FINANCIAL SUSTAINABILITY.
THE PLAN IS REFLECTIVE OF THE CITY'S FINANCIAL DEBT AND CIP GUIDING PRINCIPLES, INCLUDING A STRONG PAY-AS-YOU-GO POSTURE THAT SUPPORTS A DISCIPLINED USE OF DEBT AND A FOCUS ON AFFORDABILITY ACROSS THE FULL MULTI-YEAR HORIZON.
PROJECTS ENTER THE CIP THROUGH A STRUCTURED DEPARTMENT-LED PROCESS GROUNDED IN ASSET CONDITIONS, SERVICE LEVEL EXPECTATIONS, REGULATORY REQUIREMENTS, THOSE STRATEGIC OUTCOMES THAT I'VE PREVIOUSLY DISCUSSED.
DEPARTMENTS RELY ON THESE MASTER PLANS, INSPECTIONS, CONDITION ASSESSMENTS, AND ALSO ASSET MANAGEMENT DATA TO IDENTIFY NEEDS.
WE ALSO CLEARLY DISTINGUISH BETWEEN THINGS THAT MIGHT BE MAINTENANCE OR RENEWAL, THINGS THAT MIGHT BE ENHANCEMENTS, PROJECTS THAT COULD PROVIDE ENHANCED CAPACITY SO THAT WE HAVE A NICE BALANCE AND THINGS ARE EVALUATED APPROPRIATELY AND CONSISTENTLY.
ONCE THOSE PROJECTS ARE IDENTIFIED, THEY'RE EVALUATED USING STANDARD CRITERIA.
THAT'S APPLIED CONSISTENTLY ACROSS THE ORGANIZATION.
THE PROJECTS ARE SCORED BASED ON ALIGNMENT WITH THE STRATEGY, RISK, SERVICE IMPACT, HOW READY WE ARE TO MOVE FORWARD WITH THE PROJECT, WHAT THE TIMING OF IT IS, AND IF THERE ARE UNIQUE INTERDEPENDENCIES.
THIS PRODUCES A RANKED, DEFENSIBLE PROJECT LIST THAT SUPPORTS INFORMED SEQUENCING AND FUNDING DECISIONS AT THE ENTERPRISE LEVEL.
AND OF COURSE, COST DISCIPLINE IS ALSO A VERY CRITICAL PART OF THE CIP.
WE RELY ON INDUSTRY STANDARDS AND GUIDES, HISTORICAL STAFF-LIKE DATA, MARKET INTELLIGENCE AND OTHER ECONOMIC DATA, CONSTRUCTION COST TO ESCALATION FACTORS ARE APPLIED CONSISTENTLY ACROSS CATEGORIES, AND ASSUMPTIONS ARE REFINED AS PROJECTS ADVANCE THROUGH DESIGN.
THIS APPROACH ENSURES THAT OUR CIP REFLECTS REALISTIC COSTS RATHER THAN OPTIMISTIC ASSUMPTIONS.
AND OF COURSE, EACH CIP IS SHAPED BY CURRENT REALITIES.
AS DISCUSSED, WE FACTOR IN NOT ONLY THOSE CONSTRUCTION MARKET CONDITIONS, BUT ALSO WHAT OUR CAPABILITY IS UNDER A CASH FUNDING POSTURE, WHAT OUR DEBT CAPACITY IS, AND WHAT OUR STAFF AND ORGANIZATIONAL CAPACITY IS TO DELIVER MULTIPLE LARGE PROJECTS CONCURRENTLY.
SEQUENCING DECISIONS AREN'T REALLY ABOUT JUST FINANCIAL CONSIDERATIONS, BUT ALSO ORGANIZATIONAL CAPACITY AND ALSO RISK MANAGEMENT.
AND SO TO THIS POINT, WE'VE DISCUSSED THE FOUNDATIONS OF HOW WE BUILD THE CIP, AND OVER THE NEXT PORTION OF THE PRESENTATION, WE'LL FOCUS ON WHAT THAT TRANSLATION EXERCISE RESULTED IN.
THE CIP ITSELF IS COMPOSED OF THE ELEMENTS YOU SEE HERE ON THE SCREEN.
IT INCLUDES THE CAPITAL BUDGET RECOMMENDATIONS.
THOSE ARE THE FIRST YEAR RECOMMENDATIONS OF THE CIP, AND THAT IS THE ONLY YEAR THAT ACTUALLY RECEIVES FUNDING ALLOCATION.
THE PROJECTS SHOWN IN THE MULTI-YEAR VIEW ARE THERE FOR PLANNING PURPOSES, AND THEY ALLOW US TO FACTOR IN THINGS RELATED TO OUR MULTI-YEAR SUSTAINABILITY WHEN OUR CFO DOES HER PROJECTIONS EVERY YEAR.
THE MULTI-YEAR PLAN IS A CRITICAL ELEMENT OF THAT.
BUT CAPITAL PROJECTS AREN'T JUST ABOUT DELIVERING THE PROJECTS.
THEY ALSO HAVE AN OPERATING BUDGET IMPACT AT TIMES.
SO WE MAKE SURE TO EVALUATE PROJECTS TO ENSURE THAT WE KNOW WHAT THEIR IMPACT ON THE OPERATING SIDE OF THE HOUSE IS GOING TO BE.
THE CAPITAL BUDGET FOR 2026 IS SHOWN HERE ON THIS SLIDE AT A VERY HIGH LEVEL.
IT INCLUDES 27 PROJECTS PROGRAMMED ACROSS NINE FUNDING SOURCES THAT YOU SEE IN THE CHART ON THE SCREEN.
THE TOTAL FOR THOSE 27 PROJECTS IS JUST UNDER $37 MILLION.
AND ANOTHER WAY TO LOOK AT THAT $37 MILLION IS WITHIN
[00:25:02]
THE PROJECT CATEGORIES THAT YOU SEE HERE.SO ABOUT 15.6 MILLION HAS BEEN PROGRAMMED FOR MOBILITY PROJECTS, ROADWAYS, PATHWAYS, SIDEWALKS.
WATER AND WASTEWATER IS ABOUT 9.9 MILLION.
PARKS IS JUST UNDER 7 MILLION.
COMMUNITY ENHANCEMENTS ABOUT 243,000.
STORMWATER TOTALING A BIT OVER 3.6 MILLION.
AND FACILITIES PROJECTS FOR 500,000.
AND WE'LL GO THROUGH EACH OF THESE CATEGORIES OVER THE NEXT FEW SLIDES.
BEGINNING WITH MOBILITY, THE CAPITAL BUDGET INCLUDES, AS I MENTIONED, ABOUT $15.6 MILLION FOR THE EIGHT PROJECTS YOU SEE ON THIS SCREEN.
SOUTHLAKE'S ROADWAY NETWORK IS A VERY CRITICAL CAPITAL ASSET.
IT SUPPORTS BOTH LOCAL MOBILITY AND ALSO REGIONAL ACCESS.
AND BECAUSE OF THE SIZE AND AGE AND VALUE OF THE SYSTEM, PROACTIVE MAINTENANCE AND REINVESTMENT ARE ESSENTIAL.
THESE PROJECTS PROVIDE INVESTMENTS IN STREETS, TRAFFIC INFRASTRUCTURE, AND MOBILITY IMPROVEMENTS THAT SUPPORT SAFETY, CONNECTIVITY, THE LONG-TERM ASSET CONDITION.
MOVING ON TO WATER AND WASTEWATER, THE CAPITAL BUDGET INCLUDES NINE OF THESE PROJECTS.
PROJECTS REPRESENT ABOUT 9.9 MILLION IN PLANNED INVESTMENT.
AND THESE ARE PLANNED TO BE FUNDED ENTIRELY WITH CASH THROUGH THE UTILITY FUND.
THE FOCUS OF THIS PROGRAM IS RELIABILITY AND LONG-TERM SUSTAINABILITY.
THESE PROJECTS KEEP OUR WATER AND WASTEWATER SYSTEMS OPERATING SAFELY.
THEY ENSURE THAT WE MEET REGULATORY STANDARDS AND THEIR POSITION TO HELP US ENSURE THAT WE CONTINUE TO SERVE THE COMMUNITY BOTH TODAY AND IN THE FUTURE.
THE NEXT CATEGORY OF PROJECTS IS STORMWATER.
AND THIS CATEGORY OF PROJECTS INCLUDES THREE STORMWATER PROJECTS, TOTALING ABOUT 3.6 MILLION.
THESE PROJECTS ARE FUNDED THROUGH THE STORMWATER UTILITY WITH ABOUT A 50-50 COMBINATION PROPOSED FROM CASH FUNDING AND ALSO PLANNED DEBT.
THE FOCUS OF THIS PROGRAM IS RISK REDUCTION AND RESILIENCY.
THE PROJECTS SHOWN ARE TARGETED AT KNOWN DRAINAGE CHALLENGES AND AREAS WHERE WE CAN REDUCE FLOODING RISK, PROTECT PUBLIC INFRASTRUCTURE, AND IMPROVE SYSTEM PERFORMANCE.
THE PROJECTS THAT YOU SEE HERE IN THE CAPITAL BUDGET ARE DRIVEN BY DRAINAGE STUDIES, OBSERVED CONDITIONS, AND OTHER ONGOING MAINTENANCE AND INSPECTION EFFORTS.
MOVING ON TO PARKS, THE CAPITAL BUDGET INCLUDES JUST UNDER 7 MILLION IN CASH FUNDING FOR THE THREE PARK PROJECTS YOU SEE HERE, INCLUDING THE FINAL FUNDING NEEDED TO COMPLETE THE PURCHASE OF PROPERTY FROM CARROLL ISD.
THESE INVESTMENTS FOCUS ON RENEWING AND REINVESTING IN EXISTING ASSETS WHILE SELECTIVELY ADVANCING PLANNED IMPROVEMENTS ALIGNED WITH ADOPTED PARKS, FACILITIES, AND COMMUNITY USE PLANS.
NEXT CATEGORY IS COMMUNITY ENHANCEMENTS.
THESE PROJECTS SHAPE HOW SOUTHLAKE LOOKS, HOW IT FEELS, HOW IT FUNCTIONS AS A PLACE TO LIVE, WORK, AND VISIT.
THIS CATEGORY SUPPORTS THE PLANNING AND DESIGN AND CONSTRUCTION OF PUBLIC SPACES AND AMENITIES THAT ELEVATE THE CITY'S IDENTITY, IMPROVE ACCESSIBILITY, AND ENHANCE OVERALL COMMUNITY EXPERIENCE.
THEY INCLUDE ITEMS SUCH AS PUBLIC ART, STREETSCAPE AND MEDIA IMPROVEMENTS, AND GATEWAYS AND ENTRY FEATURES.
WHILE THEY MAY VARY IN SIZE AND LOCATION, TOGETHER THEY WORK TO INFLUENCE FIRST IMPRESSIONS, IMPROVE NAVIGATION, AND CREATE A WELCOMING CIVIC ENVIRONMENT THROUGHOUT THE CITY.
AND OUR FINAL CATEGORY IS COMMUNITY FACILITIES.
WE HAVE ONE PROJECT PROGRAMMED FOR FUNDING IN THIS CATEGORY.
SOUTHLAKE DOES MANAGE A VERY DIVERSE PORTFOLIO OF CITY FACILITIES, AND THE PROJECT SHOWN FOR FUNDING HERE IS SOME CASH FUNDING THAT WE ARE CONTINUING TO SET ASIDE TO SUPPORT THE DEVELOPMENT OF A VETERANS MEMORIAL AND A PUBLIC PARK ASSOCIATED WITH THE PARK PROJECT.
NOW I WILL TURN THINGS OVER TO OUR CHIEF FINANCIAL OFFICER, SHARON JACKSON.
THIS SLIDE SHOWS THE COMBINED 26 INVESTMENT ACROSS ALL THE CATEGORIES.
IT ALSO ILLUSTRATES HOW THE 26 COUPLE PROGRAM IS FUNDED, AND AT HIGH LEVEL, THE PROPOSED CFP REFLECTS A BALANCED APPROACH AND INCLUDES A MIX OF FUNDING SOURCES ACROSS ALL THE MAJOR CATEGORIES.
CONSISTING WITH COUNCIL ADOPTED FINANCIAL AND DEBT GUIDING PRINCIPLES, THE PROPOSED PROGRAM EMPHASIZES A STRONG PAY-AS-YOU-GO APPROACH WITH LIMITED STRATEGIC USE OF DEBT, AS IN PREVIOUS YEARS.
A KEY ELEMENT OF OUR STRATEGY IS DEBT RETIREMENT.
OVER THE COMING YEAR, THE CITY HAS SIGNIFICANT DEBT SCHEDULED TO ROLL OFF DUE TO THE PREVIOUSLY STRUCTURED SHORT AMORTIZATION PERIOD.
THIS CREATES ADDITIONAL CAPACITY FOR THE 26 ISSUANCE, RESULTING IN A NET IMPACT OF $5.2 MILLION.
THIS DISCIPLINED APPROACH ENSURES THAT DEBT REMAINS A STRATEGIC TOOL RATHER THAN A RISK TO THE LONG-TERM FINANCIAL SUSTAINABILITY.
LOOKING FORWARD WITH A MULTI-YEAR PERSPECTIVE, YOU CAN SEE THAT THE CITY'S PLAN REMAINS FAIRLY CONSISTENT OVER TIME, ENSURING THAT WE ARE TAKING A STRATEGIC AND FINANCIALLY RESPONSIBLE APPROACH TO MANAGING AND
[00:30:02]
BUILDING THESE IMPORTANT ASSETS.FUTURE INCREASES IN THE OUT-YEARS ARE REFLECTIVE OF LARGER FACILITY OR PARK PROJECTS CURRENTLY PROGRAMMED.
HOWEVER, WE DO EMPHASIZE THAT THIS PORTION OF THE PROPOSAL IS JUST FOR PLANNING PURPOSES AND ACTUAL FUNDING DECISIONS ARE DETERMINED ONCE CONCEPTUAL PLANS BECOME MORE FIRM, AS WELL AS BY ADJUSTMENTS MADE TO GUIDING POLICIES AND COMPREHENSIVE PLAN TOOLS.
THE PROPOSED CAPITAL BUDGET REFLECTS COUNCIL ADOPTED STRATEGY, COMPREHENSIVE PLANS, AND PREVIOUSLY ESTABLISHED PRIORITIES.
IT IS CONSISTENT WITH THE CITY'S FINANCIAL, DEBT, AND THE CIP GUIDING PRINCIPLES, INCLUDING PAY AS YOU GO AND DISCIPLINED STRATEGIC USE OF DEBT.
THE PROGRAM BALANCES NEAR-TERM INFRASTRUCTURE NEEDS WITH LONG-TERM SUSTAINABILITY, PRESERVING FLEXIBILITY, WHILE ALSO BEING RESPONSIBLE WITH SEWER, TAXPAYER, AND RATEPAYER RESOURCES.
BETWEEN NOW AND THE NEXT COUNCIL MEETING ON FEBRUARY 17TH, STAFF WILL INCORPORATE FEEDBACK FROM TONIGHT'S DISCUSSION AND PREPARE THE MATERIALS TO AUTHORIZE THE 26 CAPITAL, AUTHORIZE, MATERIALS TO AUTHORIZE THE 26 CAPITAL BUDGET AND APPROVE THE FULL MULTI-YEAR CFP PROJECT PLAN.
ADDITIONALLY, AT THE NEXT COUNCIL MEETING, YOU WILL SEE A COMPANION ITEM WITH THE ADOPTION, THE INITIAL STEP IN FUNDING PROCESS, THE FUNDING PROCESS RELATED TO THE DEBT, EXCUSE ME, AUTHORIZATION, AND WITH THAT, THE TEAM'S HERE AND AVAILABLE FOR ANY QUESTIONS, DISCUSSIONS, AND ANY FEEDBACK.
THANK YOU, SHARON, THANK YOU, ALLISON, GOOD PRESENTATION.
THIS YEAR, YOU KNOW, THERE'S A LOT TO DO.
SEEING HOW MANY PROJECTS, LIKE 27 PROJECTS, THAT'S, YOU KNOW, THAT'S A LOT TO DO, AND I THINK WE'RE AT THAT POINT AS WE CELEBRATE OUR 70TH BIRTHDAY THIS YEAR THAT THERE'S A LOT OF THESE WE NEED TO DO, THEY'RE NOT WANT TO DO TYPE OF THINGS, SOME OF THESE ARE ALREADY IN ACTION, LIKE THERE ARE A COUPLE OF SLIDES WITH PICTURES FROM CONTINENTAL AND UNION CHURCH IN DAVIS, AND THAT PROJECT SEEMS TO BE GOING REALLY FAST AT THIS NIGHT, SO I'M SURE IT'LL BE AHEAD OF SCHEDULE AND UNDER BUDGET, RIGHT? BUT, YOU KNOW, THIS IS, THIS IS A, THERE'S A LOT ON OUR PLATE, AND THEN WE PUT IN, YOU KNOW, A ONE-OFF WITH THE OLD DRAGON STADIUM ACQUISITION FROM CARROLL ISD THAT KIND OF SKEWS THE NUMBERS AS A ONE-OFF, BUT, YOU KNOW, THESE ARE SOME GOOD INVESTMENTS FOR THE FUTURE.
OUR RESIDENTS EXPECT CERTAIN THINGS AS FAR AS OUR MOBILITY AND OUR WATER, OUR STORMWATER, WASTEWATER, ALL THAT, AND SO WE HAVE TO GET AHEAD OF THOSE THINGS AS THE, YOU KNOW, SOME OF OUR THINGS, OUR INFRASTRUCTURE NEEDS ARE GETTING PRETTY CLOSE TO BEING CRITICAL, SO GOOD, GOOD PRESENTATION, GOOD THOUGHTS, AND I'LL OPEN UP TO COUNCIL FOR DISCUSSION OR ANY QUESTIONS OF ALLISON OR SHARON.
LOOKS LIKE IT WAS AN EASY ONE, SHARON.
ALLISON, DID YOU HAVE ANYTHING ELSE ON THIS ITEM? I KNOW WE'RE GOING TO SEE IT AGAIN IN TWO WEEKS, BUT ANYTHING ELSE FOR TONIGHT? NO, MAYOR.
NEXT, WE'LL GO TO WORK SESSION
[5. Discuss all items on tonight's agenda. No action will be taken and each item will be considered during the Regular Session.]
ITEM NUMBER FIVE, WHICH IS THE CONSENT AGENDA, AND I WILL TURN THAT OVER TO OUR DEPUTY MAYOR PRO TEM, KATHY CALLEY.I MOVE THAT WE PUT THE FOLLOWING ITEMS ON THE CONSENT AGENDA.
ITEM 4A, APPROVE THE MINUTES FROM THE JANUARY 20, 2026 REGULAR CITY COUNCIL MEETING.
ITEM 4B, CANCEL THE MARCH 17, 2026 REGULAR CITY COUNCIL MEETING DUE TO SPRING BREAK.
ITEM 4C, APPROVE RESOLUTION NUMBER 26-002, ORDERING A GENERAL ELECTION TO BE HELD ON MAY 2, 2026 FOR THE PURPOSE OF ELECTING CITY COUNCIL FOR PLACES ONE AND SIX.
ITEM 4D, APPROVE PURCHASE OF EQUIPMENT AND SERVICE FROM FORD AUDIO VIDEO SYSTEMS, LLC, IN AN AMOUNT NOT TO EXCEED $270,000.
ITEM 4E, APPROVE ORDINANCE NUMBER 1069A, FIRST READING, AMENDING CHAPTER FOUR OF THE SOUTH LAKE CITY CODE RELATING TO THE DEFINITION OF, QUOTE, DANGEROUS ANIMAL, UNQUOTE, TRAPPING OF ANIMALS AND ANIMALS IN PROTECTED CUSTODY.
ITEM 4F, APPROVE AN ENCROACHMENT AND JOINT USE AGREEMENT FOR THE PLACEMENT OF RETAINING WALLS WITHIN A DRAINAGE EASEMENT AND WATER AND SANITARY SEWER EASEMENT LOCATED IN THE BREMERTON EAST SUBDIVISION.
ITEM 4G, APPROVE AN ENCROACHMENT AND JOINT USE AGREEMENT FOR THE PLACEMENT OF RETAINING WALLS WITHIN A DRAINAGE AND UTILITY EASEMENT LOCATED IN THE MIRACLE POINT SUBDIVISION.
AND ITEM 4H, EXCUSE THE ABSENCE OF COUNCIL MEMBER RANDY ROBBINS FROM THE FEBRUARY 3, 2026 REGULAR CITY COUNCIL MEETING.
ALL RIGHT, THAT'S THE CONSENT AGENDA.
LOOKING AT THE OTHER ITEMS ON THE REGULAR AGENDA, THE ITEM 7A, THE JAMES PLACE DEVELOPMENT, 7D, THE WHITE CHAPEL METHODIST CHURCH EXPANSION, 9A, TOMMY'S CAR WASH SIGN PACKAGE, AND 9B, WORLD CLASS GARAGES SIGN PACKAGE.
I THINK THOSE PROBABLY JUST NEED TO STAY ON THE REGULAR AGENDA FOR TONIGHT.
WE'LL TAKE THEM IN DUE COURSE, BUT ANY DISCUSSION OR ANY PRESENTATIONS OR ANY QUESTIONS FOR STAFF ON ANYTHING ON THE CONSENT AGENDA? ALL RIGHT, SEEING NONE,
[00:35:01]
WE'LL TAKE THOSE UP DURING THE REGULAR SESSION.THANK YOU, DEPUTY MEMBER KIM TALLEY.
[1. Call to order.]
NEXT UP, I'LL CALL OUR REGULAR SESSION TO ORDER, AND THE FIRST ITEM OF BUSINESS IN THE REGULAR SESSION IS[2.A. Executive Session]
TO GO INTO EXECUTIVE SESSION.AS MAYOR, I HEREBY ADVISE YOU THAT WE'RE GOING TO EXECUTIVE SESSION PURSUANT TO THE TEXAS GOVERNMENT CODE, SECTION 551.071 TO SEEK LEGAL ADVICE FROM OUR CITY ATTORNEY, AND SECTION 551.087 TO DELIBERATE REGARDING ECONOMIC DEVELOPMENT NEGOTIATIONS, AND I'LL CHECK WITH OUR CITY MANAGER ON WHAT TIME WE'LL BE BACK.
ABOUT AN HOUR OR SO SHORTLY AFTER 7, WE'LL SEE YOU THEN.
ALL RIGHT, I'LL CALL OUR MEETING BACK TO ORDER AT 7, 17.
IS THERE ANY ACTION NECESSARY FOLLOWING EXECUTIVE SESSION? NO, MAYOR.
NEXT UP IS ITEM 3A, THE MAYOR'S REPORT.
I DON'T HAVE ANYTHING SCHEDULED BECAUSE OUR CITY MANAGER IS GOING TO SPEAK TO THE RECENT WINTER WEATHER RESPONSE HERE IN SOUTH LAKE CITY.
CITY MANAGER'S REPORT, ITEM 3D.
YES, THANK YOU, MAYOR, MEMBERS
[2.B. Reconvene]
OF THE CITY COUNCIL.I COULD NOT LET THIS OPPORTUNITY PASS TO TALK ABOUT HOW THE TEAM PERFORMED DURING THIS RECENT WINTER WEATHER EVENT.
AND, YOU KNOW, OUR PERFORMANCE STARTS BEFORE THE WEATHER EVEN GETS HERE.
OUR TEAMS, YOU KNOW, ACTIVATE.
[3.B. City Manager’s Report]
KENNEDY AND OUR EMERGENCY OPERATIONS TEAM, SHE BEGINS HOLDING BRIEFINGS WITH THE NATIONAL WEATHER SERVICE TO GIVE US THE INFORMATION THAT WE NEED TO START PLANNING EARLY.DEPARTMENTS GET TOGETHER AND ACTIVATE THEIR WINTER WEATHER READINESS PLANS, IDENTIFY WHAT CRITICAL SERVICES ARE NEEDED.
SO THIS EARLY SITUATIONAL AWARENESS IS SO CRITICAL AND REALLY SET THE TONE FOR EVERYTHING WE DO GOING FORWARD.
AND REALLY WE BEGIN BY FOCUSING ON THE PEOPLE.
WE FINALIZE OVERNIGHT STAFFING PLANS TO MAKE SURE THAT WE HAVE ALL OF OUR CRITICAL PERSONNEL LOCAL AND READY TO RESPOND THROUGHOUT THE EVENT.
IT'S NOT JUST FOR CONTINUITY OF SERVICE, BUT IT'S ALSO IMPORTANT FOR EMPLOYEE SAFETY.
OUR EMPLOYEES COMMUTE, AND SO HAVING THEM HERE MAKES SURE THAT THEY CAN RESPOND SAFELY.
AND AT THE SAME TIME, WHILE WE'RE DOING ALL OF THAT, OTHER MEMBERS OF THE TEAM ARE ALSO WINTERIZING FACILITIES.
WE'RE MAKING SURE THAT OUR FUEL STATION IS TOPPED OFF AND READY TO GO.
SAFETY GEAR IS DISTRIBUTED, AND ALL THIS WORK HAPPENED BEFORE, YOU KNOW, CONDITIONS EVEN CHANGED WHEN THE SUN WAS STILL HIGH IN THE AIR AND IT WAS VERY WARM.
THEN WE MOVE INTO THE EVENT, AND ONCE FREEZING CONDITIONS BEGIN, OUR FOCUS REALLY SHIFTS FROM PREPARATION TO RESPONSE.
WE ALL SAW THE TRANSITION, YOU KNOW, TO SLEET AND ICE, AND OUR CITY TEAMS MOVE INTO CONTINUOUS OPERATIONS MODE.
BECAUSE ALL OF THE PLANNING THAT I MENTIONED HAD ALREADY TAKEN PLACE, THE TRANSITION WAS SEAMLESS.
IT WASN'T REACTIVE, AND THIS IS WHERE OUR PREPARATION REALLY PAID OFF.
WE WERE ABLE TO RESPOND SAFELY AND STRATEGICALLY RATHER THAN UNDER PRESSURE, AND I'VE GOT TO TELL YOU, I LOVE THIS PHOTOGRAPH ON THE TOP RIGHT-HAND SIDE OF THE SCREEN WITH THE ROAD CREWS OUT TREATING.
I THINK THAT'S WHITECHAPEL, IF I REMEMBER CORRECTLY.
YOU CAN SEE THEY'RE KIND OF ALL FOLLOWING IN A LINE TO GET THE ROAD CLEARED AS QUICKLY AS POSSIBLE.
AND OUR PEOPLE WORKED AROUND THE CLOCK, MAKING REPEATED PASSES ON PRIORITY ROADWAYS, BRIDGES, ROUNDABOUTS, MAKING SURE EMERGENCY ROUTES WERE CLEARED AND SAFE FOR PASSAGE AS CONDITIONS EVOLVED.
WE HAD TO ADJUST TREATMENT STRATEGIES IN REAL TIME BASED ON TEMPERATURE AND PRECIPITATION TYPE.
IT'S CONTINUOUS MONITORING AND ADJUSTMENT THROUGHOUT THE EVENT, AND THIS SUSTAINED LEVEL OF EFFORT IS WHAT ALLOWED US TO STAY AHEAD OF THE WEATHER AND KEEP THOSE ROUTES AS SAFE AS POSSIBLE DURING VERY CHALLENGING CONDITIONS.
THIS IS REALLY AND TRULY ONE OF THOSE MOMENTS WHERE YOU GET TO SEE THE CITY VALUE OF TEAMWORK AND ACTION.
IT WAS A COORDINATED, ENTERPRISE-WIDE RESPONSE.
OUR PUBLIC SAFETY TEAMS REMAINED FULLY OPERATIONAL, HELPING WITH TRAFFIC ISSUES, ASSISTING MOTORISTS, MONITORING CONDITIONS ACROSS THE CITY, ALL WHILE COORDINATING CLOSELY WITH PUBLIC WORKS, COMMUNITY SERVICES, AND EMERGENCY MANAGEMENT.
WE ALSO DEPLOYED STAFF TO ALL OF OUR CRITICAL INFRASTRUCTURE LOCATIONS THROUGHOUT THE EVENT, MONITORING LIFT STATIONS.
PUMP STATIONS, WATER TOWERS, OTHER CRITICAL FACILITIES TO PREVENT SERVICE DISRUPTIONS.
WE ALSO HAD OUR EMERGENCY OPERATIONS CENTER ACTIVE THROUGHOUT THE EVENT.
I THINK IT WAS ALMOST 70 HOURS OF ACTIVATION FOR THAT CENTER.
AND AT THE SAME TIME, COMMUNICATION WAS ALWAYS TOP OF MIND.
OUR TEAM PROVIDED REGULAR UPDATES.
I THINK THEY PROVIDED ALMOST 80 UPDATES ACROSS OUR CHANNELS THROUGHOUT THE EVENT.
CLEAR AND CONSISTENT COMMUNICATION HELPED RESIDENTS UNDERSTAND, YOU KNOW, CONDITIONS, MAKE INFORMED DECISIONS IF THEY DID NEED
[00:40:01]
TO VENTURE OUT.AND JUST TO PUT IT INTO PERSPECTIVE, HERE'S A LITTLE BIT OF NUMBERS THAT HELPS YOU UNDERSTAND, YOU KNOW, THE BREADTH OF THE RESPONSE HERE.
OVER 8,000 GALLONS OF BRINE APPLIED TO CITY ROADWAYS, CITYWIDE.
ABOUT 130 SERVICE CALLS FOR PUBLIC SAFETY, WEATHER-RELATED CALLS.
05,000 HOURS OF STAFF HOURS WORKED.
AND EIGHT DAYS OF CONSECUTIVE OEM MONITORING.
ONE OF THE OTHER THINGS THAT WE DO IS WE ALWAYS MAKE CALLS TO OUR SENIORS IN THE COMMUNITY.
AND SO THE COMMUNITY SERVICES TEAM MADE OVER 1,000 CALLS TO OUR SENIORS JUST TO MAKE SURE THAT THEY WERE SAFE, THEY DIDN'T NEED ANYTHING, AND THAT THEY WERE BEING CHECKED ON.
AND THEN AGAIN, THERE'S THOSE STATS RELATED TO OUR COMMUNICATION.
SO TAKEN TOGETHER, THIS RESPONSE REALLY SHOWS WHO WE ARE.
THE SOUTHLAKE TEAM COMES TOGETHER, PRIORITIZES SAFETY.
IT DEMONSTRATES OUR ABILITY TO PLAN AHEAD, WORK ACROSS DEPARTMENTS DELIBERATELY, AND REINFORCES OUR VALUE OF PREPAREDNESS AND THE STRENGTH OF OUR TEAMS. I COULD NOT BE MORE PROUD.
THE SOUTHLAKE TEAM, DURING THIS EVENT, THEY JUST CONTINUE TO, YOU KNOW, EXCEED EXPECTATIONS AT EVERY TURN.
I THINK THAT LAST SLIDE SAYS IT ALL.
THANK YOU TO ALLISON, TO ALL THE DEPARTMENT DIRECTORS, EVERYONE, BOOTS ON THE GROUND, WHO WORKED ALL THROUGH THE WEEKEND AND INTO THE NEXT WEEK.
I KNOW THE PLANNING STARTED THE WEEKEND BEFORE THE BAD WEATHER ARRIVED ON THAT FRIDAY NIGHT.
BUT THE PLANNING FOR THIS STARTED THE WEEKEND BEFORE.
AND ALL THAT, YOU CAN NEVER BE OVER-PREPARED.
AND I THINK THAT SHOWED THAT, YOU KNOW, SHOUT OUT TO EVERYONE WHO REALLY DID EVERYTHING ABOVE AND BEYOND WHAT, YOU KNOW, THEIR JOB CALLS FOR.
AND I ALSO WANT TO GIVE A SHOUT OUT TO, YOU KNOW, WE HAD A LOT OF COMMUNITY COOPERATION, A LOT OF COMMUNITY INVOLVEMENT.
WE HAD THE DELTA HOTEL AND WESTIN HOTEL OFFERED UP ROOMS TO OUR EMPLOYEES WHO WERE GOING TO STAY IN SOUTHLAKE AND NOT LEAVE THE CITY WHEN THEIR SHIFT WAS DONE.
AND THOSE ROOMS WERE ALSO GOING TO BE AVAILABLE TO RESIDENTS.
IF WE HAD A WIDESPREAD POWER OUTAGE OR, GOD FORBID, WATER PROBLEM LIKE 2021.
SO THANK YOU TO THOSE HOTELS FOR HELPING OUT.
WE HAD FREE FOOD FOR OUR FOLKS FROM ARMIN'S PIZZA AND PASTA AND STEAK STORE BARBECUE.
AND THEN AGAIN, YOU MADE THE POINT, ALLISON, ABOUT COMMUNICATIONS.
KALARI AND YOUR TEAM WORKING, YOU KNOW, 24-7 THROUGHOUT THOSE DAYS ON THE COMMUNICATIONS, EVERYTHING FROM UPDATES ON ROAD CONDITIONS TO, HEY, WHEN IS MY GARBAGE GOING TO GET PICKED UP? SO THOSE ARE CRITICAL THINGS IN THOSE DIFFICULT TIMES.
BUT AGAIN, I ECHO WHAT YOU SAID ABOUT BEING PROUD OF THE TEAM AND PROUD OF THE CITY'S RESPONSE.
AND I'M THANKFUL THAT, YOU KNOW, OUR RESIDENTS APPRECIATED OUR EFFORTS.
AND, YOU KNOW, WE GOT THROUGH IT.
AND HOPEFULLY THAT'S IT FOR WINTER OF 2026.
SO COUNCIL, ANY OTHER QUESTIONS OR COMMENTS ABOUT LAST WEEK? GO AHEAD, FRANCES.
I HATCH OFF TO THE CITY STAFF WHO STAYED HERE BECAUSE IT WAS SNOWING EVERYWHERE IN NORTH TEXAS.
SO THAT MEANS THEIR FAMILY, THEY DID NOT GO HOME TO THEIR FAMILIES.
SO CAN'T APPRECIATE THAT KIND OF ACTION MORE AND HATCH OFF TO THEM.
YEAH, I WAS JUST GOING TO ADD, ECHOING COUNCIL MEMBER CHARLEY AND THE MAYOR'S COMMENTS.
BUT YEAH, YOU KNOW, YOU SEE IT EVERY TIME.
I MEAN, YOU GUYS NEVER LET US DOWN, ALLISON, THE STAFF, YOUR STAFF, BUT THEN THE BOOTS ON THE GROUND, PUBLIC WORKS, OUR FIRST RESPONDERS, YOU KNOW, POLICE AND FIRE.
BUT WHAT I LOVE ABOUT OUR CITY AND OUR EMPLOYEES IS THAT NOBODY SAYS, WELL, THAT'S NOT MY LANE, THAT'S NOT MY ROLE.
YOU SEE EVERYBODY OUT THERE JUST DOING IT.
AND I KNOW THIS SEEMS OBVIOUS, BUT IT'S NOT LOST ON ME THAT, YOU KNOW, IF YOU STEPPED OUTSIDE JUST FOR A MINUTE JUST TO SEE THE CONDITIONS OR LET A PET OUT FOR A MOMENT OR WHATEVER, I MEAN, IT'S ALMOST UNTENABLE BEING OUT IN THOSE CONDITIONS.
AND WE HAD PEOPLE OUT THERE CLEARING ROADS AND RESPONDING TO EMERGENCY CALLS.
AND THAT'S REALLY WHAT MAKES IT SOUND LIKE WHO WE ARE.
ANYTHING ELSE, ALLISON, ON YOUR CITY MANAGER'S REPORT? ALL RIGHT, THANK YOU.
NEXT, WE'LL GO BACK TO THE CONSENT AGENDA.
WE REVIEWED THE CONSENT AGENDA ITEMS DURING OUR WORK SESSION.
IS THERE ANY FURTHER DISCUSSION FROM COUNCIL OR ANY QUESTIONS OR PRESENTATIONS NEEDED ON THE CONSENT AGENDA ITEMS? ALL RIGHT, WITH THAT, WE WILL TAKE A MOTION FROM DEPUTY MAYOR PRO TEM, KATHY TALLEY, ON THE CONSENT AGENDA.
[CONSENT AGENDA]
THANK YOU, MAYOR.YES, MAYOR AND COUNCIL, I MOVE THAT WE VOTE TO APPROVE THE CONSENT AGENDA ITEMS 4A THROUGH 4H.
DO WE HAVE A MOTION? DO WE HAVE A SECOND? SECOND.
[00:45:04]
WAITING, WAITING, WAITING.WE JUST HAVE A LITTLE TECHNICAL DELAY HERE.
THAT MOTION CARRIES 6-0, AND THE CONSENT AGENDA IS APPROVED.
NEXT UP IS ITEM NUMBER 5, THE PUBLIC FORUM.
PUBLIC FORUM ALLOWS MEMBERS OF THE PUBLIC TO BRING FORWARD ITEMS THAT ARE NOT ON OUR REGULAR AGENDA TONIGHT.
IS, I'LL GO AHEAD AND OPEN THE PUBLIC FORUM.
IS THERE ANYONE HERE WHO WISHES TO SPEAK DURING OUR PUBLIC FORUM ON AN ITEM THAT'S NOT ON OUR AGENDA TONIGHT? NOBODY? ALL RIGHT, WE'LL CLOSE THE PUBLIC FORUM.
NEXT UP, WE'LL GET INTO OUR REGULAR AGENDA ITEMS. WE'RE GOING TO GO A LITTLE BIT OUT OF ORDER.
WE'RE GOING TO START OFF WITH ITEM 7B, THE WHITECHAPEL METHODIST CHURCH ITEM.
THEN WE'LL TAKE 9A, THE TOMMY'S CAR WASH SIGNS, 9B, THE WORLD CLASS GARAGES SIGNS, AND THEN WE'LL COME BACK TO 7A, THE JAMES PLACE ITEM, WHICH I THINK THESE FIRST THREE WILL TAKE A MINIMAL AMOUNT
[7.B. Ordinance No. 480-841, ZA25-0075, 1st Reading, Zoning Change and Concept/Site Plan for White Chapel Methodist Church, on property described as Lot 1R, Block 1, White Chapel Methodist Church Addition, and located at 185 S. White Chapel Blvd. Current Zoning: “CS” Community Service District. Requested Zoning: “S-P-2” Generalized Site Plan District. SPIN Neighborhood #9.]
OF TIME, AND THEN WE'LL GET TO 7A.THANK YOU, MAYOR AND CITY COUNCIL.
ITEM 7B IS A REQUEST TO CHANGE ZONING OF WHITECHAPEL METHODIST CHURCH PROPERTY AND RECEIVE CONCEPT AND SITE PLAN APPROVAL FOR SOME EXPANSION ON THE CAMPUS SITE.
THE PROPERTY IS LOCATED AT 185 SOUTH WHITECHAPEL BOULEVARD, AND THE REQUEST FOR THE ZONING CHANGE IS TO GO FROM CS COMMUNITY SERVICE DISTRICT TO SB2 GENERALIZED SITE PLAN DISTRICT.
THIS IS AN AERIAL VIEW OF THE SITE.
THE PROPERTY UNDER THE LAND USE PLAN IS DESIGNATED AS PUBLIC, SEMI-PUBLIC, AND AS MENTIONED, CURRENT ZONING IS CS COMMUNITY SERVICE DISTRICT.
THIS IS A VIEW OF THE CAMPUS FROM WHITECHAPEL AND A VIEW OF THE ENTRY EXIT ON SOUTH LAKE BOULEVARD.
AND THIS IS A VIEW LOOKING IN A NORTHWESTERLY DIRECTION FROM THE INTERIOR OF THE CAMPUS.
AND THIS IS A VIEW OF THE EAST SIDE OF THE CHAPEL AND SOME ADDITIONAL INTERIOR CAMPUS SHOTS.
THE EXISTING SITE PLAN IS SHOWN HERE.
THE PRIMARY REASON FOR THE ZONING CHANGE IS TO ADDRESS BUILDING HEIGHT, BOTH EXISTING ON THE SITE AS WELL AS PROPOSED BUILDING HEIGHT WITH NEW ADDITIONS BEING MADE.
THESE ARE THE TWO AREAS THE ADDITIONS ARE PROPOSED.
THE ADDITION INCLUDES A NEW YOUTH ACTIVITY CENTER AND THEN ADDITION OF A THIRD FLOOR ABOVE THE SECOND STORY OF THE EXISTING CLASSROOM BUILDING.
THIS STRUCTURE WAS BUILT TO SUPPORT A THIRD FLOOR AND THE CURRENT ZONING UNDER REGULATIONS UNDER THE CS DISTRICT LIMIT BUILDING HEIGHT TO 35 FEET IN HEIGHT AS WELL AS NO MORE THAN TWO AND A HALF STORIES.
THIRD STORY AS WELL AS THE HEIGHT OF THE BUILDINGS WILL EXCEED THOSE OF THE CS DISTRICT.
IT MIGHT BE MENTIONED THAT THE CHAPEL SITE OR CHAPEL BUILDING RECEIVED A VARIANCE IN EARLY 2000 THROUGH THE BOARD OF ADJUSTMENT FOR THE STEEPLE HEIGHT AS WELL AS THE BUILDING HEIGHT.
THIS WOULD COVER ALL BUILDINGS AND THE PROPOSED STRUCTURES FROM A HEIGHT REGULATION STANDPOINT IF THE SB2 ZONING IS APPROVED AS BEING PROPOSED.
IT INCLUDES SOME ADDITIONAL PARKING ON THE SITE BASED ON PARKING REQUIREMENTS AND SEATING CAPACITY OF THE FACILITY.
IT WILL REMAIN CONFORMING WITH PARKING AND WITH THE ADDITION OF PARKING BRING THAT UP TO 01,154 SPACES.
THIS IS THE EXISTING TREE PLAN.
THERE ARE A FEW TREES THAT WILL NEED TO BE REMOVED WITH THE YOUTH BUILDING ADDITION AS WELL AS SOME OF THE PARKING IMPROVEMENT.
ADDITIONALLY, WITH THE FOUNDRY EXPANSION ON THE EAST SIDE OF THE CHAPEL BUILDING, IT WILL REQUIRE RELOCATION OF
[00:50:01]
AN EXISTING WATER LINE THAT LOOPS THE BUILDING.THIS IS GRADING PLAN, DRAINAGE PLAN, AND LANDSCAPE PLAN.
AND RENDERINGS OF THE PROPOSED BUILDINGS.
THIS IS THE YOUTH CENTER AND THE EDUCATION BUILDING.
ELEVATION OF THE YOUTH ACTIVITY BUILDING.
ELEVATION OF THE EDUCATION BUILDING.
AND RENDERING OF THE FOUNDRY ADDITION ON THE EAST SIDE OF THE CHAPEL BUILDING.
ALL ADDITIONS WILL CONFORM WITH THE ESTABLISHED ARCHITECTURE ON THE SITE.
NOTIFICATIONS WERE SENT TO PROPERTY OWNERS WITHIN 300 FEET OF THE PROPERTY AND WE HAVE NOT RECEIVED ANY RESPONSES REGARDING THIS REQUEST.
PLANNING AND ZONING COMMISSION APPROVED THAT ON 6-0 AT THEIR JANUARY 8TH MEETING.
AND WITH THAT I'LL BE GLAD TO ANSWER ANY QUESTIONS.
ANY QUESTIONS FOR DENNIS? I DO HAVE ONE QUICK QUESTION DENNIS.
ONCE THIS IS COMPLETED, WILL PARKING STILL BE ADEQUATE WITHIN THE BUILDING? YES.
ANYTHING ELSE AT THIS TIME? THANK YOU DENNIS.
IS THE APPLICANT HERE? COME ON DOWN.
AND YOU'VE BEEN HERE BEFORE, BUT IF YOU COULD SAY YOUR NAME FOR THE RECORD.
1921 STATE HIGHWAY 21, LOUISVILLE.
IT'S, I THINK IT'S PRETTY CLEAR CUT WHAT WE'RE TRYING TO DO HERE, SO.
ANY QUESTIONS FOR THE APPLICANT? NOTHING ELSE TO ADD? NO.
THIS IS A FIRST READING SO IT DOES NOT REQUIRE A PUBLIC HEARING, BUT I'LL GO AHEAD AND OPEN A PUBLIC HEARING ON ITEM 7B.
IS THERE ANYONE HERE WHO WISHES TO SPEAK REGARDING ITEM 7B, THE WHITE CHAPEL METHODIST CHURCH EXPANSION? SEEING NONE, I'LL CLOSE THE PUBLIC HEARING.
ALSO NOTE FOR THE RECORD THAT 64 PUBLIC HEARING NOTIFICATIONS WERE SENT TO PROPERTY OWNERS WITHIN 300 FEET OF THE SUBJECT PROPERTY.
AND AS OF TODAY, NO RESPONSES HAVE BEEN RECEIVED AND WE'LL MAKE THAT PART OF THE RECORD.
COUNCIL, ANY FURTHER DISCUSSION ON THIS ONE? ALL RIGHT.
I THINK WE'RE READY FOR A MOTION.
I MOVE THAT WE APPROVE ITEM 7B, ORDERS NUMBER 480-841-Z825-0075, FIRST READING ZONING CHANGE AND CONCEPT SITE PLAN FOR WHITE CHAPEL METHODIST CHURCH, ON PROPERTY DESCRIBED AS LOT 1R, BLOCK 1, WHITE CHAPEL METHODIST CHURCH ADDITION AND LOCATED AT 185 SOUTH WHITE CHAPEL BOULEVARD, SUBJECT TO THE STAFF REPORT DATED JANUARY 26TH, 2026, AND THE SITE PLAN REVIEW SUMMARY NUMBER 02, DATED JANUARY 2ND, 2026, NOTING THAT WE'D BE APPROVING ZONING CHANGE AND CONCEPT PLAN AS PRESENTED FOR CONSTRUCTION OF A NEW YOUTH ACTIVITY CENTER, EXPANSION OF EDUCATION BUILDING B, AND NEW FOUNDRY ADDITION TO THE EXISTING WORSHIP CENTER.
ITEM 7B IS APPROVED ON FIRST READING.
NEXT WE'LL GO TO ITEM 9A, IT'S CASE NUMBER SV25-0013, SIGN VARIANCE FOR TOMMY'S EXPRESS CAR WASH, LOCATED AT 3230 WEST SOUTH LAKE BOULEVARD.
THANK YOU, MAYOR, CITY COUNCIL.
THIS IS A PROPOSAL OR A REQUEST FOR VARIANCE TO ALLOW NINE ADDITIONAL SIGNS ON THE TOMMY'S CAR WASH SIDE
[9.A. SV25-0013, Sign Variance for Tommy’s Express Car Wash, located at 3230 W. Southlake Boulevard.]
ON THE WEST SIDE OF WEST SOUTH LAKE BOULEVARD.THIS IS A PHOTOGRAPH OF THE TOMMY'S CAR WASH SITE.
THE PROPOSAL INCLUDES FIVE BLUE, WHAT ARE CALLED SNAP SIGNS THAT WOULD SNAP INTO METAL STRUCTURES THAT WOULD ALLOW THEM TO CHANGE COPY.
THOSE FIVE SIGNS ARE SHOWN IN BLUE HERE.
IT ALSO INCLUDES TWO PURPLE SNAP SIGNS AT THE ENTRY THAT PROVIDE MESSAGING TO DRIVERS AS
[00:55:01]
THEY ENTER THE FACILITY, AND THEN AN IDENTIFICATION SIGN OVER THE, IDENTIFYING WHERE THE FREE MAT WASHER IS NEAR THE VACUUM STATIONS ON THE WEST SIDE OF THE BUILDING, AS SHOWN IN TAN, AND THEN A DIRECTIONAL SIGN SHOWN IN LIGHT GREEN.HERE'S SOME ARROWS DESCRIBING EACH OF THOSE SIGNS, AND HERE'S A WALKTHROUGH OF THOSE SIGN TYPES.
THESE STRUCTURES HAVE ALREADY BEEN INSTALLED.
THE NAPKIN IS NOT UTILIZING THEM FOR ANY SIGNS UNTIL RECEIVING APPROVAL HERE, BUT THESE ARE THE FIVE SNAP SIGNS ON THE PERIMETER OF THE BUILDING.
THEY INTEND TO USE THOSE FOR MENU BOARD AS WELL AS PROMOTIONAL PROGRAMS THAT THEY HAVE FROM TIME TO TIME, AND THEN SOME MORE INFORMATIONAL AND PROGRAM SIGNAGE.
THESE ARE SNAP SIGNS AT THE CANOPY DRIVE-THROUGH AND WHERE THE PAYMENT STATIONS ARE.
ONCE AGAIN, INFORMATIONAL MESSAGES THAT MAY REQUIRE CHANGE FROM TIME TO TIME.
AND THIS IS THE SIGNAGE OVER THE WASH AREA FOR FLOOR MATS.
AND THIS IS THE DIRECTIONAL SIGN.
THE NAPKIN HAD PREVIOUSLY INCLUDED SOME ACCENT LIGHTING ON THE PERIMETER OF THE BUILDING.
THAT PLANNING WAS ON THE COMMISSION.
THIS IS THE ONLY SIGNAGE BEFORE WE RECEIVE SOME ADDITIONAL VIEWS OF THE CAR WASH.
SIGN BOARD APPROVED THE ITEM 5-1, NOTING THAT THEY WOULD REMOVE THE ACCENT LIGHTING ON THE BUILDING.
I'LL BE GLAD TO ANSWER ANY QUESTIONS THAT YOU MAY HAVE.
ANY QUESTIONS FOR DENNIS AT THIS POINT? I HAVE ONE.
DENNIS, CAN YOU GO BACK TO THE SIGNS THAT SHOW YOU ENTERING, THE INNER SIGNS THAT THEY HAVE? GO BACK, GO BACK.
THE DIRECTIONAL SIGNAGE? YES, THE DIRECTIONAL.
CAN YOU TELL ME HOW DIFFERENT THAT IS THAN THE MENU SIGN THAT WE'VE BEEN DEALING WITH WITH BURGER KING WHERE WE'RE REQUIRING THAT IT MATCH THE BUILDING MATERIALS THAT GO AROUND IT? IS, HOW DIFFERENT IS THAT? I MEAN, WE'RE NOT ALLOWING.
THIS IS, I BELIEVE, A METAL OR COMPOSITE FABRICATION VERSUS A CLAD AND MASONRY SIGN WHICH IS TYPICALLY REQUIRED FOR DIRECTIONAL SIGNS VISIBLE FROM THE RIGHT OF WAY.
ANY OTHER QUESTIONS FOR DENNIS? ALL RIGHT.
IS THE APPLICANT HERE? APPLICANT HERE FOR TOMMY'S CAR WASH.
YOU'VE BEEN HERE BEFORE, BUT IF YOU COULD STATE YOUR NAME AND ADDRESS FOR THE RECORD, THEN GO AHEAD.
YEP. MY NAME IS MIKE ROSEBERRY.
ADDRESS IS 8505 CLAY HIBBINS ROAD IN KELLER.
YEAH. WE'RE JUST TRYING TO RUN, YOU KNOW, A LOCALLY OWNED BUSINESS HERE, AND ALL THESE SIGNS ARE PRETTY IMPORTANT FOR OUR BUSINESS AND DEFINITELY IMPORTANT FOR SAFETY AND EVEN YOU MENTIONED THE ENTER SIGN, SOMETHING LIKE THAT.
WE'RE CONNECTED RIGHT NEXT TO THE WATER TOWER, SO I CAN'T TELL YOU HOW MANY PEOPLE.
I HAVE NO IDEA WHERE TO ENTER, SO WE'RE JUST, IT'S JUST, WHEN YOU'RE DEALING WITH THE MASSES AND THERE'S HUNDREDS OF PEOPLE COMING THROUGH, SIMPLE SIGNS LIKE THAT REALLY ACTUALLY MAKE A DIFFERENCE.
WAS THE QUESTION, THOUGH, MORE ABOUT THE MATERIALS, LIKE HAVE IT MASONRY TO MATCH UP TO THE BUILDING? IT'S NOT WHETHER OR NOT THEY'RE NEEDED, BECAUSE I'M ONE OF THOSE PEOPLE THAT PROBABLY WOULDN'T NEED ONE, BUT IT'S WHAT WE REQUIRE FOR OTHER BUSINESSES IN THE CITY, AND WE'RE ACTUALLY DEALING WITH A CASE LIKE RIGHT NOW
[01:00:01]
WITH ONE LIKE THAT.THE OTHER QUESTION I HAVE FOR YOU ON THOSE SNAP SIGNS, IS THERE ANY WAY OF CONSOLIDATING THE, I MEAN, YOUR ADS OF WHAT YOU HAVE GOING ON AND YOUR SPECIALS, IS THERE ANY WAY OF CONSOLIDATING MAYBE HAVING ONE WHERE YOU CAN PUT ALL THE SPECIALS ON ONE INSTEAD OF HAVING TO HAVE THREE? YEAH. SO THAT'S MY QUESTION.
IT JUST SEEMS LIKE A LOT OF STUFF, AND I KNOW I WATCHED THE PLANNING AND ZONING MEETING WHERE YOU PRESENTED AT THE SIGN BOARD MEETING, AND I UNDERSTAND THAT YOU WANT TO MAKE YOUR BUSINESS, YOU KNOW, PROFITABLE, AND YOU WANT PEOPLE TO KNOW EVERYTHING THAT'S GOING ON, BUT AT THE SAME TIME, IS THERE A COMPROMISE WHERE YOU DON'T HAVE TO HAVE SO MUCH STUFF EVERYWHERE, WHERE YOU COULD CONSOLIDATE WHATEVER MESSAGES YOU'RE PUTTING ON MAYBE ONE OF THOSE INSTEAD OF THREE OF THEM? YEAH. I MEAN, I'M A BIG FAN OF SIMPLICITY.
THERE'S, WE, I OFFER MILITARY VERSUS WATER DISCOUNTS.
WE DO A WATER MISSION DEAL WHERE WE GIVE, YOU KNOW, EVERY PROCEED GOES BACK TO A WATER MISSION WE'RE DOING.
RIGHT NOW, MY MENU SIGN, BECAUSE THESE WEREN'T APPROVED, MY MENU IS LITERALLY THREE ON TAPE TO THE BRICK.
SO WE HAD TO CREATE OUR OWN SIGN VERSUS IT WOULD BE IN THAT FIRST PLACEMENT THERE.
SO, AND THERE'S THREE OF THEM, AND IT'S SET, THE BUILDING'S ALREADY SET BACK PRETTY FAR ON 1709, THAT YOU REALLY WANT TO SEE THESE FROM 1709.
SO IT'S REALLY, IT WOULD ONLY BE INFORMATIONAL FOR EVERYONE JUST COMING IN ALREADY TO THE CAR WASH, SO IF ANYTHING, IT'S JUST, IT'S, IT'S JUST A GOOD, YOU KNOW, THAT THEY CAN AT LEAST KNOW WHAT THEIR OPTIONS ARE AND WHAT WE SUPPORT AND EVERYTHING.
ANY OTHER QUESTIONS FOR THE APPLICANT? ON THE DIRECTIONAL SIGN THAT WE STARTED OFF WITH, THE ENTER, HAVE YOU ALREADY BOUGHT THAT SIGN, OR IS THERE A WAY TO DO THAT? NO, THAT, UNFORTUNATELY, IT'S A SUPER EXPENSIVE SIGN, SO I'M GOING TO HOLD OFF ON ORDERING THAT THING UNTIL IT GETS APPROVED.
BECAUSE I THINK THAT THE QUESTION FROM COUNCIL MEMBER SHIRLEY WAS, YOU KNOW, WE TYPICALLY REQUIRE IT BE ON A MASONRY STRUCTURE OR SURROUNDED WITH MASONRY AROUND IT.
I'M NOT TRYING TO SPEND YOUR MONEY, BUT IS THERE, DO YOU HAVE ANY IDEAS ON THAT, OR IS THERE ANY OTHER LOCATIONS THAT YOU GUYS HAVE BEEN INVOLVED WITH, BUT THERE'S SOMETHING LIKE THAT? NO, SOME OF OUR SITES HAVE IT, SOME DON'T.
THIS ONE I LIKE JUST BECAUSE IT'S RIGHT, WE'RE CONNECTED TO THE WATER TOWERS, AND, AND ACTUALLY, YOU KNOW, SOME, SOME PEOPLE ACTUALLY TRY TO PULL INTO OUR EXIT, OR THEY'LL GO THROUGH THE VACUUM AREA AND REALIZE THEY HAVE TO TURN AROUND, AND IT'S JUST, IT WOULD BE NICE TO PUT IT UP, BUT, AGAIN, IT'S NOT UP RIGHT NOW, AND WE'RE GETTING AROUND IT, SO I, THIS ONE DOESN'T, DOESN'T BOTHER ME WHETHER IT'S APPROVED OR NOT.
LIKE I SAID, THE SIGN'S JUST UNNECESSARILY EXPENSIVE, BUT IT IS WHAT IT IS.
ALL RIGHT, ANY OTHER QUESTIONS FOR THE APPLICANT? WELL, MAYOR, I, I MEAN, I DON'T THINK ANYBODY'S ASKING NOT TO HAVE THE SIGN.
I THINK WE'RE VERY GOOD ON THAT.
IT'S MORE ABOUT WOULD YOU BE WILLING TO USE THE MASONRY THAT'S CONSISTENT WITH WHERE IT'S GOING TO GO? PROBABLY NOT.
THAT'S GOING TO BE JUST AS EXPENSIVE.
IT'LL PROBABLY JUST BE A, JUST AS EXPENSIVE TO DO SOMETHING LIKE THAT, SO I WOULD PROBABLY JUST LEAVE IT ALONE.
I MEAN, WE HAVE STRAPPING ON THE GROUND.
WE'LL JUST DO MORE STRAPPING, BUT I PROBABLY WOULD JUST NOT DO ANYTHING RIGHT THERE IF WE CAN'T GET THIS ONE APPROVED.
OKAY. SO YOU'D RATHER NOT HAVE A SIGN THAN HAVE ONE THAT'S MADE OF MASONRY? YEAH. OKAY.
ALL RIGHT, ANY OTHER QUESTIONS? THANK YOU, SIR.
ITEM 9A DOES NOT REQUIRE A PUBLIC HEARING, BUT I'LL GO AHEAD AND OPEN A PUBLIC HEARING ON ITEM 9A.
IS THERE ANYONE HERE WHO WISHES TO SPEAK ON 9A? SEEING NONE, I WILL CLOSE THE PUBLIC HEARING.
COUNCIL, ANY FURTHER DISCUSSION ON 9A, SPECIFICALLY THE DIRECTIONAL SIGN THAT WE BROUGHT UP, AND WHAT WE WANT TO DO WITH THAT ONE? I GUESS, OH, GO AHEAD.
I, I ACTUALLY, I DON'T HAVE A PROBLEM WITH IT.
IF YOU LOOK AT, IT'S JUST NOT THAT BIG, AND SO I DON'T KNOW HOW YOU DESIGN THAT WITH MASONRY.
I MEAN, IT'S AT THE TOP 17 INCHES WIDE, SO IT, IT'S TALL, BUT I, IT SEEMS LIKE IT'D BE A LOT OF MASONRY TO ENCASE THAT, SO I'M, I'M FINE WITH IT.
I'M, I'M FINE WITH THE REST OF THE SIGNS, AND IN LOOKING AT THAT, THOSE THREE, THOSE THREE WHITE, THEY'RE WHITE RIGHT NOW.
I THINK THE OTHER SET, OR SNAP SIGNS, THANK YOU.
MY NAME'S FROM OREGON SQUARE SNAP SIGNS.
I, I DO, THEY ARE, I'VE BEEN THERE.
THEY SEEM PRETTY FAR SET BACK IN TERMS OF BEING ABLE TO BE VIEWED, SO IT DOESN'T, IT DOESN'T, I DON'T THINK IT FEELS
[01:05:02]
LIKE IT'S AN ATTACK OF SIGNS OR ANYTHING LIKE THAT.OTHER THAN THE, THE ENTRY SIGN, I MEAN, THE REST OF THEM, THEY'RE, AGAIN, JUST TO KIND OF REITERATE, LOOK AT, I WAS GOING TO TELL YOU INSTEAD, THEY'RE FAR ENOUGH BACK.
I MEAN, THEY'RE OUT OF THE WAY.
I MEAN, IT'S, IT'S JUST SO FAR.
I, THERE'S REALLY NO ISSUE WITH THAT.
I'D LIKE TO SEE THAT STANDARD MET, JUST BECAUSE WE DON'T SET PRECEDENCE FOR ANYBODY ELSE THAT HAS A SMALL SIGN, THEY WANT TO STICK UP THE ENTRANCE OF THEIR PROPERTY AS WELL.
I CAN CERTAINLY SEE THE OWNER COMING BACK LATER IF, ON THAT PARTICULAR SIGN, IF HE COMES UP WITH A SOLUTION, OR IF HE REALLY HAS TO HAVE SOMETHING AS A SEPARATE ITEM.
HAVING THE MASONRY ON THIS DIRECTIONAL SIGN, OR SURROUNDING IT.
YEAH. I MEAN, I WOULDN'T, I WOULDN'T THINK IT'D BE THAT DIFFICULT JUST TO BUILD SOME TYPE OF MASONRY AROUND IT, SO, YOU KNOW, JUST TO, JUST TO MATCH THE ORDINANCE THAT WE ACTUALLY HAVE.
YEAH. SO, I AGREE WITH REGARDS TO THE, YOU KNOW, THE THREE INFORMATIONAL SIGNS INSIDE.
I'M OKAY WITH THAT, TOO, BECAUSE I DON'T, I DON'T THINK SOMEBODY GOING TO A CAR WASH HAS AN EXPECTATION OF NOT SEEING A LOT OF INFORMATION.
I THINK THEY, THEY KNOW WHERE THEY'RE AT.
AND, AND THE FACT THAT YOU CAN'T SEE FROM THE HIGHWAY VERY WELL IS, IS FINE.
AND I ALSO, I'M, I'M, I GUESS I'M A LITTLE CONFUSED THAT THE APPLICANT IS SAYING, I REALLY NEED A SIGN HERE DIRECTIONALLY, BECAUSE PEOPLE GO TO THE WATER PLANT.
BUT IF IT HAS TO BE MASONRY, THEN I'LL JUST NOT DO A SIGN.
I DON'T, I DON'T UNDERSTAND THAT, BUT I TEND TO ALIGN.
I, I WOULD BE COMFORTABLE APPROVING THE FULL SIGN PACKAGE AND APPROVING THAT SIGN TONIGHT WITH MASONRY TO MATCH THE BUILDING.
AND THEN THE APPLICANT DOES HAVE A CHOICE TO GO, YEAH, COOL, I WON'T DO A SIGN THEN.
RIGHT. AND THEN HE, BUT HE ALSO CAN MOVE FORWARD AND DO IT, YOU KNOW, IF HE WANTS TO.
THAT, THAT WOULD BE MY PREFERENCE.
I THINK THAT COVERS WHAT WE'RE ALL TALKING ABOUT.
ANYONE ELSE ON THIS ONE? ALL RIGHT, I THINK WE'RE PROBABLY READY FOR A MOTION ON 9A.
OKAY, YES, MAYOR AND COUNCIL, I MOVE THAT WE APPROVE ITEM 9A, SB25-0013, SIGN VARIANCE FOR TOMMY'S EXPRESS CAR WASH, LOCATED AT 3230 WEST SOUTHLAKE BOULEVARD, SUBJECT TO THE STAFF REPORT DATED JANUARY 26, 2026.
NOTING THAT WE'RE APPROVING SIGN VARIANCE TO ALLOW FOR NINE ADDITIONAL SIGNS RELATED TO THE DRIVE-THRU FOR THIS CAR WASH.
WE'RE APPROVING THE SIGN VARIANCE AS PRESENTED, NOTING THAT WE'RE APPROVING FIVE STANDARD SNAP SIGN HOLDERS, THREE ALONG THE EAST ELEVATION, TWO ALONG THE NORTH ELEVATION.
WE'RE APPROVING TWO SNAP SIGNS BETWEEN THE PAY LANES, ONE FOR PROMOTIONAL PURPOSES, ONE, AND ONE WARNING SIGN FOR MY CUSTOMERS TO EMPTY THEIR VEHICLE BEDS.
WE'RE APPROVING ONE BUILDING IDENTIFICATION SIGN ON THE WEST ELEVATION TO IDENTIFY THE LOCATION OF THE FREE MAP WASHERS.
AND FINALLY, WE'RE APPROVING ONE DIRECTIONAL SIGN, AS PRESENTED TONIGHT, WITH THE, OR WITH THE LANDSCAPE, WITHIN THE LANDSCAPE AREA TO GUIDE CUSTOMERS TO THE CORRECT ENTRANCE, NOTING THAT, RATHER THAN THE SIGN PRESENTED THIS EVENING, THE SIGN WOULD NEED TO COMPLY WITH UTILIZING BUILDING MATERIALS CONSISTENT WITH THE MASONRY ON THE MAIN BUILDING.
NEXT, WE'RE GOING TO GO TO ITEM 9B, CASE NUMBER SV25-0014, SIGN VARIANCE FOR WORLD-CLASS GARAGES LOCATED AT 900 THROUGH 950 DAVIS BOULEVARD.
THANK YOU, MAYOR, CITY COUNCIL.
[9.B. SV25-0014, Sign Variance for WorldClass Garages, located at 900-950 Davis Boulevard.]
BANNER SIGNAGE ON WINDSCREENS THAT WILL, WILL OR WILL BE SURROUNDING THE CONSTRUCTION SITE FOR THE WORLD-CLASS GARAGE FACILITY.THIS IS THE APPROVED SITE PLAN.
THE PROPOSAL INCLUDES THREE BANNER SIGNS ALONG THE PHASE ONE BOUNDARY OF THE PROJECT, WHICH INCLUDES THIS BUILDING HERE, IDENTIFIED AS BUILDING A1, AND THEN A PHASE TWO, WHICH INCLUDES THE LINEAR FOOTAGE ALONG THE REMAINING CONSTRUCTION PHASE OF THE, OF THE BUILDING SITE.
THIS IS THE PHASE ONE SIGNAGE.
IT INCLUDES THREE BANNERS WITH TWO LOGOS ON EACH ONE OF THOSE BANNERS ALONG THE, THE CONSTRUCTION FENCING AND WINDSCREENING PROVIDED TO SCREEN THE SITE.
AND THE PHASE TWO INCLUDES SIX INDIVIDUAL BANNERS PLACED AROUND THE CONSTRUCTION FENCING AND WINDSCREENING, WHICH WOULD INCLUDE INFORMATION ON THE PROJECT, THE BROKERAGE REPRESENTING THE SITE, AS WELL AS THE
[01:10:01]
CONSTRUCTION TEAM INVOLVED IN THE CONSTRUCTION OF THE SITE.EACH OF THESE SCREENS IS PROPOSED TO REMAIN, PHASE ONE IS PROPOSED TO REMAIN UNTIL END OF FOURTH QUARTER OF 26 OR UNTIL CONSTRUCTION COMPLETION OF THAT PARTICULAR PHASE OF THE PROJECT, WHICH WOULD BE TRIGGERED EITHER BY A FINAL BUILDING INSPECTION ON THE BUILDING OR BY WAY OF A CERTIFICATE OF OCCUPANCY, EXCUSE ME, BEING ISSUED.
AND THEN PHASE TWO, PROPOSED TO REMAIN THROUGH FOURTH QUARTER OF 27 OR COMPLETION OF CONSTRUCTION, AND THIS WOULD BE FOR THAT PARTICULAR PHASE, ONCE AGAIN, BY FINAL INSPECTION OF BUILDING, BUILDINGS IN THAT SITE OR A CERTIFICATE OF OCCUPANCY.
AND THAT TERMINATION DATE WOULD BE THE CENTER OF ANY OF THOSE OCCURRENCES HAPPENING.
SOME ADDITIONAL DETAIL, HOW THE SITE LOOKS TODAY.
AND SOME SIMILAR APPROVALS ON CONSTRUCTION FENCING AND BANNERS POSTED IN DURING CONSTRUCTION PHASING OF THE PROPERTY.
SIGNED BOARD APPROVED THIS 6-0 AT THEIR JANUARY 2ND MEETING, 2026.
I'LL BE GLAD TO ANSWER ANY QUESTIONS THAT YOU MAY HAVE.
ANY QUESTIONS? I THINK WE'RE GOOD ON THIS ONE.
IS THE APPLICANT HERE? COME ON DOWN, SIR.
IF YOU COULD STATE YOUR NAME AND ADDRESS FOR THE RECORD, AND THEN THE MICROPHONE IS YOURS.
GARY SHUMAN, I'M THE DEVELOPER ON THE PROJECT, 1313 DANBURY PARKS DRIVE IN TILLER, TEXAS.
MAYOR, COUNCIL MEMBERS, STAFF DID A GREAT JOB COVERING WHAT WE'RE LOOKING FOR.
THESE SIGNS WILL JUST REALLY HELP SPRUCE UP THE PLACE.
WE'VE GOT A LOT OF STUFF STORED, A LOT OF EQUIPMENT BACK BEHIND THOSE FENCES.
AND ANYWAYS, IF YOU'VE GOT ANY QUESTIONS, FEEL FREE TO ASK.
ANY QUESTIONS FOR THE APPLICANT? I THINK WE'RE GOOD.
ITEM 9B DOES NOT REQUIRE A PUBLIC HEARING, BUT I'LL GO AHEAD AND OPEN A PUBLIC HEARING ON ITEM 9B.
IS THERE ANYONE HERE WHO WISHES TO SPEAK ON ITEM 9B? SEEING NONE, I'LL CLOSE THE PUBLIC HEARING ON 9B.
COUNCIL, ANY FURTHER DISCUSSION ON 9B? GO AHEAD.
I WAS JUST GOING TO SAY, I THINK IT LOOKS GOOD.
IT'S GOING TO BE GOOD FOR BUSINESS.
AND IT'S NOT, ORIGINALLY WHEN I FIRST HEARD OF THIS, I THOUGHT MAYBE THE SIGNS WOULD BE, TO TRACK, YOU KNOW, TRAFFIC CUE COMING DOWN THE EDGE, BUT IT LOOKS GREAT.
MAYOR PRO TEM WILLIAMSON, I THINK WE'RE READY FOR A MOTION ON 9B.
MAYOR AND COUNCIL, MOVE THAT WE APPROVE ITEM 9B, SB25-0014, SIGN VARIANCE FOR WORLD-CLASS GARAGES LOCATED AT 900 TO 950 DAVIS BOULEVARD.
SUBJECT TO THE STAFF REPORT DATED JANUARY 26, 2026.
AND WE'RE APPROVING THE VARIANCE OF SIGN VARIANCE TO INSTALL NINE TEMPORARY CONSTRUCTION AND WINDSCREEN BANNERS ON THE EXISTING 450 CONSTRUCTION FENCING, 450 FEET CONSTRUCTION FENCING ALONG DAVIS BOULEVARD FOR PHASES ONE AND TWO.
NOTING THAT WE ARE APPROVING, WE'RE ALLOWING THREE CONSTRUCTION WINDSCREEN BANNERS AS PRESENTED FOR PHASE ONE, WITH THESE BANNERS TO BE REMOVED BY THE END OF FOURTH QUARTER OF 2026.
OR WITH THE FIRST FINAL, WITH THE FIRST BUILDING FINAL INSPECTION OR CERTIFICATE OF OCCUPANCY IS ISSUED FOR THAT PORTION OF THE PROJECT, WHICHEVER IS FIRST.
ALSO, THAT WE'RE APPROVING SIX CONSTRUCTION WINDSCREEN BANNERS AS PRESENTED FOR PHASE TWO, WITH THESE BANNERS TO BE REMOVED BY THE END OF THE FOURTH QUARTER OF 2027.
OR WITH THE FIRST BUILDING FINAL INSPECTION OR CERTIFICATE OF OCCUPANCY IS ISSUED FOR THAT PORTION OF THE PROJECT, WHICHEVER IS FIRST.
THANKS FOR BEING HERE TONIGHT.
NOW WE'RE GOING TO GO BACK IN OUR AGENDA TO ITEM 7A, ORDINANCE NUMBER 480-840, CASE NUMBER Z825-0066, FIRST READING ZONING CHANGE DEVELOPMENT PLAN FOR JAMES
[01:15:01]
PLACE, LOCATED AT 1318, 1330, 1354, 1360, AND 1364 NORTH PINKVILLE AVENUE, HERE IN[7.A. Ordinance No. 480-840, ZA25-0066, 1st Reading, Zoning Change and Development Plan for Jane’s Place, on property described as Lot 1, Janes Creek Addition, and Tracts 3, 3C, 3C02, and 3D, J. Childress Survey Abstract No. 253 and located at 1318, 1330, 1354, 1360, and 1364 N. Peytonville Avenue. Current Zoning: “AG” Agricultural District and “SF-1A” Single Family Residential District. Requested Zoning: “RPUD” Residential Planned Unit Development. SPIN Neighborhood #5.]
SOUTH LAKE.THANK YOU, MAYOR AND CITY COUNCIL.
THIS IS A REQUEST FOR A DEVELOPMENT PLAN ZONING CHANGE APPROVAL, CHANGING THIS PROPERTY FROM AGRICULTURAL AND SF1 ACING FAMILY RESIDENTIAL TO RESIDENTIAL PLANNED UNIT DEVELOPMENT.
THIS IS AN AERIAL VIEW OF THE SITE, SHOWING RED.
IT'S APPROXIMATELY 22 1/4 ACRE IN SIZE.
THIS IS AN AERIAL VIEW OF THE SITE.
IT'S APPROXIMATELY 22 1/4 ACRE IN LAND AREA.
THE LAND USE DESIGNATION ON THE PROPERTY IS LOW-DENSITY RESIDENTIAL.
CURRENT ZONING IS AGRICULTURAL AND SF1 ACING FAMILY RESIDENTIAL.
THIS IS A VIEW OF THE ENTRY FROM NORTH PINKVILLE AVENUE, AND THIS IS A VIEW LOOKING SOUTHWEST ALONG THE STREET FRONTAGE.
SOUTH PINKVILLE AVENUE IS A VIEW LOOKING NORTHWEST.
THIS IS THE PROPOSED DEVELOPMENT PLAN.
IT INCLUDES 15 SINGLE-FAMILY RESIDENTIAL LOTS, ALL GREATER THAN ONE ACRE IN SIZE, AND INCLUDES JUST UNDER 100,000 SQUARE FEET OF OPEN SPACE, ALONG WITH A PORTION OF THAT INCLUDING A DETENTION AREA, A DETENTION RETENTION AREA.
THIS IS A SITE DATA SUMMARY FOR THE PROPERTY.
ONCE AGAIN, 15 SINGLE-FAMILY RESIDENTIAL LOTS, TWO OPEN SPACE LOTS, AND 22.27 ACRES GROSS DENSITY.
THE PROJECT IS APPROXIMATELY 0.67 DWELLING UNITS PER ACRE.
UNDER THE PLANNED UNIT DEVELOPMENT ZONING, THE APPLICANTS REQUESTING DEVIATIONS FROM STANDARD OF THE SUBDIVISION ORDINANCE AS WELL AS THE ZONING ORDINANCE, WHICH IS PERMITTED UNDER THE PLANNED UNIT DEVELOPMENT ZONING.
THEY'RE REQUESTING A CUL-DE-SAC TO EXCEED 1,000 FEET STIPULATED BY THE SUBDIVISION ORDINANCE PROPOSING APPROXIMATELY 1,500 SQUARE FOOT OR 1,500 LINEAR FOOT CUL-DE-SAC.
ALSO REQUESTING THAT THE EXTENSION OF WOOD CREEK LANE NOT BE EXTENDED INTO THIS PROPERTY, THE SUBDIVISION ORDINANCE DOES NOT PERMIT DEAD-END STREETS AND REQUIRES THAT WHERE THOSE ARE ALLOCATED FROM ADJOINING SUBDIVISIONS, THAT THEY BE EXTENDED INTO DEVELOPING PROPERTY.
APPLICANTS REQUESTING NOT TO BE REQUIRED TO MAKE THAT CONNECTION.
ALSO, WITH THE INTERIOR STREET AND SUBDIVISION, THEY'RE REQUESTING THAT BE PRIVATE GATED STREET WITH RESIDENT ACCESS ONLY.
SUBDIVISION ORDINANCE REQUIRES STREETS BE BUILT IN DEDICATED PUBLIC AND THEN, IF TO BE PRIVATE, GO THROUGH A CONVERSION PROCESS REQUIRED UNDER THE SUBDIVISION ORDINANCE.
IF APPROVED, THE STREET WOULD NEED TO ABIDE BY THE STANDARDS OF THE SUBDIVISION ORDINANCE FOR PRIVATE STREETS.
THE APPLICANT'S ALSO REQUESTING WAIVER OF SIDEWALK REQUIREMENTS, BOTH INTERIOR AND ALONG PEYTONVILLE AVENUE REQUIRED BY THE SUBDIVISION ORDINANCE.
THEY'RE ASKING THAT THE LOT COVERAGE WITHIN THE DEVELOPMENT BE A MAXIMUM OF 40% WHERE SF1A SINGLE-FAMILY IS TYPICALLY 20%.
ADDITIONALLY, THEY'RE CAPPING THEIR ACCESSORY BUILDING AREA TO 2,000 FEET.
THEY'RE ALSO REQUESTING IN THE CHANCE THAT THERE IS AN OVERSIZED STORM WATER DETENTION AGREEMENT REACHED WITH THE CITY THAT THEY BE PERMITTED TO EXCEED 25% DETENTION AREA WITHIN THEIR OPEN SPACE, WHICH THE PLANNED UNIT DEVELOPMENT REGULATIONS TYPICALLY LIMIT DETENTION AREAS NOT TO EXCEED 25% OF THE REQUIRED OPEN SPACE.
[01:20:01]
THIS PROVISION IS SOLELY BASED ON IF AN AGREEMENT IS REACHED FOR PARTICIPATION WITH THE CITY IN OVERSIZING THE STORM SYSTEM, INCLUSIVE OF ADDITIONAL DETENTION BEYOND WHAT THEIR DEVELOPMENT REQUIRES.THIS IS THEIR PROPOSED FENCING PLAN.
AREAS IN GREEN IDENTIFY THAT THEY'LL RESPECT AND HONOR ANY OF THE EXISTING FENCES THAT ARE IN PLACE ON THEIR PERIMETER BOUNDARIES.
WHERE THERE IS NO FENCING, THEY ARE PROPOSING A SIX-FOOT IRON FENCE OR FOUR-FOOT IRON FENCE.
ADDITIONALLY, ALONG THE FRONTAGE, THEY'LL HAVE A MASONRY FENCE AS SHOWN IN THEIR RENDERINGS BELOW.
THIS IS THEIR TREE CONSERVATION PLAN.
THIS IS THEIR PLUMBERING WATER PLAN, EXCUSE ME, AND SEWER PLAN.
THIS IS A PROPOSED STORM WATER PLAN, AND THIS IS ONE OPTION THAT INCLUDES POSSIBLE OVERSIZING AGREEMENT AND SHOWS THE PATHWAY OF UNDERGROUND STORM PIPE AND WHERE THAT WOULD POTENTIALLY OUTFALL AND CAPTURE SOME OF THE RUNOFF COMING OFF OF PEYTONVILLE.
IT ALSO INCLUDES INTERNAL STORM SYSTEM THAT WOULD CARRY THAT COVERAGE INTO THEIR DETENTION AREA IN THE NORTHERN OPEN SPACE.
THIS IS A GRADING PLAN SHOWING DIRECTIONAL DRAINAGE AREAS.
THIS IS A PROPOSED PLAN THAT SHOWS THE OPTIONAL DETENTION AREA TWO ON THE SOUTHERN END, AND ONCE AGAIN, THIS WOULD BE CONTINGENT UPON AN AGREEMENT TO PARTICIPATE WITH THE CITY ON OVERSIZING OF THE STORM SYSTEM.
THIS IS AN AERIAL RENDERING OF THE SITE AND RENDERING OF THEIR ENTRY AND FENCE AND WALL ALONG PEYTONVILLE AVENUE.
SOME OF THE TYPICAL HOUSING TYPES THEY ANTICIPATE, AND THEIR DESIGN THEMES FOR THE DETENTION AREA.
WE PROVIDED PROPERTY OWNER NOTIFICATION WITHIN 300 FEET OF THE PROPERTY BOUNDARY.
WE'VE RECEIVED THREE IN OPPOSITION WITHIN OR NEAR THAT NOTIFICATION AREA, AND ONE IN FAVOR JUST OUTSIDE THAT NOTIFICATION AREA.
THE PLANNING AND ZONING COMMISSION RECOMMENDED DENIAL FOR TWO AT THEIR JANUARY 8TH MEETING, NOTING THAT THE ONLY REAL CONCERNS THEY HAD WAS HEARING AT PLANNING AND ZONING COMMISSION, THEY WERE NOT CERTAIN THEY COULD CONTAIN THEIR DEVELOPED CONDITION RUNOFF WITHIN THE AREA OF DETENTION THEY HAD ALLOCATED, AND WERE NOT SURE HOW MUCH OVER THAT 25 PERCENT THEY MIGHT BE REQUIRED.
THEY FURTHER NOTED THEY HAD QUESTIONS ON SOME OF THE OVERSIZING STORM WATER DISCUSSION, AND HOW THAT MIGHT AFFECT PROPERTIES NORTH OF THE OUTFALL AREA, AND HOW LONG THAT STORM UNDERGROUND STORM PIPE WOULD NEED TO BE, AND THEN HOW THAT ALSO MIGHT AFFECT SOME OF THE PROPERTIES IN THE WESTERN PORTION OF THE SITE.
WITH THAT, I'LL BE GLAD TO ANSWER ANY QUESTIONS YOU MAY HAVE, AND HAVE SOME KIND OF PRESENTATION AS WELL.
[01:25:01]
THANK YOU, DIRECTOR KILLOUGH.I THINK LIKE PLANNING AND ZONING, I THINK OUR QUESTIONS ARE GOING TO BE LESS ABOUT THE LOTS AND THE LOT SIZES AND THAT SORT OF THING, BUT MORE ON THE DRAINAGE ISSUES AND WATER.
CAN YOU, OR WOULD THAT BE MORE FOR PUBLIC WORKS TO TALK ABOUT THE STORM WATER OVERSIZING PARTICIPATION AGREEMENT, AND WHAT THAT IS IN GENERAL, AND WHAT THAT MIGHT MEAN SPECIFICALLY FOR THIS NECK OF THE WOODS, AS FAR AS WHETHER IT'S TO THE EAST OR THE WEST, OR WHATEVER? LAUREN, IS THAT FOR YOU? I HAD SOME QUICK QUESTIONS FOR DENNIS, IF I COULD ANSWER THOSE.
OR HE CAN COME BACK AND SPEAK TO YOU.
LET'S GO LAUREN FIRST, AND THEN DENNIS, DON'T GO ANYWHERE.
BUT LET'S TALK ABOUT THAT STORM WATER OVERSIZING PARTICIPATION AGREEMENT.
SO, THE CITY IDENTIFIED A PROJECT BACK IN A 2021 STUDY IN THIS AREA THAT NOTED SOME DRAINAGE CHALLENGES.
FOLLOWING THAT STUDY IN 2022, WE ADDED IT TO OUR CAPITAL IMPROVEMENTS PROGRAM.
IN THE OUT-YEAR PROJECT, SO IN THE, FOR EXAMPLE, THE PRESENTATION YOU SAW TONIGHT TALKING ABOUT THIS MULTI-YEAR PLANNING, GOES OUT IN A FUTURE YEAR.
WHENEVER THE DEVELOPER CAME IN, OUR STAFF APPROACHED THE DEVELOPER AND SAID, HEY, WE HAVE THIS PROJECT.
WE'D LIKE TO LOOK AT OPPORTUNITIES TO PARTNER WITH YOU, AND THE DEVELOPER WAS AGREEABLE.
AS PART OF THIS PROCESS, YOU KNOW, IT IS SEPARATE FROM ZONING, SO WE'LL, AFTER THE DECISION IS MADE, WITH THE COUNCIL AT THE ZONING LEVEL, WE WILL WORK WITH THE DEVELOPER TO ESTABLISH AN AGREEMENT, WHETHER THAT'S A DEVELOPER AGREEMENT OR SOME OTHER TYPE OF MECHANISM, TO BE ABLE TO PARTICIPATE IN THE OVERSIZING OF THE DRAINAGE ON HIS PROPERTY.
SO, THE CITY WOULD ONLY BE INTERESTED IN PARTNERING AS FAR AS TAKING THAT WATER OFF OF PEYTONVILLE.
THE DEVELOPER IS STILL GOING TO BE RESPONSIBLE FOR MANAGING THE DRAINAGE ON THEIR PROPERTY, SO ANY IMPACTS FROM THE DEVELOPMENT, THEY ARE RESPONSIBLE FOR MANAGING AS PART OF THEIR DEVELOPMENT PLAN.
SO, THIS AGREEMENT WOULD BE IN FURTHERANCE OF THE CITY'S OBJECTIVE OF DEALING WITH THE WATER COMING ON OR FROM PEYTONVILLE? YES.
NOW, HOW WOULD THAT, HOW DOES THAT WORK? I KNOW THERE'S THE INCREASED SIZE OF THE DETENTION POND ON THE PROPERTY.
IS THERE ANYTHING ELSE UNDERGROUND AS FAR AS WHERE, YOU KNOW, DRAIN PIPES ARE? HOW DOES IT GET FROM PEYTONVILLE TO THE DETENTION AREA? SO, WE'LL FINALIZE THAT THROUGH ENGINEERING DESIGN, WHETHER THAT GETS CONVEYED THROUGH THEIR DETENTION PONDS, AND THAT'S WHY THEY'RE ASKING FOR THE VARIANCE, TO GIVE THEM THE FLEXIBILITY TO BE ABLE TO OVERSIZE, UPSIZE THOSE PONDS, OR THROUGH A CLOSED PIPE SYSTEM THAT CONVEYS A MAINTENANCE BRANCH.
AND WE'LL FINALIZE THAT THROUGH ENGINEERING STUDIES.
DOES ANYONE HAVE ANY QUESTIONS FOR LAUREN AT THIS POINT ON THAT PART OF THE DEAL? AND THEN WE'LL SHIFT BACK TO DIRECTOR KILLOUGH.
DIRECTOR KILLOUGH, I THINK COUNCIL MEMBER TAGGART HAD A QUESTION OR TWO.
YEAH, JUST TWO MINOR QUESTIONS.
SO, WITH REGARDS TO SIDEWALKING, IS THAT ANYWHERE IN THE NEAR FUTURE FOR PEYTONVILLE? BECAUSE I KNOW WE'RE LOOKING FOR VARIANCE ON THE INSTALLATION OF A SIDEWALK ALONG THAT SECTION OF PEYTONVILLE, AND THAT'S A PRETTY TOUGH ROAD OVER THERE.
SO, I MEAN, IS THAT IN THE PLANS IN ANY OF OUR LIFETIMES? I'LL HAVE TO DEFER TO THE DIRECTOR ONE MORE TIME.
SO, THE SIDEWALKS ALONG PEYTONVILLE ARE IN THE PATHWAYS MASTER PLAN, BUT I'LL HAVE JEFF SPEAK TO THE TIMING AND PHASING OF WHEN WE HAVE THAT ON THE CAPITAL IMPROVEMENTS PLAN.
WE CURRENTLY DO NOT HAVE THIS SEGMENT WITHIN THE PATHWAYS MASTER PLAN FOR THE FIVE-YEAR CIP.
I THINK ALONG WITH THAT QUESTION, IS THERE ANY OTHER SIDEWALK ON THAT SIDE OF PEYTONVILLE? NO, SIR.
SO, WE MIGHT BUILD A SIDEWALK INTO NOWHERE? YES, SIR.
YEAH, WE'RE TALKING MAYBE A COUPLE HUNDRED FEET, YOU KNOW? WELL, ONE OTHER CONSIDERATION, TOO, ON THAT IS WE HAVE GIVEN VARIANCES WHERE THERE IS NO PLAN MANY TIMES, BUT IF THERE IS A PLAN, ANOTHER OPTION, I BELIEVE, FOR CONSIDERATION IS ESCROW.
WE CAN ESCROW IT UP FRONT, AND EVEN IF IT'S THERE FOR 10 YEARS, 15, IT DOESN'T MATTER.
IT'S THERE IF THERE TRULY IS A PLAN, WHICH I THINK THERE IS.
SO, I THINK IT'S WORTH CONSIDERATION AT THE RIGHT TIME.
YEAH, MY ONLY THOUGHT ON THAT IS THAT THE, I MEAN, LET'S SAY IT'S $20,000 TODAY TO ESCROW, AND IT SITS THERE FOR 10, 15, 20 YEARS.
I MEAN, IF I WANTED TO BUILD A SIDEWALK TODAY VERSUS 10 YEARS AGO, I MEAN, IT'S LIKE EIGHT TIMES WHAT IT COST BACK THEN.
SO, I'M NOT, IT'S ALMOST LIKE THROWING A ROCK IN A GRAND CANYON, YOU KNOW? IT MAY NOT ACTUALLY EVEN BE NEEDED.
BUT THAT WAS JUST THAT QUESTION.
THE SECOND QUESTION, IF YOU GUYS CAN ANSWER IT SO
[01:30:01]
DENNIS DOESN'T HAVE TO COME BACK UP, THAT'S FINE.SO, THE DEAD END OF WOODCREEK LANE, WE WERE TALKING ABOUT THAT.
ARE WE, AS PART OF THIS, ARE WE ABLE TO ELIMINATE ANY CHANCE OF, IN THE FUTURE, 18 YEARS FROM NOW, TO REFER TO A DIFFERENT LOCATION OF SOMEONE SAYING THIS HAD BEEN INTENDED TO BE A PASS-THROUGH ROAD? ARE WE ABLE TO PULL THAT COMPLETELY FROM THERE AND ALSO MAKE SURE THAT, THE SECOND QUESTION IS, POST OAK, IS THERE ANY TYPE OF ACCESS THROUGH THERE AS WELL THAT COULD ALSO BE ELIMINATED SO THAT WE DON'T HAVE ANY FUTURE ISSUES A LONG TIME FROM NOW WITH THIS IN THE NEIGHBORHOOD? BY NATURE OF THE DEVELOPMENT OF THE PROPERTY, I THINK IT WOULD PREVENT CONTINUATION OF THAT.
BUT TO COMPLETELY ELIMINATE ANY POSSIBILITY OF SOMEBODY COMING FORWARD AND TRYING TO PROPOSE SOME CONNECTION OR USE THAT WOULD REQUIRE GOING THROUGH AN ABANDONMENT PROCESS TO ABANDON THOSE PORTIONS OF RIGHT-OF-WAY.
I BELIEVE POST OAK MAY HAVE AN ACCESS EASEMENT THAT WAS PART OF THE PLAT FOR ONE OR BOTH OF THOSE LOTS THAT TERMINATE THERE, THAT TURN AROUND AT POST OAK.
AND THEN, OF COURSE, WOODCREEK WAS A STREET STOP INTENDED TO PROVIDE CONTINUATION OF THE STREET SYSTEM AS THE PROPERTY ADJOINING IT DEVELOPED.
SO AS FAR AS THE ABANDONMENT OF WOODCREEK ACCESS, IS THAT SOMETHING THE DEVELOPER WOULD FILE FOR OR IS THAT SOMETHING THAT THE CITY WOULD DO? THAT'S SOMETHING THE PROPERTY OWNERS COULD FILE FOR AND IT'S ALSO SOMETHING THE CITY HAS A POTENTIAL TO INITIATE.
BECAUSE, I MEAN, IT IS THEORETICALLY POSSIBLE IF THEY'RE SELLING IT LOT BY LOT THAT THERE'S A LOT THAT JUST DOESN'T SELL OR IT GETS CONVEYED OVER TO A DIFFERENT PROPERTY OWNER AT SOME POINT AND THEN THEY SAY THAT THEY WANT TO HAVE THE ACCESS ON THAT ROAD.
SO, ANYWAY, JUST SOMETHING I WONDERED.
YOU KNOW, JUST KIND OF CONCERN OF A LOT OWNER OR SOMETHING THAT IF THAT RIGHT-OF-WAY IS STILL THERE, SOMEBODY PROPOSING TO UTILIZE THAT PUBLIC DEDICATION OR SOMETHING, YOU COULD PUT STIPULATION IN THE ZONING REQUEST THAT NO ACCESS WOULD BE PERMITTED TO THE ADJOINING EITHER STREET RIGHT-OF-WAYS OR ACCESS EASEMENTS STOPPING THE PROPERTY.
ANY OTHER QUESTIONS FOR DENNIS OR LAUREN OR ANYONE ELSE BEFORE WE GO TO THE APPLICANT? THANK YOU, SIR.
AND IF YOU COULD STATE YOUR NAME AND ADDRESS FOR THE RECORD AND THEN IT'S ALL YOURS.
I LIVE AT 2905 PENINSULA DRIVE IN GRAPEVINE, JUST DOWN THE STREET HERE.
LET ME OPEN UP BY SAYING THANKS FOR HAVING US TONIGHT.
I APPRECIATE WHAT ALL YOU GUYS DO.
THERE WAS MORE THAN A COUPLE OF YOU I ASKED TO GET SOME FEEDBACK BEFORE THIS MEETING.
COUNCILMAN TAGGART HAS BEEN DOWN AT THE PROPERTY MULTIPLE TIMES, SPENT A LOT OF TIME.
AS AN ELECTED REPRESENTATIVE OF OUR NEIGHBORHOODS AND CITY, APPRECIATE THAT.
COUNCILMAN REYNOLDS TOOK SOME TIME ON A SATURDAY AWAY FROM HIS KIDS PLAYING BASKETBALL TO SPEND A LITTLE TIME WITH ME AND GIVE ME SOME FEEDBACK.
AND COUNCILWOMAN CHARLIE, THE SAME.
MAYOR, YOUR TEAM HERE HAS GONE ABOVE AND BEYOND IN CERTAIN WAYS TO TRY TO GET THIS RIGHT.
DENNIS, CAN WE HAVE MY PRESENTATION? THANK YOU.
SO JUST A LITTLE BACKGROUND ABOUT ME.
HE'S A RETIRED VETERAN FIREFIGHTER.
WE BOTH HAPPEN TO BE NEIGHBORS.
WE GRADUATED FROM GRAPEVINE HIGH SCHOOL.
HOPEFULLY YOU GUYS DON'T TAKE THAT AWAY FROM US.
BUT WE GRADUATED FOUR DRAGONS.
SO I THINK WE MADE UP WITH IT TWO TO ONE.
AND JUST FROM OUR PERSPECTIVE, THIS IS OUR HOME.
WE SPEND A LOT OF TIME HERE, A LOT OF TIME IN THE SCHOOL SYSTEM.
AND WE CARE ABOUT THIS DEVELOPMENT, NOT JUST FROM THESE ARE OUR NEIGHBORS.
AND SO JUST OUR APPROACH TO THIS PARTICULAR PIECE OF PROPERTY.
TOM PRITCHETT, WHO DID SOME WORK IN VAQUERO.
SO WE TRIED TO PUT TOGETHER A TOP-NOTCH TEAM TO HANDLE THIS.
TWORNEY AND I BOTH LIVE UP ON LAKE GRAPEVINE.
I DEAL WITH LOTS OF ANIMALS, WILDLIFE, FLOODING.
AND SO THE PROPERTY ALMOST FITS ME PERFECTLY, JUST IN TERMS OF WHAT I'VE LIVED THROUGH
[01:35:02]
FOR THE LAST 18 YEARS UP HERE IN GRAPEVINE.AND SO I THOUGHT IT WAS A GOOD FIT WHEN I SAW IT.
LIKE, I WOULD LOVE TO DO THE RIGHT THING HERE.
AND THEN I DON'T WANT TO TAKE DOWN ANY TREES.
I LOVE NATURAL SCREENING, ESPECIALLY BIG, HEALTHY TREES.
SO I'M GOING TO ASK THEM FOR SOME JUSTIFICATION HERE ON THAT AND WHAT WE VIEWED WHEN WE LOOKED AT THE LAND IN GENERAL AND HOW WE DESIGNED THIS.
AND THEN WE PICKED, YOU KNOW, JANE'S PLACE.
IT WAS IN ADDITION TO THE FAMILY, BUT OUR JANE'S SPENT A LOT OF YEARS HERE.
AND SOUTHLAKE IS A GOOD STEWARD OF THE LAND.
BEFORE HIS PASSING, THAT IS JUST BEAUTIFUL PROPERTY, AND HE JUST TOOK CARE OF IT SO WELL.
WE THOUGHT IT WAS APPROPRIATE.
SO JUST A LITTLE BIT ABOUT THIS.
IF YOU JUST TOOK, WITHOUT THE STORMWATER ISSUE, I THINK WE'VE MINIMALLY, WE'VE MET EVERY REQUIREMENT THAT THIS CITY HAS ASKED US TO.
WE STARTED OUT AND WENT TO CORRIDOR.
IT WAS LOUD AND CLEAR IN CORRIDOR.
NOTHING LESS THAN ONE ACRE IN THIS AREA.
TRIED TO PRESERVE THE TREES, TRIED TO DO THE RIGHT THING.
AND SO WE'VE DONE, WE LIKE THE REALLY OPEN FENCING AT THE FRONT.
IT'S VERY INVITING FOR THE PROPERTY.
SO GONE THROUGH THE ENTIRE PROCESS.
AND THEN, YOU KNOW, THE CITY, DICK LOREN TALKED ABOUT IT, HAS BEEN VERY OPEN WITH US.
THEY DIDN'T HAVE TO DO THIS, BUT THEY BASICALLY SAW WHAT WE WERE DOING AND SAID, YOU GUYS SHOULD READ THIS, YOU SHOULD UNDERSTAND WHAT THE CITY IS TRYING TO DO, AND SEE, YOU KNOW, HOW YOU FEEL ABOUT THAT, WHICH I THOUGHT WAS JUST GREAT.
IT SOMETIMES RUNS COUNTERINTUITIVE.
IT'S ALWAYS THE CITIZENS AGAINST THE CITY, OR THE DEVELOPER AGAINST THE NEIGHBORS.
BUT THIS IS AN OPPORTUNITY FOR US TO ALL WORK TOGETHER, AND I THINK SO FAR WE HAVEN'T HEARD FROM THE NEIGHBORS, BUT I THINK WE'VE DONE ALL THAT WE CAN.
I DID WANT TO SAY AT SPIN, JUST LOOKING AT HOW THE CITY WORKED IN THIS AREA, IS WHAT WE ORIGINALLY BROUGHT TO SPIN, WAS TO TAKE THIS WOOD CREEK THROUGH.
IT WAS A TWO-AND-A-HALF HOUR, I WOULDN'T SAY BEAT DOWN, BUT IT WAS A TWO-AND-A-HALF HOUR LASHING IN TERMS OF SOME JUSTIFICATION TO CHANGE THIS UP.
AND SO WE LISTENED TO THAT, AND THAT'S REALLY THE MAIN CHANGE, AND WE CAME BACK TO P&Z AND TALKED ABOUT THIS.
SO I WON'T SPEND TOO MUCH TIME.
THAT'S A SAMPLE OF OUR FENCING.
I DID WANT TO TALK JUST ABOUT STORMWATER IN GENERAL.
SO AS PROPOSED, WE ARE HANDLING ALL OF THE STORMWATER THAT WE WOULD GENERATE AS A NEW DEVELOPMENT IN OUR OWN, I GUESS, POND, IN ADDITION TO 10%.
AND WE WOULD ALSO IMPROVE THAT POND.
RIGHT NOW, THERE'S WATER THAT FLOWS OVER THE TOP.
WE WOULD BUILD A SYSTEM, EVEN IF IT'S JUST US AND WE'RE NOT PARTICIPATING IN THE STORMWATER, THAT WOULD ALLOW THAT TO RELEASE.
AND WE'D GET TO A CERTAIN POINT WHERE IT WOULD GO THROUGH SOME TYPE OF A SKIMMER SYSTEM.
I'M JUST GIVING YOU SOME EXAMPLES.
AND THEN ON OUR PROPERTY, IT WOULD OUTFLOW SOMETHING SIMILAR TO THIS.
SO THERE'S NOT TONS OF EROSION THAT'S HAPPENING TODAY.
RYAN BLANKFORD IS THE GUY THAT LIVES IN THAT BLUE.
HE WAS ONE OF THE OPPOSED VOTES.
HE CAME IN EARLIER, MET ME OUTSIDE, AND SAID, HEY, HOW LONG IS THIS GOING TO GO? I HAVE A CHILD RECITAL.
TELL HIM THAT I WANT TO TALK TO HIM.
I SAID, YOU'RE GOING TO GET ANOTHER CHANCE, DON'T WORRY.
AT THE TIME, HE AND HIS ENGINEER DID NOT UNDERSTAND THE DIRECTIONAL.
MATTER OF FACT, WE DIDN'T LABEL THESE ARROWS.
SO OUR INTENTION HERE WAS ACTUALLY TO IMPROVE WHAT GOES AROUND RYAN'S BRIDGE.
HE HAS AN INDEPENDENT ENGINEER.
TOM PRITCHETT, WHO I MENTIONED ON MY TEAM, HAPPENED TO DO HIS WHOLE DESIGN.
AND SO I THINK RYAN IS COMFORTABLE MEETING MY TEAM AND UNDERSTANDING THAT I'M MAKING MY ENGINEERING TEAM OPEN.
BUT ALSO, WHEN SHE REVIEWED THIS, HER NAME IS RHONDA BISSONNIER, SHE UNDERSTOOD THAT WE'RE BUILDING UP THESE LOTS SO THAT THE HOUSE AND THE STRUCTURE DRAINS TOWARDS THE STREET AND INTO OUR RETAINER.
AND SO THE ONLY THING THAT WOULD GO IN BACK THROUGH RYAN'S BRIDGE OVER HERE IS ACTUALLY WHAT IS NATURALLY THERE, THE HACK THAT OCCURS TODAY.
SO WE WOULDN'T INCREASE THAT FLOW.
I JUST WANTED TO MAKE THAT STATEMENT.
AND THEN YOU GUYS STOP ME IF YOU HAVE QUESTIONS.
WE LOOKED AT THIS AT THE VERY BEGINNING WHEN WE UNDERSTOOD WHAT WAS GOING ON.
WE HAD NO IDEA THAT THERE WAS A STORMWATER ISSUE.
WHEN WE GOT TO WATCH VIDEOS OF SOME OF THE NEIGHBORS WHO MAY BE HERE TODAY WHERE THERE WAS STANDING WATER FLOWING THROUGH THEIR HOUSES, IT DOESN'T HAPPEN ALL THE TIME, BUT IT'S HAPPENED WITHIN THE LAST FIVE OR SIX YEARS.
IT WAS A BIT SHOCKING FOR US TO UNDERSTAND, BUT THEN WE HAD TO GO TO WORK.
SO WHEN YOU LOOK AT IT FROM A DEVELOPER'S STANDPOINT, THE MAJORITY OF THIS ACREAGE IS OUTSIDE
[01:40:01]
OF THE REST OF THE DEVELOPMENT.AND SO WE DO HAVE AN OPTION WHERE THERE'S A HOUSE THERE TODAY, AND I HAVE PICTURES IF YOU WOULD LIKE TO SEE IT, BUT THERE IS A HOUSE THERE TODAY WE INTEND TO TAKE DOWN, AND THEY BUILT IT UP AND THEY PUT SOME RAILROAD TIES AND TRIED TO BLOCK THE WATER COMING OFF PEYTONVILLE SO IT GOES AROUND THAT HOUSE.
AND SO IT WAS LIKE, WELL, WE COULD BUILD A FOUNDATION UP OR WE COULD JUST NOT DO ANYTHING IN LOT ONE, BUT THAT'S REALLY KIND OF NOT DOING RIGHT FOR THE NEIGHBORS.
SO WHEN WE WERE LOOKING AT THIS STUDY, WE REALLY CAME UP WITH TWO OPTIONS, AND WE HAVE MET WITH THE CITY PRELIMINARILY.
THEY'VE ANSWERED A LOT OF QUESTIONS, BUT IT'S SORT OF WHAT THEY TOLD YOU GUYS TODAY.
THEY DO THIS IN A DIFFERENT PROCESS.
THIS IS NOT IN A ZONING CHANGE PROCESS.
THEY DO IT IN CLADDING, AND THEY'RE WILLING TO DO THIS.
AND SO THEY'VE GONE ABOUT AS FAR AS I THINK THEY CAN GO WITH US IN THE COMPLETE DESIGN.
SO I WISH I COULD GIVE YOU GUYS THIS IS EXACTLY HOW WE'RE GOING TO DO IT, BUT THE CITY'S NOT THERE AND WE'RE REALLY NOT THERE YET BECAUSE WE'RE GOING TO HAVE TO DO A BUNCH OF ADDITIONAL WORK ENGINEERING-WISE TO HANDLE THIS.
SO IT'S SORT OF A CAPTURE, CONVEY, RELEASE, WE THOUGHT WAS THE SMARTEST OPTION WHEN WE LOOKED AT ALL THIS, BUT WE'VE COME TO LEARN THAT IT'S REALLY CAPTURE, CONVEY, RETAIN, AND RELEASE IS WHAT WE'D LIKE TO DO.
SO LET ME JUST SHOW YOU A COUPLE PICTURES.
THIS WAS THE FIRST THING THAT WE PROPOSED, AND IT'S CAPTURING A LOT OF WATER THAT'S GOING PRETTY FAST OVER THERE ON PEYTONVILLE, PUTTING IT UNDER OUR ROAD SO WE'RE NOT TAKING DOWN ANY TREES, WHICH IS WHAT YOU WOULD HAVE TO DO.
THERE'S TWO WAYS THAT THIS STUDY SAID YOU GUYS COULD FIX THIS, WHICH IS TAKE DOWN ALL THESE TREES AND GO DOWN THIS ROAD AND PUT IT RIGHT WHERE I'M PUTTING IT OR PROPOSING TO PUT IT, OR GO DOWN PEYTONVILLE AND THERE'S AN ABOVE-GROUND DRAINAGE AREA THAT GOES IN BETWEEN A BUNCH OF HOUSES AND DO THE SAME THING, BOTH TRENCHED.
AND SO WHEN WE LOOKED AT THIS, WE HAD THE OPPORTUNITY TO PUT IT UNDER OUR ROAD.
THE BAD NEWS IS FOR YOU GUYS IS THE TIMING BECAUSE ONCE OUR ROAD GOES DOWN, YOU CAN'T PUT IT UNDER OUR ROAD ANYMORE.
AND SO WE THOUGHT THIS WAS GREAT.
WE CAN DO IT LESS EXPENSIVE AND TURN UP CITY STREETS.
WE DON'T HAVE TO TAKE DOWN ANY TREES, AND WE'RE GOING TO REALLY USE THE EXISTING DRAINAGE EASEMENTS THAT EXIST TODAY TO DO THIS.
AND THEN WE HAPPENED TO BE UNDER CONTRACT FOR THIS LOT, SO WE COULD GRANT THIS EASEMENT OURSELVES BECAUSE WE CONTROLLED THIS LOT OUTSIDE.
THIS LOT'S ALREADY PLATTED, BUT IT WAS PART OF WHAT IS IN AGREEMENT WITH THE SELLER.
DOWNSIDE IS, AFTER MEETING WITH THE CITY A FEW TIMES, THEIR CONCERN IS DOWNSTREAM IMPACT.
AND, LOOK, WHEN YOU PICK UP A BUNCH OF WATER HERE AND YOU JUST SET IT RIGHT THERE, THERE'S GOING TO BE DOWNSTREAM IMPACT BECAUSE THERE'S NO WAY TO SLOW IT DOWN.
AND THEY'RE NOT EXPERIENCING THAT TODAY BECAUSE THIS VOLUME OF WATER GOES LIKE THIS ACROSS.
IT GOES THROUGH PEOPLE'S HOUSES, BUT IT GETS SLOWED DOWN.
SO JUST WITHOUT ANY SCIENCE AT ALL, THERE'S GOING TO BE A DOWNSTREAM IMPACT, AND THAT'S A CONCERN OF THE CITY.
SO, I MEAN, IF YOU JUST LOOK AT THIS, IT'S MINIMAL ENVIRONMENTAL.
IT'S SAFETY BECAUSE THERE'S WATER THAT'S NOT WASHING ACROSS PAYTONVILLE IN THE EVENT OF A STRONG STORM.
IT DOES MINIMIZE THE BUDGET BECAUSE WE HAVE TO TURN UP CITY STREETS, BUT THERE IS THIS RISK ON FLOW RATE.
THERE IS A NEIGHBOR WHO IS AN ENGINEER WHO WOULD BE DIRECTLY AFFECTED, AND SHE POINTED THAT OUT AFTER P&T.
SO WE JUST GET SO MUCH WATER, PLUS THE WATER THAT WE'RE TAKING IN, WE CAN'T TAKE IT ALL.
I WOULD LOVE TO JUST SAY, LET'S JUST PUT IT ALL AND RETAIN IT IN THIS AREA, BUT WE CAN'T.
OUR STUDIES SHOW THAT WE CAN HANDLE OUR LOAD PLUS 25% IN THIS AREA, AND WE'VE STILL GOT TO CLEAN THIS UP A LITTLE BIT.
OUR PROPOSAL WAS THE ENGINEERING WAS TWO 3-BY-4 PIPES.
THIS, AGAIN, WAS FROM THE STUDY.
SO WE THOUGHT, WHY DON'T WE JUST TAKE ONE DOWN ON THE TRENCH AND THEN TAKE ONE AND PUT IT SOMEHOW INTO THIS AREA, THUS SLOWING DOWN HALF OF IT AND JUST DOING THE ROUGH MATH.
I'M NOT AN ENGINEER, BUT I HAVE ONE BEHIND ME THAT I'M PAYING, IT'S NOT GOING TO IMPACT.
THERE'S THE POTENTIAL TO SLOW IT DOWN.
HE'S GOING TO SLAP ME WHEN HE HEARS THAT.
BUT JUST THINKING ABOUT IT, WE HAVEN'T DONE THE MATH, BUT THERE IS A CHANCE WHERE WE'RE NOT GOING TO IMPACT NEGATIVELY.
WE MIGHT BE ABLE TO, DEPENDING ON HOW MUCH SPACE WE END UP USING HERE.
AND THAT'S ABOUT AS FAR AS WE CAN GO.
I THINK FROM AN APPLICANT AND ALSO FROM THE LANDOWNERS THEMSELVES, WE WOULD LIKE TO SOLVE THIS PROBLEM NOW.
WE WOULD LIKE TO TAKE CARE OF IT AND DO THE RIGHT THING.
[01:45:01]
TO MINIMIZE THE IMPACT TO THE ENVIRONMENT, THE TREES, AND ALL THE OTHER STUFF, BUT THERE'S NO WAY THAT WE CAN TAKE ON ANY WATER AND PUT IT ABOVE GROUND AT THIS FLOW AND NOT AFFECT THIS AREA.AND WHAT'S HAPPENING TODAY, THIS IS ALL ABOVE GROUND FLOW RIGHT NOW.
SO IF I CONTAINED MINE, I COULD STILL LEAVE IT ABOVE GROUND BECAUSE I'M GOING TO HAVE ZERO IMPACT TO WHAT'S HAPPENING TODAY.
BUT IF I BRING ANYTHING FROM PEYTONVILLE IN, IT'S GOING TO HAVE TO BE DREDGED OR IT'S GOING TO CAUSE A MAJOR PROBLEM.
SO JUST TO REITERATE OR BE CLEAR, OPTION TWO THAT YOU'RE SHOWING, BOTH THE BLUE AND THE RED, SO THERE'S THE TWO STORMWATER LINES? YES.
SO WE WOULD PUT ONE DOWN THERE.
AGAIN, WE ALL HAVE GOT TO WORK TOGETHER TO MAKE SURE THIS WORKS.
THE IDEA WOULD BE WE COULD REALLY HANDLE HALF OF THAT FLOW.
AND THERE'S AN ENGINEERING WAY THAT YOU CAN DIVIDE THE FLOW EQUALLY UP AT THE TOP SO THERE'S NOT ONE EMPTY PIPE AND ONE FULL PIPE.
AND BOTH OF THEM UNDER THE STREET OR UNDER THE ROAD FROM PEYTONVILLE INTO THE NEIGHBORHOOD? YES.
ONE OF THEM WOULD SURFACE, OBVIOUSLY, AND COME INTO OR MIGHT NOT SURFACE.
THEY WOULD COME INTO OUR RETENTION AREA SO WE CAN RETAIN THAT LINE.
AND I THINK YOU SAID THE MEASUREMENTS, BUT HOW BIG WERE THOSE STORMWATER LINES? THREE BY FOUR.
AND SO RIGHT NOW THE WATER IS GOING ON THE SCREEN FROM RIGHT TO LEFT, FROM I GUESS THAT'S EAST TO WEST, LIKE ACROSS PEYTONVILLE.
IT GOES DOWN BASICALLY LIKE THIS.
AND I CAN'T SPLIT THROUGH THESE.
I'M SURE THIS PERSON AND THIS PERSON AND THIS PERSON IS REALLY GETTING THE WHAMMY WHEN IT HAPPENS.
AND THEN IT FLOWS ALL THE WAY THROUGH THE NEIGHBORHOOD.
I MEAN, I WOULD SAY EVERYBODY DOWN HERE ALONG THIS ROW IS GETTING WATER COMING FROM THIS WAY.
I'M SURE SOME OF THEM ARE HERE, THE REPRESENTATIVES.
THEY SHOULD SPEAK FOR THEMSELVES.
THERE'S LIKE AN EASEMENT ALONG THE NORTHERN PART OF THIS PROPERTY LINE, THE JAMES PLACE PROPERTY LINE.
WELL, MAYOR, WHEN I LOOKED AT THE STUDY THAT YOU GUYS HAD DONE, THEY RECOMMENDED THAT YOU OBTAIN AN EASEMENT.
BUT I WOULD SAY THE REASON WE HAVE PROPOSED ONE IS FOR SURFACE.
RIGHT? JUST TO HAVE WHAT'S HAPPENING IN OUR LOTS FLOW ALONG THE SURFACE, AND THEN WE WOULD RUN IT BACK TO OUR FACILITY.
THERE WOULDN'T BE THAT MUCH VOLUME BECAUSE IT'S ALL COMING FROM HERE.
BUT WE ARE PROPOSING AN EASEMENT NOW.
IF WE WERE TO DO THIS HERE, WE WOULD LOSE, WHAT, 1,000 TREES OR MORE? RIGHT.
BECAUSE YOU WOULD HAVE TO NOT ONLY TRENCH, BUT YOU WOULD HAVE TO GET YOUR EQUIPMENT IN THERE.
SO, YOU KNOW, YOU'RE TAKING DOWN EVEN MORE AREA.
AND IF YOU SAW THIS, I SHOULD HAVE BROUGHT PICTURES.
SO, IT'S NOT A I THINK THE WIN HERE IS JUST THAT EVERYTHING ELSE IS THE SAME.
BUT I THINK WE CAN CONTROL THE FLOW RATE, WHICH IS IMPORTANT, AND WE CAN MANAGE IT TO THE DISCHARGE POINT AS OPPOSED TO JUST GOING FROM POINT A TO POINT B.
SO I THINK, YOU KNOW, THERE'S REALLY NO HUGE CONCLUSION HERE OTHER THAN IF WE WANT TO ADDRESS THIS, IT'S ALONG THE LINES OF YOUR STUDY THAT YOU HAD DONE FROM OUTSIDE ENGINEERING.
WE'VE FOLLOWED THIS PART OF IT.
I THINK THIS IS THE LEAST EXPENSIVE BY FAR, HALF THE COST OF RIPPING UP YOUR STREETS.
THE PRESSING THING WOULD BE FOR US AND WHEN I SAY PRESSING, NOT LIKE TOMORROW, BUT IN OUR NORMAL DEVELOPMENT IF WE COULD FIT IT IN THERE TO ENGINEER THE RIGHT SOLUTION AND DO ALL THE WORK BECAUSE WE'RE ALREADY GOING TO HAVE EQUIPMENT UP THERE.
AND THE OTHER NICE THING IS WE'RE GOING TO HAVE TO TAKE DOWN A FEW TREES.
ANYWAY, YOU'VE NOTICED WE'VE DESIGNED THIS TO BE CURVED.
NUMBER ONE, IT KIND OF SLOWS TRAFFIC DOWN.
NUMBER TWO, THERE ARE SOME BIG TREES ON EITHER SIDE OF THIS THAT WE THOUGHT WE COULD SAVE IF WE JUST BEND THE ROAD AROUND.
AND SO THE TIME TO DO IT IS NOW.
THIS MAY BE A QUESTION FOR YOUR ENGINEER, BUT IF YOU CAN ANSWER IT.
ALONG PEYTONVILLE, RIGHT WHERE LOT 1 AND LOT 6 ARE, HOW DO YOU DO THE WORK TO GET THE WATER TO GO RIGHT IN UNDER THE ROAD INTO THE NEIGHBORHOOD? HOW DOES THAT WORK? BECAUSE IT SOUNDS LIKE RIGHT NOW IT'S KIND OF A FREE-FOR-ALL.
IT JUST KIND OF GOES NORTHWEST.
HOW DO YOU KIND OF TARGET OR DIRECT THAT WATER TO GO WHERE IT NEEDS TO GO TO GET INTO THESE WATER LINES? IF THAT'S FOR THE ENGINEER, GO AHEAD.
WELL, THE BOTTOM LINE IS WE DEFINITELY HAVE TO SURVEY THE AREA.
IT'S ON THE OTHER SIDE, UNLESS THE PROJECT MOVES FORWARD.
BUT THE NUMBER ONE THING WOULD BE TO SURVEY IT,
[01:50:01]
AND THEN HE CAN TALK TO YOU GUYS.IF YOU COULD JUST GIVE YOUR NAME AND ADDRESS FOR THE RECORD, THEN GO AHEAD.
MY NAME IS STEVE HOMER, 206 ELM STREET, SUITE 105 IN LOUISVILLE, TEXAS.
WE'RE THE CIVIL ENGINEER ON THIS PARTICULAR PROJECT.
WITH WHAT WE'VE SHOWN ON THIS PARTICULAR PLAN ON THE RED RECTANGLE THERE ON THE RIGHT SIDE OF BAKERVILLE, THAT IS THE LOW SPOT CURRENTLY AS IT EXISTS TODAY.
AND SO, AS CHERI HAS INDICATED, WE'RE GOING TO HAVE TO DO A LITTLE MORE SURVEYING IN THAT PARTICULAR AREA TO BETTER DEFINE WHAT IMPROVEMENTS ARE THERE, WHAT OBSTRUCTIONS WE MIGHT HAVE, AND SO FORTH.
WHAT WE'RE INTENDING TO DO IS, IN ORDER TO PUT IN A FOUR-FOOT BY THREE-FOOT BOX, AND THAT'S FOUR-FOOT WIDE, THREE-FOOT TALL, WE'LL HAVE TO EXCAVATE THAT AREA DOWN.
AND IN DOING SO, WE'LL CREATE BASICALLY A CONCRETE BOWL, WHICH WILL REQUIRE SOME GARGOYLE ALONG BAKERVILLE.
AND SO THE INTENT IS, SINCE THAT IS THE NATURAL LOW SPOT, IS TO DESIGN A SYSTEM THAT WILL BE ABLE TO CAPTURE AS MUCH OF THAT WATER AS WE POSSIBLY CAN AND THEN CONVEY IT THROUGH THE DRAINAGE SYSTEM THROUGH OUR POND OR INTO HIGGINS BRANCH.
WHILE WE HAVE THE ENGINEER UP HERE, DOES ANYONE HAVE ANY QUESTIONS FOR HIM? ALL RIGHT, I THINK WE'RE GOOD.
THANK YOU, SIR. APPRECIATE THAT.
ANY OTHER QUESTIONS FOR THE APPLICANT? IS THAT IT FOR THE PRESENTATION? ANY QUESTIONS FOR THE APPLICANT? I DO HAVE ONE QUESTION.
I WANT TO ASK YOU TO MAYBE REITERATE OR EXPAND ON, I THINK I HEARD YOU MAKE A COMMENT THAT SAID, AS PLANNED, YOU CAN CONTROL YOUR WATER AND 25% MORE.
I SAID 25% MORE. I MISSED ABOUT 10% MORE.
SO YOUR POSITION IS THAT THIS WOULD, AT MINIMUM, BE STATUS QUO TO HOW IT CURRENTLY IS, BUT LIKELY UP TO A 10% IMPROVEMENT FROM YOUR PERSPECTIVE? YEAH, IN TERMS OF NOT HANDLING THE STORMWATER.
AND I ACCIDENTALLY SKIPPED THROUGH THIS SLIDE.
THIS MAY ANSWER YOUR QUESTION, COUNCILMAN WILLIAMS. IF YOU LOOK AT OUR CURRENT ELEVATION OF OUR POND AND OUR CALCULATIONS ARE 30, BASICALLY 37,000 IN TERMS OF THE VOLUMES PER CUBIC FEET, AND THEN YOU ADD 10% TO THAT, IT'S IN THE 40 RANGE.
AND SO IF WE JUST WENT UP ONE FOOT IN THE ELEVATION OF THE POND, AS WE'VE SHOWN HERE, WHICH REPRESENTS 25% OR LESS OF THE OPEN SPACE.
SO WE WOULD JUST SHAPE THAT TO WHERE WE COULD HANDLE IT UP TO 29.
AND THAT'S WHAT THIS STUDY, WE BASICALLY DID THIS DETENTION AREA STUDY, AND THEN OVER HERE WE THOUGHT WE COULD HANDLE ANOTHER POTENTIAL 80,000 MORE IN ADDITION TO THIS SPACE.
BUT IT'S JUST KIND OF AN ENGINEERING EQUATION ON FLOW RATES AND WHAT ARE WE GOING TO TAKE, HOW MUCH ARE WE GOING TO TAKE FROM PEOPLE TO DESIGN.
YEAH, TO THAT POINT ON YOUR DETENTION POND, EXCUSE ME FOR MY NOVICE ON THIS BECAUSE I AM NO ENGINEER, I SEE THE LOT WHERE YOU HAVE THAT POND SITTING.
IS THERE AN OPTION FOR THAT POND TO BE EVEN LARGER? YEAH, POTENTIALLY, SURE.
IT COULD BE BIGGER, YEAH, TAKE ON MORE WATER.
I MEAN, OBVIOUSLY WE HAVE THE STREET.
I MEAN, WE WOULD KIND OF LOOK AT ALL WAYS TO DO THIS.
ANYTIME I'M GETTING OVER HERE IN THIS SPACE, I'M GOING TO AFFECT SOME OF THE TREES THAT I WOULD LIKE TO NOT AFFECT.
RIGHT? SO IT'S HOW CAN WE MAXIMIZE THE TREELESS AREA, RIGHT? WELL, AS I THINK ABOUT SOMETHING AS SIMPLE AS BUILDING A POOL, SMALL EXPANSIONS IN THE PERIMETER OF A POOL TAKES ON MASSIVE AMOUNTS OF WATER.
SO IT'S AN INTERESTING CONCEPT FOR US TO TALK ABOUT.
YEAH, I THINK WE'RE OPEN TO ANYTHING.
JUST FOR CLARIFICATION ON THE SOUTH OPEN SPACE, IS THAT A DEFINITE THAT THAT IS GOING TO BE PART OF THE DEVELOPMENT UNDER ANY SCENARIO? LIKE THE POTENTIAL FOR, IN THIS CASE, DETENTION OF WATER OVER THERE, WOULD THAT, IF THERE'S NO CITY PARTICIPATION IN WHAT YOU PROPOSE IN YOUR OPTIONS, WOULD THAT TURN INTO A LOT THAT YOU WOULD USE FOR ADDITIONAL? SO IT WILL STAY AS PART OF WHAT YOUR PLAN IS HERE? IT WILL STAY OPEN SPACE FOR SURE.
AND THEN YOU SAID THAT CAPACITY IS ABOUT 80,000 CUBIC FEET? SO FAR.
I MEAN, WE'VE GOT TO LOOK AT DEPTH AND OTHER THINGS,
[01:55:01]
BUT STEVE DID THOSE CALCULATIONS.I JUST WANT TO SEE, BECAUSE THAT WOULD BE AN ADDITIONAL 600,000 OR 700,000.
700,000 GALLONS OF WATER RETENTION OVER THERE.
YEAH, I THINK OUR IDEA IS TO USE THE LEAST AMOUNT OF SPACE TO DETAIN THE WATER.
WHAT I DON'T WANT AS A DEVELOPER IS TO HAVE A 20-FOOT HOLE THAT'S 10-FOOT DEEP, AND YOU'RE LOOKING AT, YOU KNOW, THAT'S THE ONLY THING THAT I REALLY CARE ABOUT.
I DON'T WANT IT TO BE FULL, BUT I WANT TO DESIGN SOMETHING THAT YOU CAN AT LEAST LOOK AT AND NOT FALL INTO.
BUT OTHER THAN THAT, I WANT TO DESIGN IT THE WAY WE NEED TO DESIGN IT.
COULD YOU TALK REAL QUICKLY? I MEAN, WE'RE TALKING ABOUT THE WATER RACING WEST DOWN PEYTONVILLE.
IT GOES TO THE SOUTH, KIND OF SPLITS BETWEEN SOUTH OPEN SPACE AND THE NORTH OPEN SPACE.
AND THAT SLOWS IT DOWN TO THEN GO NORTH TO YOUR RED BOX.
WHEN I DROVE THROUGH THIS AFTER WE SPOKE ON SATURDAY, AND I KIND OF DROVE THROUGH THE STREET AND THEN OUT, BUT I COULDN'T GET DOWN TO THAT OUTLET DOWN THERE.
WHAT'S THAT LOOK LIKE? YOU FLASH A SCREEN UP THAT KIND OF SHOWED MAYBE SOME RIPRAP OR SOMETHING LIKE THAT, AND I ASK THAT SPECIFICALLY BECAUSE I'M WONDERING, AS IT FLOWS OUT THERE, DOES THAT CAUSE FURTHER EROSION THERE? OR ARE YOU GOING TO HAVE, YOU KNOW, I'M THINKING OF CIVIL DESIGNS WHERE YOU HAVE ALL THE ROCKS AND ALL THAT JAZZ THAT REALLY PREVENTS THE EROSION? YEAH, THAT WOULD BE THE IDEA.
WE'D PUT TO USE THE PROPER WHATEVER IS RECOMMENDED BETWEEN THE CITY AND MY ENGINEER WHEN WE GET TO THAT POINT.
I MEAN, THAT WAS JUST AN EXAMPLE.
YOU KNOW, IT'S HARD TO JUST DETERMINE HOW MUCH OF THIS WATER THAT STARTS HERE AND GOES ACROSS HERE ENDS UP HERE, BUT THAT'S ESSENTIALLY WHERE THE STUDY SAID IT ENDED, AND THAT'S WHY WE CHOSE THAT LOCATION.
IT GOES ALL OVER THE PLACE, RIGHT? IT DOESN'T GO UPHILL, RIGHT, FOR SURE, SO IT DOESN'T GO THIS WAY, YOU KNOW, BUT IT GOES ACROSS ALL THIS STUFF AND SOMEHOW ENDS UP.
THERE IS A DRAIN RIGHT HERE THAT RUNS EAST AND WEST, SO IF THE WATER MAKES IT ALL THE WAY TO HERE, IT'LL GET INSIDE AND GO THIS WAY, BUT I SUSPECT IT CAN GO DOWN THIS STREET, AND THEN THERE IS ANOTHER CUL-DE-SAC DOWN HERE, AND I BELIEVE THEY GET FLOODING, BUT I CAN'T SAY IT'S PART OF THIS MAIN BUILDING, BUT IT MIGHT VERY WELL BE.
IT'S ACTUALLY SO ON EITHER SIDE OF JAMES COURT ON THE NORTH SIDE THERE, SO YOU'VE GOT THE PROPERTY THAT'S JUST NORTH OF THAT, SO IT'S ACTUALLY TWO CREEKS THAT KIND OF COME TOGETHER JUST NORTH OF HIS PROPERTY AND A LITTLE BIT FURTHER NORTH, THEN IT OPENS UP INTO A MUCH LARGER AREA, SO I THINK THAT IS AT THE GENERAL AREA WHERE YOU'RE PROPOSING THE OUTLET WOULD END UP BEING, BECAUSE IF SO, OBVIOUSLY THAT MIGHT BE SIGNIFICANT.
YOU KNOW, TALKING TO MY NEIGHBORS OVER THERE.
WHAT WE'RE PROPOSING IS TODAY IN POST OAK THERE IS THAT EAST-WEST, AND THERE IS AN OUTLET RIGHT THERE, AND I KNOW A FEW OF THE ACTUAL LANDOWNERS ARE HERE TO TELL YOU WHERE THAT IS.
SO IF WE GO RIGHT, I THINK YOU CAN SEE IT RIGHT HERE.
YOU SEE THIS DRIVEWAY? SO THERE IS A DRAINAGE THAT'S ABOVE GROUND, THEN IT GOES UNDERGROUND, AND THEN IT'S RELEASED RIGHT HERE.
THAT STUDY THAT YOU GUYS HAD TOOK THE WATER TO THERE.
SO THAT'S WHY WE CHOSE THAT LOCATION.
IS THERE A BETTER LOCATION IN BETWEEN HERE AND THERE? I'M NOT SURE, BUT RYAN SURE WOULDN'T WANT TO SURFACE IT ANYWHERE PAST HIS HOUSE.
I JUST WANT, JUST FROM A PUBLIC RECORDS STANDPOINT, THAT WE, YOU KNOW, MAYBE IT'S A CITY COMMENT, THAT WE JUST THINK THROUGH THAT FROM A LONG-TERM EROSION STANDPOINT.
IT MAY NOT NECESSARILY BE TO YOU THAT WE THINK ABOUT SOME SORT OF EROSION PREVENTION, RIPRAP, WHATEVER.
ANY OTHER QUESTIONS FOR THE APPLICANT AT THIS TIME? ALL RIGHT, STICK AROUND.
ITEM 7A IS A FIRST READING, SO IT DOES NOT REQUIRE A PUBLIC HEARING, BUT I SEE SOME MEMBERS IN THE AUDIENCE.
SO WE'LL OPEN A PUBLIC HEARING ON ITEM 7A AND INVITE ANYONE WHO WISHES TO SPEAK REGARDING ITEM 7A.
I'LL ALSO NOTE, FOR THE RECORD, THE CITY SENT OUT 34 PUBLIC HEARING NOTIFICATIONS TO PROPERTY OWNERS.
AS OF THIS DATE, WE HAVE, LOOKS LIKE, FOUR RESPONSES.
[02:00:01]
CREEK COURT IS OPPOSED.IVAN KUTHIAR AT 1205 NORTH BATONVILLE AVENUE IS IN FAVOR.
PATRICK LANGSTON AT 1535 OAK LANE IS OPPOSED.
AND JENNIFER WELDAY AT 1450 POST OAK TRAIL IS OPPOSED.
BUT, AGAIN, I'VE OPENED UP A PUBLIC HEARING ON ITEM 7A AND INVITE ANYONE WHO WISHES TO SPEAK TO COME ON DOWN.
SOMEBODY'S GOT TO GO FIRST, RIGHT? AND IF YOU COULD STATE YOUR NAME AND ADDRESS FOR THE RECORD, AND THEN YOU'LL SEE THE TIMING SYSTEM.
GREEN MEANS GO, YELLOW MEANS YOU'VE GOT A MINUTE LEFT, AND THEN RED MEANS IF YOU COULD JUST START WRAPPING IT UP.
MY NAME IS JENNIFER WELDAY, AND WE LIVE AT 1450 POST OAK TRAIL.
SO MY HUSBAND, JEFF, AND I ARE HERE TONIGHT.
AND I SAID I WAS OPPOSED, BUT I HONESTLY AM KIND OF IN THE MIDDLE WITH IT BECAUSE I APPRECIATE SO MUCH JERRY AND ALL THAT HE'S DONE WITH OUR NEIGHBORS.
I APPRECIATE THAT CHUCK CAME AND MET MY HUSBAND.
WE LIVE EXACTLY WHERE YOU'RE TALKING ABOUT ON THE RIGHT-OF-WAY.
SO THE RIGHT-OF-WAY IS ON THE SIDE OF OUR HOME, AND THE WATER DOES COME DOWN BOTH TOPICALLY INTO A DRAIN SYSTEM WHERE POST OAK AND THE RIGHT-OF-WAY MEET, AND ALSO THERE IS THE, I BELIEVE IT'S A THREE-BY-FOUR DRAINAGE THAT GO UNDERNEATH.
MY HUSBAND AND I, WITH MY DAD, BUILT, REMODELED THIS HOME.
I'M VERY FAMILIAR WITH THE PREVIOUS DRAINAGE STUDY THAT'S AFFECTED US DIRECTLY.
WE LIVE THERE, AND YES, THERE IS A LOT OF WATER THAT COMES TOPICALLY.
IT CLOGS THE DRAIN ON THE STREET, SO EXCESS WATER ON THE STREET WE WOULD BE OPPOSED TO.
IT DOES WORK WELL THE WAY THE DRAINAGE IS NOW, BUT I DO LIKE THE IDEA OF EROSION CONTROL AND RIPRAP AND ALL THAT JERRY HAS RECOMMENDED WITH THE RETENTION OF THE WATER BEFORE IT GETS TO US.
OUR NEIGHBORS ON THE OTHER SIDE ARE OUT OF TOWN, OUT OF STATE, OR I THINK THEY WOULD BE HERE AS WELL.
BUT I THINK A GOOD SYSTEM IS OPTION TWO THAT JERRY HAS RECOMMENDED.
IT'S CERTAINLY BETTER THAN OPTION ONE.
I WISH WE WOULDN'T ADD ANY MORE WATER TO OUR SITUATION OR TO ANY OF MY NEIGHBORS, BUT THAT'S NOT THE CASE.
SO IN REALITY, I THINK THE BEST WAY IS EROSION CONTROL TO DEFINITELY PROTECT THE TREES.
POST OAKS ARE INCREDIBLY SENSITIVE, MORE THAN ANY OTHER OAK TREE.
SO BOTH IN THE NEW DEVELOPMENT AND IN OUR NEIGHBORHOOD, YOU'RE GOING TO LOSE THEM JUST BECAUSE, YOU KNOW, IF THE ENVIRONMENT CHANGES, THE TREE ISN'T SUSCEPTIBLE.
BUT CERTAINLY IF YOU PUT A LOT MORE WATER ON THEM, THEY DON'T LIKE IT.
SO THE OTHER THING TO MENTION, THOUGH, IS AS YOU LOOK AT THE MAP AND YOU SEE WHERE WE ARE AT 1450 IN THE RIGHT-OF-WAY, BEHIND IT, SO CLOSER TO WHERE WE SEE 1825, FROM THAT AREA OF CROSS TIMBERS, THERE IS ALSO A DRAINAGE SYSTEM THAT FEEDS IN DIRECTLY THERE FROM CROSS TIMBERS COMING DOWN FROM THAT LANE.
AND IT ALL FEEDS INTO THERE, AND IT WORKS OUT WELL.
IF WE GET A GULLY WASHER, YES, IT CAN SWELL UP INTO OUR YARD.
IT'S NEVER BEEN LIKE A FLOODING ISSUE FOR US, BUT TO ADD MORE WATER, IT IS A CONCERN.
BUT I DO LIKE THE IDEA OF HAVING THE RETENTION POND.
I THINK THE BIGGER, THE BETTER, THE MORE THAT WE CAN FLOW THAT WATER DOWN BECAUSE JERRY IS INHERITING ALL OF THAT DRAINAGE ISSUE ON PEYTONVILLE.
SO, AGAIN, STARTING OUR PROJECT IN 2020-2021, WE'VE LIVED THIS OUT, AND THAT'S JUST KIND OF WHERE WE ARE.
BUT I REALLY APPRECIATE YOU GUYS HEARING THIS.
THANK YOU FOR BEING HERE TONIGHT.
IS THERE ANYONE ELSE WHO WISHES TO SPEAK REGARDING THIS ITEM? YES, SIR.
IF YOU COULD PLEASE STATE YOUR NAME AND ADDRESS FOR THE RECORD, AND THEN IT'S ALL YOURS FOR THREE MINUTES.
I LIVE AT 1400 POST OAK TRAIL.
THAT IS JUST WHERE YOU CAN SEE 1400 FROM MY ADDRESS UP THERE.
I THINK REALLY WHAT WE'RE TALKING ABOUT IS THERE IS INDEED A WATER ISSUE THAT JERRY IS INHERITING, BUT IT'S FROM PREVIOUS SUBDIVISIONS AND JUST KIND OF OVER THE YEARS.
AND SO I THINK I'M HERE JUST TO SAY I REALLY WANT TO ENCOURAGE THE CITY TO KIND OF LOOK AT THIS FROM A FULL SPECTRUM BECAUSE, YES, HE'S GOING TO BE CREATING MORE WATER.
HE IS SAYING THAT HE CAN TAKE CARE OF THE WATER, BUT THAT DOESN'T DO ANYTHING WITH THE WATER THAT WE'VE ALREADY EXPERIENCED.
I THINK I MAY HAVE EVEN SENT SOME TO COUNCILMAN TAGGART AS WELL OVER THE YEARS.
WE'VE HAD, AGAIN, AS JERRY MENTIONED, WATER GOING THROUGH PEOPLE'S HOUSES.
[02:05:01]
I DON'T KNOW THAT BUILDING CHANGE PLACE IS GOING TO RESOLVE THAT PARTICULAR ISSUE FOR US.AND SO I REALLY WOULD LIKE TO URGE THE CITY TO REALLY CONSIDER THAT THIS IS A MUCH BIGGER PROBLEM THAN JUST THIS PARTICULAR ISSUE IS THAT THE WATER DOESN'T GO AWAY, AND THEN WHEN YOU ADD MORE IMPERMEABLE SPACES, THEN IT ACTUALLY DOES COMPOUND THE PROBLEM.
SO I LIKE THE IDEA OF, YOU KNOW, UNDER THE GROUND AND GOING DOWN THE CREEK.
AGAIN, AS JEN SAID, WHAT HAPPENS AT THE END OF WHERE THAT BOX IS, THAT'S SOMETHING THAT NEEDS TO BE EXPLORED AND TALKED ABOUT.
BUT, AGAIN, THAT SEEMS TO BE THE BEST BECAUSE IT DOES TAKE THE WATER OFF OF THOSE THREE HOUSES ON CYPRESS CREEK THAT THOSE ARE THE PEOPLE THAT EXPERIENCE IT THE MOST.
SO I JUST, AGAIN, WANT TO JUST GO ON RECORD IN SAYING THAT I THINK THAT IF THE CITY COULD REALLY CONSIDER THIS PROPOSAL THAT HE'S MAKING, I THINK IT WOULD BE A GREAT IDEA FOR ALL OF US.
THANK YOU, SIR. THANK YOU FOR BEING HERE TONIGHT.
IS THERE ANYONE ELSE WHO WISHES TO SPEAK REGARDING ITEM 7A? COME ON DOWN.
AGAIN, IF YOU COULD PLEASE STATE YOUR NAME AND ADDRESS FOR THE RECORD.
JEFF WELDING, 1450 COASTAL TRAIL, JENNIFER'S HUSBAND.
I JUST WANT TO ALSO SAY THANK YOU SO MUCH.
YOU ALL HAVE DONE A GREAT JOB.
THE DEVELOPERS HAVE BEEN VERY THOROUGH.
IT'S NOT AN EASY SITUATION TO RESOLVE, AND REALLY APPRECIATE EVERYBODY TAKING THE TIME AND EFFORT TO TRY TO FIGURE THIS OUT.
I DO HAVE SOME QUESTIONS, AND I DON'T KNOW IF THOSE ARE DIRECTED TO YOU OR TO THE DEVELOPER, BUT MAYBE JUST FOR THE RECORD.
IF THE DRAINAGE PIPE IS GOING TO GO, I GUESS, TO THE WEST OF POST OAK, IS THE IDEA THAT THE DRAINAGE PIPE IS COMPLETELY SUBMERGED UNDERGROUND, AND HAS ANY WORK BEEN DONE YET ON THE IMPACT TO TREES AND EVERYTHING THAT'S BEHIND THE LOTS OF POST OAK? THEY ARE HEAVILY WOODED IN THERE, AND I DO HAVE CONCERNS THAT IF WE TAKE A DRAINAGE PIPE UNDERGROUND, THAT YOU'RE GOING TO HAVE AN ADVERSE IMPACT ON ALL THE TREES AND WILDLIFE THAT'S BACK THERE.
I'M NOT SUGGESTING THAT THAT'S NOT THE RIGHT SOLUTION.
IT'S JUST I DO HAVE QUESTIONS AND CONCERNS IF THAT IS THE SOLUTION THAT THE CITY DECIDES TO PURSUE WITH THE DEVELOPER, TO JUST BETTER UNDERSTAND THAT.
I THINK IT'S WHAT I'D LIKE TO KNOW.
WE'LL BRING THE APPLICANT BACK UP.
I THINK THAT'S PROBABLY AN APPLICANT FOR THIS ENGINEER QUESTION.
DO YOU WANT TO COME AND ADDRESS THAT RIGHT NOW? I CAN.
TO ANSWER HIS QUESTION, SO WE WANT TO SURVEY NOT JUST WHAT IS THE DRAINAGE EASEMENT THAT EXISTS THERE TODAY, BUT ALSO THE TOPO SERVING TREE SURVEY.
SO IT'S HARD TO ANSWER HIS SPECIFIC QUESTION WITHOUT DOING THAT.
BUT WE WOULD INTEND TO DO THAT AND JUST LOOK AT THE IMPACT.
IT IS A DRAINAGE EASEMENT, SO, YOU KNOW, FROM OUR PERSPECTIVE, I MEAN, THERE'S ALREADY A BUNCH OF STUFF CUT IN THERE, BUT WHEN YOU COME AND YOU PUT IN TWO, WE'RE GOING TO HAVE TO TRENCH PIPES AND PUT THEM UNDERGROUND, SO WE'RE GOING TO LOSE SOME STUFF FOR SURE IN THAT EASEMENT.
I JUST DON'T KNOW WHAT BIG TREES ARE WHERE, BUT IF WE DID A TREE SURVEY, WHICH THIS IS OUTSIDE OF MY PROPERTY BOUNDARIES, SO I'D HAVE TO GET PERMISSION TO DO THAT, BUT THAT'S WHAT I'M PROPOSING AS THE NEXT STEP FOR US IS TO SURVEY THAT AREA AND PAYTONVILLE BECAUSE THERE'S ALSO BIG TREES ON BOTH SIDES OF PAYTONVILLE WHERE WE MIGHT PUT COLLECTION BOXES AND WE CAN DESIGN SO MUCH AROUND THAT AREA.
SO TO BE CONTINUED ON THAT ONE, I DON'T THINK WE HAVE AN ANSWER YET.
MAYOR, LET ME ASK A FOLLOW-UP QUESTION OF DIRECTOR KILO.
DID I HEAR THE APPLICANT SAY THERE CURRENTLY IS A DRAINAGE EASEMENT THROUGH 1535 AND 1825? OR MAYBE THE APPLICANT CAN SPEAK TO THAT.
THERE IS A CURRENT CITY DRAINAGE EASEMENT THAT GOES FROM HERE ALL THE WAY TO THE HIGGINS BRANCH.
THAT'S WHAT I WAS TALKING ABOUT WAS KIND OF WE'VE SURVEYED HERE AND DID A TREE SURVEY, BUT IF WE WERE TO TRENCH THIS ALL THE WAY, WE WOULD WANT TO DO A COMPLETE SURVEY OF THE EXISTING DRAINAGE EASEMENT ALONG WITH THE TOPO TREES.
IS THERE ANYONE ELSE WHO WISHES TO SPEAK REGARDING ITEM 7A? LAST CALL.
THANK YOU ALL FOR BEING HERE ON THAT.
WE'LL CLOSE THE PUBLIC HEARING ON 7A.
COUNCIL, ANY FURTHER QUESTIONS FOR THE APPLICANT OR THE ENGINEER OR DIRECTOR KILO OR DIRECTOR LANIV? NO MORE QUESTIONS.
ANY DISCUSSION? GO AHEAD, FRANK.
I WAS JUST GOING TO SAY, YEAH, IT'S DIFFICULT.
[02:10:02]
ZONING ALONE, BUT THE PROJECT ITSELF LOOKS GOOD.ACRE LOTS IS CONSISTENT WITH THAT AREA.
QUALITY DEVELOPER, QUALITY PROJECT THAT WE'RE SEEING, ALL THAT'S GOOD.
AND FROM THE RESIDENT'S, THE NEIGHBOR'S STANDPOINT, WE KNOW THAT BY ORDINANCE, NOT ONLY IS THE APPLICANT SAYING, HEY, I CAN HANDLE MY WATER AND APPEARS TO BE VERY EXCITED TO HANDLE HIS WATER, WHICH IS A GREAT THING, BUT BY ORDINANCE IT'S REQUIRED TO HANDLE THE WATER.
YOU'RE REQUIRED TO HANDLE THAT WATER WITH POTENTIALLY A LITTLE PLUS SIDE FROM WHAT YOU WERE SHARING.
THE FACT THAT THERE SEEMS TO BE SHARED INTEREST BETWEEN THE APPLICANT, BETWEEN THE CITY, BETWEEN THE COUNCIL, TO SOLVE THIS LONGSTANDING WATER PROBLEM IS A REAL POSITIVE TO ME.
AND WHILE WE'RE CONSIDERING THIS APPLICATION ON THE MERITS OF SIMPLY ZONING, I DO THINK THAT THIS IS THE NEIGHBOR'S BEST CHANCE TO FIX A LONG-TERM PROBLEM.
I THINK, YOU KNOW, YOU FIRST LOOK AT THE NUMBERS AND SEE, YOU KNOW, 22 ACRES, 15 HOUSES, ONE ACRE LOTS, OKAY, THAT CHECKS ALL THE BOXES.
BUT THEN WHEN WE GET INTO THESE WATER ISSUES, I MEAN, YOU'VE HEARD FROM EVERYONE UP HERE ON COUNCIL, WE'RE VERY SENSITIVE TO THAT AND VERY CONCERNED ABOUT THAT.
WE WANT TO, IN THIS CASE, TAKE A PROBLEM, AN EXISTING PROBLEM THAT'S ALREADY THERE, AND TRY TO MAKE IT BETTER OR FIX IT.
SO I APPRECIATE THAT THE DEVELOPER AND HIS TEAM HAVE WORKED WITH THE CITY TO THIS POINT ON A POSSIBLE AGREEMENT GOING FORWARD THAT PERHAPS ADDRESSES PROBLEMS THAT ARE ALREADY THERE AND MAKES THINGS BETTER NOT ONLY FOR THIS NEW NEIGHBORHOOD BUT THE EXISTING NEIGHBORHOODS AND BEING A GOOD NEIGHBOR TO THOSE FOLKS THAT ARE ALREADY THERE.
I LIKE WHERE WE'RE GOING WITH, YOU KNOW, THE TALKING ABOUT TRYING TO MAKE THIS BETTER FOR EVERYONE, INCLUDING THE NEIGHBORS ON ALL SIDES OF THIS DEVELOPMENT.
SO THIS COULD BE SOMETHING, IT'S GOOD TIMING WHERE WE COME TOGETHER ON THIS AND MAKE IT BETTER.
SO, COUNCIL MEMBER TIGER, I THINK YOU WERE NEXT.
LET'S START WITH, THIS IS AN EXAMPLE FOR ME OF EVERYTHING DONE RIGHT.
SO THE DIFFERENT PROPOSALS THAT I'VE SEEN COME IN, THIS IS SOMEONE WHO'S COME IN WITH A GREAT PROPOSAL IN MY MIND.
I'VE SPENT THE LAST SEVERAL MONTHS LOOKING AT THIS PROJECT, AND I'VE BEEN OUT THERE SEVERAL TIMES AND WALKING THE CREEK, AND I APPRECIATE MEETING WITH THE NEIGHBORS AND THE DEVELOPER ON IT.
I MEAN, WHAT'S GREAT ABOUT THIS TO ME IS IT PRESERVES THE CHARACTER OF PEYTONVILLE.
THE TREE PRESERVATION IS OUTSTANDING.
ALL THE LOTS ARE GREATER THAN ONE ACRE.
THESE ARE HIGH-VALUE LOTS, WHICH WILL INCREASE THE VALUE, IN MY OPINION, OF PROPERTIES AROUND THEM.
BUT THE BIGGEST THING IS IT'S A CHANCE TO RELIEVE DRAINAGE ISSUES IN AN AREA THAT DOES HAVE ACTUAL ISSUES.
I LIKE THE IDEA OF THE POTENTIAL WORK WITH THE CITY, AND I LIKE THE IDEA OF SPLITTING THE DRAINAGE SO SOME OF IT GOES INTO THE RETENTION POND, AND THAT SHOULD HELP.
I THINK ANYTHING HE DOES IS GOING TO HELP THE SITUATION OVER THERE.
I CAN SPECULATE, SO WE'RE MAKING A STATEMENT, I GUESS, THAT AS FAR AS THE OUTLET GOES UP HERE THROUGH THE EASEMENT, THE DRAINAGE EASEMENT, YEAH, YOU WOULD HAVE TO DISTURB TREES.
THERE'S NO WAY THAT YOU CAN DIG THROUGH THERE AND NOT TAKE SOME TREES OUT.
BUT LET'S ALSO KEEP IN MIND THAT PART OF THE DRAINAGE ISSUES THAT THIS AREA AND OTHER AREAS OF SOUTH LAKE HAS IS BECAUSE THOSE DRAINAGE EASEMENTS ARE SUPPOSED TO BE FREE OF MANY TREES THAT GET CLOGGED UP WITH BUSHES AND TREES THAT FALL INTO THEM AND THEN FURTHER CLOG UP, AND THEN THAT SLOWS THE WATER DOWN.
SO BY WORKING THROUGH THAT, YOU ACTUALLY SHOULD RELIEVE SOME OF THOSE DRAINAGE ISSUES AS WELL.
BUT OVERALL, I THINK THIS IS GREAT.
I'M IN FULL SUPPORT OF THIS DEVELOPMENT.
I JUST WANTED TO SAY, JERRY, GREAT JOB ON THIS.
I THINK YOU HANDLED IT REALLY WELL, TALKING TO THE NEIGHBORS, BEING PATIENT WITH THEM, AND HANDLING AN ISSUE THAT, LIKE COUNCILMAN TAGGART SAID, IS AN ONGOING ISSUE THAT I'M HOPEFUL IN THE LONG TERM YOU DOING THIS ENDS UP BEING A BETTER OUTCOME FOR EVERYBODY IN THE LONG TERM.
AND BY YOUR DESIGN, IT LOOKS LIKE IT'S DONE RIGHT.
YOU KNOW, I REALLY LOVE THE FENCING, THE GATES, AND ALL THAT JAZZ.
I WANT TO ECHO EVERYTHING ALL THE OTHER COUNCIL MEMBERS HAVE SAID, ESPECIALLY ABOUT THE DRAINAGE.
THE DRAINAGE IS SUCH A BIG DEAL IN THIS PROJECT THAT WE HAVE NORMALLY SPENT HOURS TALKING ABOUT TREES, LOSING TREES, MAINTAINING ONE-ACRE LOTS, KEEPING THE RURAL FEEL.
I'M VERY PLEASED TO SEE THAT THEY'RE PUTTING A FENCE IN FRONT THAT IS REMINISCENT OF THE FENCES THERE BUT LOOKS LIKE IT'S BEEN TAKEN CARE
[02:15:01]
OF NOW.AND I DON'T WANT TO LOSE SIGHT OF HOW MUCH JERRY AND HIS TEAM HAVE PUT INTO KEEPING THIS A QUALITY PROJECT IN ADDITION TO HANDLING THE WATER, HIS WATER COMING OFF THE PROPERTY, AND THE WATER THAT HE'S INHERITING FROM PEYTONVILLE.
AND I AM HOPEFUL THAT WE CAN WORK, THE CITY CAN WORK WITH HIM TO FIND A GREAT RESOLUTION FOR THIS PROJECT AND THE NEIGHBORS DOWNSTREAM.
SO THANK YOU FOR ALL YOU'VE DONE AND YOUR ATTITUDE TOWARD DEVELOPING THIS PROPERTY.
WELL, YOU GUYS HAVE PRETTY MUCH COVERED IT ALL.
YEAH, I AGREE WITH EVERYTHING.
AS SOMEONE WHO LIVED IN CROSS TIMBER HILLS FOR TEN YEARS, THIS DEVELOPMENT AND THIS AREA HAVE A SPECIAL PLACE IN ME AND MY FAMILY'S HEART.
WE HAD ONE OF OUR YOUNGEST WHEN LIVING IN CROSS TIMBER HILLS, AND JUST WATCHING THEM, IT REMINDED ME OF MYSELF GROWING UP WHERE YOU COULD RUN AROUND THE NEIGHBORHOOD AND PLAY AND CLIMB TREES.
AND THIS IS THAT KIND OF NEIGHBORHOOD WHERE IT EMBRACES YOU, IT EMBRACES YOUR NEIGHBORS, YOUR FAMILY.
SO THANK YOU ALSO FOR ALL THE TIME YOU'VE TAKEN WORKING WITH EVERYONE.
I KNOW CITY STAFF HAS WORKED REALLY HARD AND BEEN WITH YOU ON THIS.
AND ON SUCH A COMPLICATED ISSUE.
AND AS COUNCIL MEMBER CHAGAS SAID, IT'S BEEN MONTHS, RIGHT? THIS IS NOT A, WE'RE GOING TO COME THROUGH, WE'RE GOING TO BUILD A COUPLE OF HOUSES HERE, AND WE'RE QUICK AND WE'RE DONE.
SUPER COMPLICATED AND HAS REQUIRED SO MUCH COORDINATION AND EFFORT.
AND I WANT TO ECHO THE APPRECIATION AND THANKS FOR THAT.
AND ALSO HOPE THAT, AS YOU ALL HAVE SAID, THAT IT HELPS OTHER DRAINAGE AND WATER ISSUES IN WHAT YOU'RE DOING IN YOUR DEVELOPMENT THAT YOU'RE GOING TO DO.
SO IT'S ALWAYS GREAT TO SEE SOMETHING HAVE A NET BENEFIT OUTSIDE OF WHAT WE'RE LOOKING AT.
SO I, TOO, I DID HAVE ONE QUESTION FOR YOU, JERRY.
ARE YOU GOING TO ALLOW THE HOMES IN THERE TO HAVE IRON FENCES? PARDON ME? ARE THE HOMES INSIDE THIS DEVELOPMENT, WILL THEY BE ALLOWED TO HAVE IRON FENCES IN THEIR BACKYARDS? YES.
I MEAN, WE'RE KIND OF LOOKING AT, IN SOME, DEPENDING ON THE LOTS, WE MAY NEED TO RESTRICT SOME FENCING, JUST ANIMALS ACCESSING THE WATER, STUFF LIKE THAT.
AND I ASK BECAUSE HAVING LIVED THERE, I KNOW ALL ABOUT THE WILDLIFE.
AND SOME OF IT YOU DON'T WANT NEAR YOUR SMALL DOGS.
ESPECIALLY ONES THAT FLY THAT ARE REALLY BIG.
IT'S NOT A QUESTION FOR JERRY, BUT IT'S JUST SOMETHING FOR COUNCIL.
I DO LIKE THE IDEA THAT WE MAKE THE MOTION SUCH THAT POST OAK AND WOOD CREEK, THAT THOSE EASEMENTS GO AWAY SO THAT SOMEWHERE UP THE ROAD SOMEBODY CAN'T CHANGE THEIR MIND AND SAY, NO, THERE WERE EASEMENTS THERE ORIGINALLY, AND NOW WE WANT TO HAVE A ROAD THROUGH THERE.
I'M SURE MAYOR PRO TEM CAN HANDLE THAT.
WELL, THAT'S A GREAT POINT, COUNCIL MEMBER SHARMA.
AND I DO HAVE THAT LISTED SPECIFICALLY WITH REGARDS TO WOOD CREEK, BECAUSE THAT'S THE NATURAL ONE THAT JUST DEADHEADS INTO IT.
I GUESS REGARDING POST OAK, FIRST OF ALL, CAN WE EVEN CONFIRM, IS THERE AN EASEMENT FROM POST OAK IN THERE? BECAUSE IF THERE'S NOT, WE DON'T NEED TO.
ARE YOU ASKING ME OR DENNIS? DENNIS, PROBABLY.
LOOKING AT THE PLOT, I DID NOT SEE AN ACCESS EASEMENT ON THERE.
I THINK THERE WAS AN INITIAL BELIEF THERE.
MAYBE IT WAS, OR THERE WAS AN ABILITY.
HOW ABOUT I'LL INCLUDE IT AS A IF THERE IS.
AND I WANT TO MAKE SURE, TOO, SO WHAT WE WOULD BE DOING, DIRECTOR KELO, IS WE WOULD BE GRANTING A VARIANCE TO WAIVE THE REQUIREMENT PER SECTION 503K1, SPECIFICALLY REGARDING WOOD CREEK LANE, AND THAT THE VARIANCE IS THAT IT WOULD NOT NEED TO BE CONNECTED TO THE DEVELOPMENT.
AND THEN IN ADDITION TO THAT, IF THERE'S A DESIRE TO PRESENT OR PREVENT ANY OF THE LOTS WITHIN THIS DEVELOPMENT TO UTILIZE THAT RIGHT-OF-WAY, YOU WOULD RESTRICT ANY ACCESS TO THOSE RIGHT-OF-WAYS.
YEAH, AND THAT'S WHAT, EARLIER WHEN WE DISCUSSED IT, THAT WOULD BE MY HOPE THAT WE COULD DO SO THAT WE DON'T END UP WITH THAT SITUATION AT SOME POINT WHERE SOMEONE SAYS THEY WANT TO BRING THEIR BOAT THROUGH THERE OR THEIR RV OR ANYTHING ELSE.
SO BASICALLY RESTRICTING ALL ACCESS TO WOOD CREEK FROM THIS DEVELOPMENT.
WOULD YOU LIKE TO ADDRESS IT? AS WELL AS POST OAK IN THE EVENT THERE IS FOUND THAT THERE IS AN EASEMENT.
[02:20:02]
YES.I THINK YOU JUST HAVE TO ADD IN ADDITION TO THE WORDS, YOU KNOW, WE'LL NOT BE CONNECTED, SO WE HAVE NO ACCESS.
I THINK THAT'S WHAT WE'RE GOING FOR, A FEW EXTRA WORDS.
AND THEN WE DIDN'T REALLY TALK ABOUT IT, BUT I'M ASSUMING SINCE WE DIDN'T, THERE WASN'T MANY COMMENTS, IS THE COUNCIL COMFORTABLE WITH IT REMAINING DATED? BECAUSE THAT'S ALWAYS A QUESTION MARK WE HAVE.
I KNOW I HAVE OTHER PROJECTS I WOULD SAY, NO, THEY'VE DONE SO MANY OUTSTANDING THINGS, I CAN LIVE WITH IT ON THIS ONE.
BUT IF YOU BRING ME ANOTHER ONE, I MAY NOT.
MAYOR AND COUNCIL, MOVE THAT WE APPROVE ITEM 7A, ORDINANCE NUMBER 480-840-Z825-0066, FIRST READING, ZONING CHANGE AND DEVELOPMENT PLAN FOR JAMES PLACE.
PROPERTY DESCRIBED AS LOT 1, JAMES CREEK ADDITION, AND TRACTS 3, 3C, 3C02, AND 3D, JADE SHELTER SURVEY, ABSTRACT NUMBER 253, AND LOCATED AT 1318, 1330, 1354, 1360, AND 1364 NORTH PAYTONVILLE AVENUE.
NOTING THIS IS SUBJECT TO THE REVISED STAFF REPORT DATED FEBRUARY 3, 2026, AND THE REVISED DEVELOPMENT PLAN REVIEW SUMMARY NUMBER 4 DATED FEBRUARY 3, 2026.
MOVING THAT WE'RE APPROVING THE FOLLOWING.
THE ZONING CHANGE AND DEVELOPMENT PLAN FOR A 22.27-ACRE SINGLE-FAMILY DEVELOPMENT CONSISTING OF UP TO 15 SINGLE-FAMILY LOTS, AS PRESENTED, NOTING APPROVAL OF THE FOLLOWING VARIANCES REQUESTED UNDER THE RESIDENTIAL PLANNED UNIT DEVELOPMENT REGULATIONS.
AND THOSE VARIANCES ARE ALLOWING A CUL-DE-SAC STREET TO EXCEED 1,000 FEET IN LENGTH, SECTION 5.03.I, SUBDIVISION ORDINANCE NUMBER 483, AS AMENDED, TO BE APPROXIMATELY 1,500 FEET IN LENGTH.
NOTING THAT WE'D BE GRANTING A VARIANCE TO WEIGH THE REQUIREMENT PER SECTION 5.03.K.1 OF THE SUBDIVISION ORDINANCE THAT THE EXISTING DEAD-END STREET LOCATED IN THE CROSS TIMBER HILLS ADDITION, SPECIFICALLY WOOD CREEK LANE, SHALL NOT BE CONNECTED TO THIS DEVELOPMENT.
IN ADDITION TO THAT, WE'RE RESTRICTING ANY SUCH CONNECTION FROM WOOD CREEK TO THIS DEVELOPMENT, AND THAT SAME RESTRICTION WILL APPLY IN THE EVENT POST OAK IS FOUND TO HAVE PREVIOUS DOCUMENTATION NOTING A CONNECTION.
I'M GOING TO PAUSE THERE, DIRECTOR KILLOUGH, IF THAT MEETS YOUR NEEDS.
NEXT, VARIANCE ALLOWING A PRIVATE, WE'RE APPROVING A VARIANCE ALLOWING A PRIVATE GATED STREET, AS PRESENTED, NOTING THAT THAT'S A VARIANCE TO SECTION 5.04, SUBDIVISION ORDINANCE NUMBER 483, AS AMENDED, AND FURTHER REQUIRING THAT THE PRIVATE STREET IS SUBJECT TO THE REQUIREMENTS OF 5.05, SUBDIVISION ORDINANCE NUMBER 483, AS AMENDED. NEXT VARIANCE IS ALLOWING RESIDENTIAL LOT COVERAGE OF 40 PERCENT, AS PROPOSED. NEXT WOULD BE ALLOWING A DETENTION AREA TO EXCEED 25 PERCENT OF OPEN SPACE AREA ONLY IF A STORMWATER OVERSIZING PARTICIPATION AGREEMENT WITH THE CITY IS REACHED, WHICH INCLUDES ADDITIONAL DETENTION CAPACITY. AND THEN I'LL PAUSE HERE AND GO BACK TO COUNCIL ON WHERE DID WE LAND ON SIDEWALK? DID WE WANT TO ESCROW THAT? DID WE WANT TO COMPLETELY WAIVE IT, JUST NOTING THAT IF WE COMPLETELY WAIVE IT, I'M NOT SURE WHAT YOUR OPPORTUNITY IS TO RECOUP THAT ONCE WE REACH THE POINT OF SIDEWALK. THANK YOU. I'D SAY WE CAN GO AHEAD AND ESCROW IT.
I MEAN, THAT'S TYPICALLY WHAT WE'VE DONE, BUT I'M NOT SURE IT'S EVER GOING TO HAPPEN, BUT, RIGHT. I MEAN, MY GUESS IS IT'S SUCH A SHORT SECTION, IF WE EVER DID DO A SIDEWALK OVER THERE. I MEAN, IT'S SO SHORT THAT IT CAN'T BE THAT MUCH MORE MONEY TO MOBILIZE, YOU KNOW, WHATEVER CONTRACTOR WAS INSTALLING THE SIDEWALK AT THAT TIME. BUT I'M GOOD EITHER WAY. I THINK THE BIGGEST CHANCE WOULD BE I DON'T THINK WE COULD PAY FOR IT, THOUGH, BECAUSE WE'D BE ON PRIVATE PROPERTY. WE'D HAVE TO GO TO HOMEOWNERS. I'D RATHER ESCROW IT AND JUST UNDERSTAND THAT AS PART OF ESCROWING, IF THE COST TRIPLES, THEN THAT'S ON US. THAT WOULD BE APPROPRIATE IF THE COST TRIPLES. RIGHT. YEAH, THAT'S WHAT I WOULD DO. OKAY, SO AS IT RELATES TO SO WE WILL NOT BE GRANTING THE VARIANCE TO WAIVE THE SIDEWALK REQUIREMENT PER SECTION 5.06 OF SUBDIVISION ORDINANCE. RATHER, WE'LL DIRECT STAFF TO WORK WITH THE APPLICANT ON THE APPROPRIATE ESCROW AMOUNT TO BE HELD FOR FUTURE USE OF SIDEWALK.
AND TO BE CLEAR, THAT WOULD JUST BE FOR SIDEWALK ALONG NORTH
[02:25:01]
PEYTONVILLE AVENUE ONLY.CORRECT. SO YOU WOULD NOT REQUIRE SIDEWALKS INTERNAL TO THE DEVELOPMENT? CORRECT.
THAT IS DULY NOTED THAT THIS WOULD BE SUBJECT TO JUST THE SIDEWALK AREA ALONGSIDE PEYTONVILLE. HOW'S THAT, DIRECTOR KEELEY? WE'RE GOOD.
IS ANY ATTORNEY GOOD WITH THAT MOTION? ALL RIGHT, WE HAVE A MOTION.DO WE HAVE A SECOND CAST YOUR VOTES PLEASE.
ITEM 7A IS APPROVED ON FIRST READING. WE WILL SEE YOU BACK HERE AT THE NEXT MEETING, FOR SECOND READING AND THAT IS AGENDA ITEM. MEETING ADJOURN.